TGC Electronics Status Osamu Sasaki 23 Dec. 2004 河口湖 SLB ASIC PS-Board H-pT Board Star Switch Sector Logic Other boards Procurement 2004 極み.

Slides:



Advertisements
Similar presentations
20/Oct./2000 CF IEEE NSS 2000 at Lyon,France 1 An MWPC Readout Chip for High Rate Environment Introduction ASIC Structure & Fabrication ASIC Evaluation.
Advertisements

S. Veneziano, Lecce 21 February 2002 RPC readout and trigger electronics status Lecce 21/02/2002.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
8th Workshop on Electronics for LHC Experiment, Colmar, France, 10 Sep R.Ichimiya, ATLAS Japan 1 Sector Logic Implementation for the ATLAS Endcap.
FDR of the End-cap Muon Trigger Electronics 1/Mar./04 1 Beam Test of TGC electronics in 2003 Introduction Electronics Setup Stand-alone Run Setup Data.
Endcap Muon meeting: Florida, January 9-10, 2004 J. Hauser UCLA 1 TMB, RAT, and ALCT Status Report Jay Hauser University of California Los Angeles ALCT/Mezzanine.
Alice EMCAL Meeting, July 2nd EMCAL global trigger status: STU design progress Olivier BOURRION LPSC, Grenoble.
RPC Electronics Status Overall system TDC –Digitizing frequency issue (determine the bin size of the TDC value) Discriminator test result Trigger module.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Introduction/Overview AFE-IIt firmware development VLSB firmware development Hardware progress.
Uli Schäfer 1 JEM: Status and plans JEM1.2 Status Test results Plans.
Uli Schäfer 1 Production and QA issues Design Modules have been designed, with schematic capture and layout, in Mainz (B.Bauss) Cadence design tools, data.
Uli Schäfer 1 JEM1: Status and plans power Jet Sum R S T U VME CC RM ACE CAN Flash TTC JEM1.0 status JEM1.1 Plans.
David Nelson STAVE Test Electronics July 1, ATLAS STAVE Test Electronics Preliminary V3 Presented by David Nelson.
PRR on Patch-Panel ASIC 9 Dec. 2002KEK SOS Overview LVDS Rx Variable Delay BCID Test Pulse Generator Control Radiation tests Mass-production and inspection.
Various Topics Related to FEB Liang Han, Ge Jin University of Science and Technology of China Dec.21,2013.
Upgrade developments in Clermont-Ferrand Romeo Bonnefoy and François Vazeille Tilecal upgrade meeting (CERN, 13 June 2014) ● Handling tools ● Deported.
FDR of the End-cap Muon Trigger Electronics 1/Mar./04 1 Slice Test (SLT) of TGC electronics Introduction Simulation Trigger part SLT Wire Wire and Signal.
October 1st th Workshop on Electronics for LHC Experiment at Amsterdam 1 Beam Test Result of the ATLAS End-cap Muon Level-1 Trigger Chikara Fukunaga.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
CF 8/June/2003 ATLAS muon week in Gallipoli 1 The 1 st Beam Test of TGC electronics at H8 in May/June ‘03 Chikara Fukunaga on behalf of TGC electronics.
TGC Big wheel Sector assembly plan Tatsuo Kawamoto ATLAS workshop 2005.
Prototype Test of SPring-8 FADC Module Da-Shung Su Wen-Chen Chang 02/07/2002.
FEE Electronics progress Mezzanine manufacture progress FEE64 testing and VHDL progress Test mezzanine. Trial mechanical assembly 10th November 2009.
14/November/2002 CF NSS2002 in Norfolk, Virginia, USA 1 The First Integration Test of the ATLAS End-cap Muon Level 1 Trigger System Introduction Overview.
S.Veneziano – INFN Roma July 2003 TDAQ week CMA LVL1 Barrel status ATLAS TDAQ week July 2003.
Leo Greiner IPHC meeting HFT PIXEL DAQ Prototype Testing.
LANL FEM design proposal S. Butsyk For LANL P-25 group.
11th March 2008AIDA FEE Report1 AIDA Front end electronics Report February 2008.
CSC EMU Muon Sorter (MS) Status Plans M.Matveev Rice University August 27, 2004.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
Global Trigger H. Bergauer, Ch. Deldicque, J. Erö, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H.
14/6/2000 End Cap Muon Trigger Review at CERN 1 Muon Track Trigger Processing on Slave and Hi-pT Boards C.Fukunaga/Tokyo Metropolitan University TGC electronics.
