HL-LHC FP7 DS Status of the proposal Lucio Rossi - CERN 3rd General Meeting for application preparation – CERN 20 October.

Slides:



Advertisements
Similar presentations
Preparation of the Self-Study and Documentation
Advertisements

EURO EURO 1)Welcome 2)Status of negotiations and GA 3) “ of Consortium Agreement 4) “ of website, mailing lists, logo, etc 5)Management Structure 6)Bodies.
FP7 Design study proposal Michele Punturo Harald Lueck.
Mandate of Parameter and Lay out Committee (PLC) of the HL-LHC project L. Rossi HL-LHC PC.
Management Structure and Responsibilities SUST-RUS
14 mars 2007M. Dracos, Neutrino Design Study1 Neutrino Oscillation Facility Design Study in FP7.
Proposals’ Preparation Support Procedure (Pilot programme: 10 months) - Research and International Relations Service University of Cyprus.
Supported by Project Administration Second Project Meeting London, 10/11 March 2009 Liv Becker / Veit Bürger, Öko-Institut e.V.
STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 WP 7 Scientific coordination First phase (M1-M6) QIUPING CHEN POLITECNICO DI TORINO STABLE.
1 EUDET Status Report NA1 Management Joachim Mnich Extended Steering Committee Meeting September 11, 2006.
Role of Management and Technical Coordination
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
NOV-3733-SL-9715 Carbones KOM - May 10-11, 2010 – Toulouse, France 1 KICK-OFF MEETING May 10-11, 2010.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Overview of EuCARD-2.
The Preparatory Phase Proposal a first draft to be discussed.
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
SLHC-PP Admin News Admin guide Time sheets Effort Web Pages 1 st Deliverable Report SLHC-PP Steering Committee Meeting CERN, July 3 rd, 2008.
1. Proposal deadline 2. Timeline  A grant opportunity announcement will include a sponsor deadline for receipt of the proposal.  The instructions will.
SuperB. SuperB has been approved as the first in a list of 14 “flagship” projects within the new national research plan. The national research plan has.
EPOCA – 11. June EPOCAConsortiumOrganisation.
Dr. Margaretha Mazura (EMF) ICT Day Opportunities to participate in EU ICT research projects San José, 16 February 2010 Principles of EU Research Funding.
Override Decision 2015 Sunnyside Community Responds.
HIPPI 05, Abingdon, Introduction to HIPPI05 -Few words on the life of HIPPI -A new HIPPI Management… -HIPPI 05 organization -Mandate for the.
Project Reporting for the EuCARD Integrating Activity Project Based on: - Provisions of the Grant Agreement (GA) and its annexes - FP7 Guide on Project.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Draft Collaboration Model for HLLHC-DS HLLHC-DS Meeting 20th July 2010.
The FP7 Inputs for building a project proposal AN INFORMATION POINT FOR FP7 IN PALESTINE: Training Seminar of experts Nicosia, Cyprus November.
AIDA negotiation process AIDA NCP Meeting,
An Integrated Project under EU 6th Framework Programme Kick-off meeting, Hamburg September 2004 Chris Hewitt, Met Office Hadley Centre, UK
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
ENV-NCP-TOGETHER PARTNER MEETING WORK PACKAGE 3 02/03/2010 c Beta Technology.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
EGEE is a project funded by the European Union under contract IST Collaboration Board F.Gagliardi Project Director Cork Conference, 20 th April.
Status of QUACO project
CARBOOCEAN Annual meeting, December 2007 Finance and administration by Hege D. Høiland SIXTH FRAMEWORK PROGRAMME PRIORITY “Global Change.
NSHIELD Project Meeting Brussels - 15 Feb 2012 Luigi Trono.
S 1 Annual Meeting 2013 Management and reporting (WP6) Chiara Bearzotti NACLIM project manager.
Ismar Project management issues the non-scientific side of NEAREST Alessandra Borgatti ASTER Nearest Kick-off meeting Bologna, 11 October 2006.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 Governance.
WP2 status and plans First PMT meeting, May , Strasbourg Françoise Genova WP2 status and plans.
CARE Governing Board R. Aleksan CERN, April 5, Meeting objectives 2.General financial overview 3.Conclusion.
Negotiation of Proposals Dr. Evangelos Ouzounis Directorate C DG Information Society European Commission.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
FP7 HiLumi LHC Design Study Lucio Rossi CERN. Structure of the project HL-LHC and the FP7 HiLumi FP7 Design Study
HL-LHC Organization: Now and post HiLumi
Use of resources and EC funding in year 2 EuCARD Governing Board meeting , CNRS, Paris Overview of EuCARD WPs and budget Use of resources by.
EUROPEAN RESEARCH AND INNOVATION OFFICE 4 th FLUTCORE Progress Meeting September 23 rd 2015 – London WP9 - Project Management Amelie Guisseau UCL European.
AIDA Governing Board meeting 30 March 2012, DESY Use of resources in Y1 and distribution of EC pre-financing (2nd installment) S. Stavrev, CERN Administrative.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Fabrizio Gagliardi EGEE Project Coordinator EGEE is proposed as a project funded by the European Union under contract IST
Как се подава проектно предложение по 7РП Емилия Домусчиева г., София.
SC meeting R. Aleksan February 11 th TIARA 1.General Information 2.Final Budget 3.Meeting Objectives 4.Organizational matters 5.Kickoff meeting 6.Conclusion.
TECHNICAL QUALITY MANAGEMENT Technical Quality Management Co-funded by the Prevention, Preparedness and Consequence Management of Terrorism and other Security-related.
Review Preparation Meeting of the FP7 Project J-AGE Vienna 25th March 2015.
J-AGE I Status/Closing Report JPI MYBL - GA Meeting Brussels 21th January 2016.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
WP leaders meeting R. Aleksan October 5 th, 2009 TIARA 1.Objectives 2.WP management 3.General rules 4.Conclusion Work Packages.
GC meeting R. Aleksan February TIARA 1.Meeting objectives 2.General Information 3.Final Budget 4.Consortium Agreement 5.Next meetings 6.Conclusion.
Consortium Agreement Kari-Jouko Räihä. Characteristics  Origin Basis: UNECA (Unified Network of Excellence Consortium Agreement) Terminology adapted.
11/19/ Third Meeting of the EuCARD Steering Committee 1 EuCARD Management Report J.P. Koutchouk, S. Stavrev for the Coordination Office.
Deliverables, final review and final reporting
Social Dialogue Plenary Meeting
WP1 - Consortium coordination and management
EMI Project Processes and Tools
Office of Grant Resources
ANTICORRP ANTICORRP General Assembly Meeting Administrative update
Preliminary Project Execution Plan
LHC Computing, RRB; H F Hoffmann
Presentation transcript:

