Silicon RunIIb Workshop, Dec. 12-13, 2002 - A. Bean, M. Demarteau Slide 1 Workshop  Workshop is to “Move beyond the Technical Design Proposal”  Many.

Slides:



Advertisements
Similar presentations
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
Advertisements

LHCC referees meeting, 10 October 2005Børge Svane Nielsen, NBI1 Status of the FMD LHCC referees meeting, 10 October 2005 Børge Svane Nielsen Niels Bohr.
1 US Testing Status-Anthony AffolderModule Testing Meeting, Dec. 11, 2003 Update of US Testing Status Anthony Affolder On behalf of the US testing group.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
GLAST LAT Offline SoftwareWorkshop - SLAC, Jan , 2001 R.Dubois Lehman Review Feb Joint NASA/DoE review My understanding: –“The purpose of the.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
G. Cosmo & M.G. Pia. The Training Kit Project Gabriele Cosmo & Maria Grazia Pia Geant4 Workshop Paris, October 2000
W. Freeman, D0 PMG 25-Feb-03 1 Run IIb Schedule Status u Schedule Status u Update on near-term equipment expenditures u Budgeting Update u Summary.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
Dzero RunIIb Sensor PRR, August 8, Marcel Demarteau Slide 1 DØ Inner Layer Sensor Production Readiness Review August 08, 2003 M. Demarteau, G. Ginther.
Sergey Korjenevski KSU The Run IIb Silicon Tracker Workshop, Dec 12-13, out of 23 Status update and Test results for Run2b Si sensors at KSU Sergey.
13 Dec. 2007Switched Capacitor DCDC Update --- M. Garcia-Sciveres1 Pixel integrated stave concepts Valencia 2007 SLHC workshop.
NSW SG 19 Nov Nov 2014 S. Zimmermann, NSW SG 1.
ALICE ITS Coordination Board 16 July 2013 L. Musa 1.
F R&D on Monolithic and Vertically Integrated Pixel Detectors Special Focus Meeting Marcel Demarteau LCWS08 November 17, 2008 Chicago.
Pixel Upgrade Status and Plan G.M. Bilei Firenze Mar. 6 th 2013.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
DCS Workshop - L.Jirdén1 ALICE DCS PROJECT ORGANIZATION - a proposal - u Project Goals u Organizational Layout u Technical Layout u Deliverables.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Lehman DOE Review, September 24-26, M. Demarteau Slide 1 Lehman DOE Review September 24-26, 2002 Marcel Demarteau Fermilab ‘ The DØ Run 2b Silicon.
Bagby, Foglesong General Silicon Meeting Run IIb LVPS Status  Design Goals  Key Issues  System Diagrams  Prototype – 1%  Plans.
Status & Plans of the CBM-MPD STS CONSORTIUM Yuri Murin for the CBM STS Consortium JINR-SINP-KRI-SPbSU-SESRITIIE-BITP-IHEP –(ITEP)- GSI.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
Design Discussion of Mechanical / Electrical Interfaces Bill Cooper (Fermilab) (Layer 1) VXD.
G. Carboni – Muon Meeting – April 2002 Muon Meeting LHC schedule is now official (Council Committee) First protons (Pilot run) delayed to
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
PMG, Aug 03, 2000 Slide 1 Schedule In preparation Done Started Done Started Half done.
DZero RunIIb PMG June 7, Run IIb Project Status Vivian O’Dell.
Ronald Lipton Layer 0 Status PMG Sep Status of the Layer 0 Project – emphasis on hardware status, preproduction, and preparations for shutdown work.
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
F Axis NO A Status NO A Collaboration Meeting Fermilab 17 November 2006 Gary Feldman.
L0 Technical Readiness Review-Electronics Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage s Filter.
DZero Run IIb PMG January 28, Agenda Run IIb D-Zero PMG January 28, 2003  Overview, issues (Kotcher)  Project status (O’Dell)  Trigger technical.