Serial Data Link on Advanced TCA Back Plane M. Nomachi and S. Ajimura Osaka University, Japan CAMAC – FASTBUS – VME / Compact PCI What ’ s next?
Status of shaper prototype production B.G. Cheon (Hanyang U)‏ Dec. KEK 1 st open meeting of the Super KEKB Collaboration.
FDR of the End-cap Muon Trigger Electronics 1/Mar./04 1 Hi-pT Board Hi-pT ASIC Board Type Endcap-wire Endcap-Strip Forward Chikara Fukunaga (TMU)
FDR of the End-cap Muon Trigger Electronics 1/Mar./04
Status of NA62 straw electronics Webs Covers Services Readout.
PSI - 11 Feb The Trigger System of the MEG Experiment Marco Grassi INFN - Pisa On behalf of D. Nicolò F. Morsani S. Galeotti.
Mar. 18, 2009 HAPD ASIC Status Super KEKB Meeting 1 S.Nishida (KEK) S. Nishida HAPD ASIC Status Super KEKB Meeting Mar. 18, 2009 KEK.
ATLAS Muon Week in Seattle 30/June/04 1 Test Beam of TGC electronics in 2004 Introduction Member List Electronics Setup TGC Setup Overlap problem in 2003.
TGC Timing Adjustment Chikara Fukunaga (TMU) ATLAS Timing Workshop 5 July ‘07.
1 October 2003Paul Dauncey1 Mechanics components will be complete by end of year To assemble ECAL, they need the VFE boards VFE boards require VFE chips.
Tracker Week October CCLRC, Rutherford Appleton Laboratory, Oxon, UK Imperial College, London, UK Brunel University,
US CMS DOE/NSF Review, May Cal. Trig. 4 Gbaud Copper Link Cards & Serial Link Test Card - U. Wisconsin Compact Mezzanine Cards for each Receiver.
14/Sept./2004 LECC2004 Irradiation test of ASIC and FPGA for ATLAS TGC Level-1Trigger System 1 TID (  -ray) and SEE (proton) tests and results for ROHM.
TGC-electronics commissioning before beam collision Y. Sugaya Osaka-U アトラス総会2004 12/23 河口湖.
CERN, 18 december 2003Coincidence Matrix ASIC PRR Coincidence ASIC modifications E.Petrolo, R.Vari, S.Veneziano INFN-Rome.
CF 16/Feb/20031 H8 Beam Test in 2003 ─ Preparation status TGC-Japan electronics group.
2001/02/16TGC off-detector PDR1 Sector Logic Status Report Design Prototype-(-1) Prototype-0 Schedule.
LHCb Calorimeter Upgrade Meeting – 10th September 2012 – CERN LHCb Calorimeter Upgrade Electronics: ASIC solution status E. Picatoste, D. Gascon Universitat.
US CMS DOE/NSF Review, 20 November Trigger - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status.
PSI - 11 Feb Status of the electronic systems of the MEG Experiment.
The 1st Result of Global Commissioning of the ATALS Endcap Muon Trigger System in ATLAS Cavern Takuya SUGIMOTO (Nagoya University) On behalf of TGC Group.
NA62 straw readout Characterization and qualification of the frontend electronics Detector and interface to frontend Small readout system Plans Expected.
.1PXL READOUT STAR PXL READOUT requirement and one solution Xiangming Sun.
CSC Ops/DPG meeting, 05-Oct-2011 Hauser1 ALCT boards for ME4/2 etc.
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
29 May 2009 Henk Boterenbrood, Augusto Ceccucci, Bjorn Hallgren, Mauro Piccini and Helmut Wendler 1 The Calorimeter Recorder CARE.
TDC/TEL62 update M. Sozzi NA62 TDAQ WG meeting Bruxelles – 9/9/2010.
TGC electronics meeting at CERN June/ Status of ASIC development for TGC electronics PP SLB Hi-pT JRC PPE SSW-rx VME protocol Chikara Fukunaga TGC.
Jan. 25, 2011 Status of the Aerogel RICH Readout Trig/DAQ Meeting in Beijing 1 S. Nishida (KEK) S. Nishida Status of the Aerogel RICH Readout Belle II.
H-pT ASIC A.The logic of H-pT ASIC 1. overview 2. matrix, encoder, selector… B. Test result 1. verification 2. electrical characteristics C. Usage.
Work on Muon System TDR - in progress Word -> Latex ?
Sector logic firmware and G-link Merger board designs
Iwaki System Readout Board User’s Guide
PRR of the TGC SLB and SSW (Reported by CF)
Hall A Compton Electron detector overview
TMB, RAT, and ALCT Status Report
Status of Slave Board (SLB) ASIC
PID meeting Mechanical implementation Electronics architecture
Presentation transcript:

TGC Electronics Status Osamu Sasaki 23 Dec 河口湖 SLB ASIC PS-Board H-pT Board Star Switch Sector Logic Other boards Procurement 2004 極み

TGC Electronics DCS LCS CPU DCS-PS

SLB ASIC (1) Bugs of Version 4 (May ’04)  痛恨の極み –Timing violation at memory WRITE cycle (from L1 Buffer to De- randomizer Buffer) Any error does not appear when De-rand. Buffer is empty (no read- out queue). Between Address and WEB : 0.3ns timing violation is shown by the simulation, which is taking into account the wire length and the load after the layout. –Overflow counter of De-rand. Buffer does not work. –The start number of L1ID shall be 0, not 1. Version 4-ECO (Oct. ’04)  唖然 –Modification at gate layout level on CAD –Additional delay (10 buffers) to clock signals for the address counter. Improved, however the error couldn’t be fixed perfectly. The additional delay (1.2 ns) is NOT enough. Large input capacitance of WEB 0.25pF –Skip a F/F for Overflow counter The Overflow counter does work properly. –The bug of L1ID was not touched.

SLB ASIC (2) Version 5 (Nov. ’04)  絶句 –Modification from HDL level and improvement of timing margin –The bugs of Version 4 were fixed. –However, DOES NOT work at 40 MHz, up to 30 MHz. Serial-to-Parallel converters of read-out part (four 220-shift- registers) limit the speed. A CLK signal from a buffer with lowest driving power drives 440 D-F/Fs of the S-P converters. –Obsolete design compiler (2000 Synopsys) was used, with un-proper options. –Careless check after the layout !

SLB ASIC (3) Version 4-ECO2 –Further modification of Version 4-ECO –Modification at gate layout level on CAD –Additional delay (20 buffers : 2.4ns) to clock signals for the address counter. –Buffers in front of each WEB input port of the memory –Margin of the timing between ADDRESS and WEB is 2.5 ns. –Simulation using the back-annotated Standard Delay Format (SDF) file Except for memory write cycle (modification at gate layout level). Read-out works at up to 70 MHz and Trigger Matrix up to 54 MHz. –Submitted 29/Nov. and chips in Feb. ‘05

SLB ASIC Version 4-ECO2 (delay and buffer)

SLB ASIC (4) Version 6 –Modification of Version 5 from HDL level –Design compiler (Rev Synopsys) with proper option setting –Each WEB port of the memories is driven by an individual buffer (BUF6). –The numbers of fanouts for all signals are checked to be within reasonable numbers. –Full simulation using the back-annotated Standard Delay Format (SDF) file. Except for INPUT BLOCK Margin of data write cycle in memories is larger than 1.8 ns. Read-out works at up to 69 MHz and Trigger Matrix up to 54 MHz. –To be submitted in 2004.Chips in Feb. –Mass-production takes two months. (April-May) –Inspection takes one month.

PS-Board 1344 PS-Boards and 100 Service Patch-Panel Boards are used for the system. – 6 varieties of PS-Boards for TRIPLET PS-Pack PCBs of EWT0 will come in Dec.. Schematics of EWT1 finished. FT1, EWT2, EST and FT0by end of March –10 varieties of PS-Boards for DOUBLETS PS-Pack Designby end of July –1 varieties for PS-Boards for EI/FI TGCs. 9U, 160mm VME-like board in HSC crate. –Universal PS-Boards were developed for Test Beam and Test Assembly. 24 PS-Boards are available. –PS daughter boards were mass-produced. –Mass-production for Triplet Test of prototype boards by end of May. PCBs in April-June. Assembly in May-July. Inspection in June-Aug.

H-pT Board and Star Switch Board H-pT Board (192 boards) –3 varieties of boards (endcap wire, endcap strip and forward) H-pT ASICs have been mass-produced. –Forward H-pT Board was used at Test Beam. Minor modification will be done. –Designs for Endcapby end of March SSW Board (< 200 boards) –All Anti-fuse FPGAs Irradiation tests of the parts have completed. –SSW are being debugged at KEK. The SSW is working at up to 48 MHz. Comprehensive test will follow.

Sector Logic and other boards 48 Sector Logic Boards for Endcap and 24 Sector Logic Boards for Forward –Design of the final version has started. 100 Service Patch-Panel Boards –To be ordered in Jan. Trigger module for commissioning –Substitute for H-pT and SL –Cosmic-ray trigger for 1/12 –Schematics finished this week. Inspection boards for H-pT ASIC and SLB ASIC –Boards were assembled and being debugged.

Procurement Parts of ladders for PS-PacksFIN. –Except for long bars for Doublets Cases for PS-Boards and Service Patch-Panel –Ordered. All parts of cases come in March. To be Assembled with PS- Boards and DCS Boards at CERN. CAT6 cables for PS-Boards to H-pT/SSW –Labeled at both ends –Tendering on 22 Dec. LV cables for Triplet –Cables from LV Distributor Boxes to PS-Boards –Labeled at both ends –To be ordered in Dec. LV Distributor Boxes –To be ordered in Jan. Electronics parts –Most of them were ordered and delivered. –FPGAs for SLs and OE/EOTendering on 22 Dec.

2004 痛恨の極み –SLB ASICs 繰り返しで何度も使えない言葉 遺憾の極み –Collaboration within Japan with/against Israel 感極まる –Wine 中村(よ)結婚おめでとう。