HL-LHC FP7 DS Status of the proposal Lucio Rossi - CERN 3rd General Meeting for application preparation – CERN 20 October

HL-LHC project structure (very preliminary)

Actvities beyond the Design (NOT complete and subject to change)

Governance Collaboration Board (1 representative per institutes). Decision by vote, but CERN-DG may veto critical decision. PC + deputy ex-officio (no vote). Scientific Advisory Board (appointed by CB) Project Coordinator (PC) and Deputy(ies), supported by an agile Coordination Office Steering Committe (SC): WP coordinators and deputies. All WP, also the one non-FP7. WP coordinators and deputies. Appointed by the CB under proposal of PC (by PC the first time)

Partners

New deadlines Writing general part (Lucio) : 29 October Final text of various WPs: 29 October (WP1 and WP5 !) First budget: 22 October First iteration on budget closed: 5 November Given to CERN Directorate for approval: 5 November Letter sent to Directors for engagement: 5 November Final iteration on content and budget : 10 November Final text of application for last reading: 18 November Application 23 November (deadline 25 November)

Preliminary committment (not binding, just a moral one) Dear Director, In order to consolidate the FP7 HL-LHC proposal on High Luminosity LHC Design Study, I wish to ask you the commitment of your lab to include in its work programme the activities as planned with the scientists of your laboratory, to commit to the estimate of the matching funds and deliverables. Please find attached a bread-down of the costs, EU-funding and matching costs, together with an estimate of the manpower needed. For more information on the work package contents, the HL-LHC web site offers a description of each tasks and of its deliverables ( -> Works Packages), the IA structure with the names of the coordinators ( -> IA Structure) and miscellaneous information that may be useful. The deadline for submitting the proposal being onNovember 25 th, we kindly ask you to give us an answer by before November 22 th at the latest. Whenever possible, earlier answers will be very helpful to consolidate in time the application. With best regards, FP7HL-LHC DS coordinator Lucio Rossi ps: the formal and binding commitments shall be made at signature of the Consortium Agreement, if the proposal is accepted. Different format from US and J labs (no money from EU): what type?