Tevatron II: the world’s highest energy collider What’s new?  Data will be collected from 5 to 15 fb -1 at  s=1.96 TeV  Instantaneous luminosity will.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
1 Silicon Testing at KSU Sergey Korjenevski Kansas State University 06/18/2002 (11 slides total)
Rev of Run IIb, Nov 4-8, 2002, A. Bean 1 Silicon Management  Organization and Management  Schedule  Resources  Conclusions Alice Bean Univ. of Kansas.
A.Nomerotski,2/3/ Layer0 Status Andrei Nomerotski 2/3/2005 Outline  Introduction  Module Production  Assembly of Layer0  Electronics  System.
Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage u High.
V. O’Dell, D0 RunIIb PMG 4-Feb Dzero Run IIb PMG  Agenda u Overview & Management News: V. O’Dell u Trigger Upgrade Status:P. Padley u Silicon closeout.
Dzero RunIIb Sensor PRR, August 8, Marcel Demarteau Slide 1 DØ Inner Layer Sensor Production Readiness Review August 08, 2003 M. Demarteau for the.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
DZero Run IIb Rev Nov 05 ‘03 1 Kotcher Agenda (from Rebaselining Review)  Introduction (Kotcher – 10’)  Trigger & DAQ/Online (Wood – 30’) u AFE II/TriP.
RAL, Apr H.Weerts SiD Workshop Summary, Next Steps & Life beyond the LOI H.Weerts Argonne National Lab.
Electronics: Junction Cards, Adapter Card, Purple Card, …. Ron Sidwell, K. Harder, T. Sobering, R. Taylor, E. VonToerne, Kansas State U.
Overview of a Plan for Simulating a Tracking Trigger (Fermilab) Overview of a Plan for Simulating a Tracking Trigger Harry Cheung (Fermilab)
Brenna Flaugher Sept. 24 th Lehman Review1 Run IIB Silicon Upgrade: Cost and Schedule Lehman Review Sept. 24, 2002 Brenna Flaugher Run IIB Silicon Project.
Run Iib Workshop Dec 12-13, 2002 Silicon sensors procurement and quality assurance WBS Regina Demina Kansas State University.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
12/17/01 Ron Sidwell 1 Run2b Datapath 17 Dec Update Bill Reay, Ron Sidwell, Noel Stanton, Russell Taylor, Kansas State University.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
Management February 20, Annual Review of the Muon Accelerator Program (MAP) Subcommittee members: Ron Prwivo, Ron Lutha, and Jim Kerby.
PHENIX Vertex Detector with Conventional Strip Sensors Abhay Deshpande Stony Brook University.
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
DZero Run IIb PMG December 10, Agenda Run IIb D-Zero PMG December 10, 2002  ESAAB news (Lab, Project, DOE)  Project status, overview (Kotcher)
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Run2b Silicon Detector Design goals of Run2b Si system Stave design Silicon sensors Schedule K. Hara (U. Tsukuba)
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Dzero Collaboration Meeting, Sept. 14, M. DemarteauEric Flattum - Fermilab 1 Slide 1 Alice Bean Fermilab/University of Kansas for the D0 Run2b silicon.
A New Inner-Layer Silicon Micro- Strip Detector for D0 Alice Bean for the D0 Collaboration University of Kansas CIPANP Puerto Rico.
Dr.F. Arteche EMC DEPFET Project: A general overview.
Steinar Stapnes, LHCC June The ATLAS inner detector TRT endcap A+B TRT endcap C TRT barrel SCT barrel SCT endcap Pixels uWhole ID sits inside bore.
T Project Review Sotanorsu I2 Iteration
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
How to organize ourselves Rich Partridge, Marcel Demarteau for the Tracking Group SiD Tracking Meeting December 8, 2006 Tracking Review at Beijing.
P. Morettini Towards Pixel TDR PM - ITk Italia - Introduction 8/2/2017.
TK Upgrade report.
Presentation transcript:

Silicon RunIIb Workshop, Dec , A. Bean, M. Demarteau Slide 1 Workshop  Workshop is to “Move beyond the Technical Design Proposal”  Many areas where we have to go beyond a design proposal and need to come up with a real design and start implementing it  Many areas where we have to freeze the design and set a course of action »Schedule is extremely tight »All parts of the detector affect each other  Areas where we have to start filling in all the details  We’d like to use a workshop as a forum to meet some of these goals  Workshop will be a regular occurrence for the Silicon RunIIb group  Agenda limited, but focused, to address immediate issues  Workshop will have a set of goals to be addressed during the meeting  Project schedule will be a recurring theme »where should we be according to the schedule »what resources are needed »how we are going to accomplish what we need to accomplish  Workshop will have a summary to review:  needs of various groups within the project  items not accomplished at the workshop and to set a timetable to achieve them

Silicon RunIIb Workshop, Dec , A. Bean, M. Demarteau Slide 2 Workshop Agenda  Thursday morning: Sensors  09:30Layer 1 sensor measurements - Sergey Korjenevski  10:30Break  11:00 ELMA Processing details - Mikhail Merkin  11:30Status Stony Brook Site- Bob McCarthy  12:00Sensor work to be done for PRR- Regina Demina  Thursday afternoon: Readout Electronics  01:30Summary Current noise issues- Dan Edmunds  02:00Overview Horseshoe area- Linda Bagby  02:30Adapter Card Testing - Ron Sidwell  03:00Mapping - Eckhard von Thörne  03:30 Break  04:00LV Power Supplies- John Foglesong  04:30Status Twisted Pair / Junction Card- Andrei Nomerotski  05:00Cooling Manifolds and Cable Path- Bill Cooper  05:30 Break

Silicon RunIIb Workshop, Dec , A. Bean, M. Demarteau Slide 3 Workshop Agenda  Friday Morning: Staves  09:00 Results from Mechanical Staves - Bill Cooper, Kurt Krempetz,Jim Fast  10:00 Grounding issues with Staves- Marvin Johnson  10:30 Break  11:00 Stave Discussion - All  Friday Afternoon: Testing  01:30SVX4 Status - Kazu Hanagaki  02:00Electronics Status Report- Andrei Nomerotski  02:30Grounding and Testing L0/1 - Kazu Hanagaki  03:00Hybrid Status and Testing Plans- Andrei Nomerotski  03:30 Summary - Alice / Marcel  04:00 Wine and Cheese Seminar

Silicon RunIIb Workshop, Dec , A. Bean, M. Demarteau Slide 4 Workshop Goals  Goals  Complete comparison ELMA and HPK sensors  Filled out sensor vendor evaluation form  Decide on vendor ELMA, HPK if possible  Determine what is needed for PRR for layer1/0 sensors and set time scale for PRR  First pass at measuring specs of outer layer sensors (?)  Decide on physical parameters of adapter card  Decide on low voltage regulation and separate DVDD and AVDD or combined  Agree on mapping scheme for whole detector  Complete design of LV system  Decide on junction card area location  Decide on stave cores: materials and freeze all dimensions  Worked out grounding scheme for staves  Decide on coherent plan for hybrid production and testing  …

Silicon RunIIb Workshop, Dec , A. Bean, M. Demarteau Slide 5  This is the last meeting of the year  Next year’s schedule  Silicon meeting on ‘off-weeks’ Thursday, 10:00-12:00am »allows all geographical sectors to participate at reasonable hours »hopefully this will not change anymore for the remainder of the project  Level 3 managers meeting on ‘on-weeks’ Tuesday, 8:30-10:30am »Meeting dedicated to status, schedule, resources once a month »Progress will be carefully monitored by the Lab’s upper management »We should be pro-active in our role to adhere to the schedule  Next week is the ESAAB meeting at which point a decision will be taken by the Office of High Energy and Nuclear Physics of DoE how to proceed with RunIIb  After a week of heated arguments, agreement between LBL and Fermilab yesterday to proceed with ‘only’ two versions of the SVX4 chip, a ‘minimal’ chip (version A) and a ‘better performance’ chip (version B) with a likely layout on the reticle of 1:5 for A:B News

Silicon RunIIb Workshop, Dec , A. Bean, M. Demarteau Slide 6 Schedule Status  There are 134 milestones in the silicon schedule  Only look at those shifted with respect to Lehman open symbols: Lehman filled: current

Silicon RunIIb Workshop, Dec , A. Bean, M. Demarteau Slide 7 Schedule Status  Only those delayed with respect to Lehman (19)

Silicon RunIIb Workshop, Dec , A. Bean, M. Demarteau Slide 8 Status  Focus on:  Sensor Probing Equip Setup And CertF. Complete (11/6/02) »Missed  Silicon Prototype Mechanical Stave Built (12/16/02) »Major milestone at which point final stave design will be chosen  Sensors »Probing and testing of outer layer sensors »Probing and testing of inner layer sensors »Layer 0 design layout »PRR for inner / outer layer sensors  Staves »Proceeding as quickly as possible from a mechanical stave to an electrical stave with associated module assembly  Testing »Hybrid testing »Vertical slice tests, 1% and 10% »Burn-in stands  Radiation monitors and software

Silicon RunIIb Workshop, Dec , A. Bean, M. Demarteau Slide 9 R&D Profile  Cost profile for R&D M&S and Labor funding  Equipment spending should not prevent you from proceeding with the project