Asbestos in Soil Greg Holt Stapleton Redevelopment Program City and County of Denver October 3, 2008.

Slides:



Advertisements
Similar presentations
Revised Environmental Site Assessment Guidelines & Asbestos Inspection Guidelines for Bridges.
Advertisements

New York City Department of Education Charter Matching – Facilities Upgrades/ Capital Improvements – FY 2014.
Certification of Compliance By Evita Lagard
REGULATORY OVERVIEW.
March  The last library millage proposal took place 11/8/94.  Per Michigan state law, a district library’s operating tax may not exceed 4 mills.
BoRit Superfund Site Timeline
Vermilion County Brownfield Assessment Grant. Overview Brownfield Basics USEPA Brownfield Assessment Grant Vermilion County Assessment Grant Site Selection.
2012 US EPA Brownfields Cleanup Grant ‘Central Greens’ City of Indianapolis Department of Metropolitan Development November 15, 2011.
Denver Federal Center Calibration Silo Removal Project What are the DFC Calibration Silos? Installed in 1981 by Bureau of Mines Support minerals industry.
U.S. EPA Regulations Review Update: Subpart W NESHAPS (40 CFR 61) Uranium and Thorium Mill Tailings (40 CFR Part 192) Andrea Cherepy, Phil Egidi, Reid.
Summitville Gold Mine Disaster
Presented to: FAA Airport Pavement Working Group By: Murphy Flynn Date: April 24, 2012 Federal Aviation Administration Construction Update.
Vance County Water District Overview and Update Jordan McMillen Director Vance County Planning and Development Department 156 Church St. Suite 3 Henderson,
RIVER RANCH ORGANICS AN ENFORCEMENT ODYSSEY. Parvaneh Byrth Riverside County LEA Phone:
AMBLER BOILER HOUSE REDEVELOPMENT AMBLER BH DEVELOPMENT PARTNERS, LLC RT ENVIRONMENTAL SERVICES, INC.
1 MASSACHUSETTS UNDERGROUND STORAGE TANK (UST) PROGRAM Baseline Compliance Assessment 1 MassDEP 8/2/2011.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
Proposed Modification of Policies for Rural Employment Centers Policy 6.3 of the Future Land Use Element of the Alachua County Comprehensive plan CPA
Brownfields Redevelopment in Indiana… Partnerships That Make A Difference! Indiana’s Brownfields Program Indy Brownfields Forum April 14, 2005 Andrea Robertson.
BIOENERGY SYMPOSIUM 2013 ANAEROBIC DIGESTION Regulations Ollie Frazier, P.E., MBA.
COMPLIANCE WITH GRANT IMPLEMENTATION PROCEDURES TxDot Grant Fund Project.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Overview of Regulatory Changes, Policy and Implementation Colleen Brisnehan Colorado Department of Public Health And Environment Hazardous Materials and.
TRANSPOSITION AND IMPLEMENTATION OF THE IPPC, LCP, SEVESO II, VOC DIRECTIVES – EXPERIENCE AND LESSONS LEARNT Kalin Iliev Nikolay Savov Ministry of Environment.
Denver Federal Center Calibration Silo Removal Plan What are the DFC Calibration Silos? Installed in 1981 by Bureau of Mines Support minerals industry.
Possible Timeline for Environmental Regulatory Requirements for the Utility Industry Pending EPA air and water pollution regulations for coal plants have.
Sterling TIF Districts Joint Review Board Meeting October 28, 2010.
Energy for the Future Belene Nuclear Power Plant Project Status.
Brownfields and Community Gardens. Purpose  The purpose of this presentation is to provide an overview of the Brownfields Program and how it can service.
State and Tribal Government Working Group November 12, 2008 FERNALD NATURAL RESOURCE DAMAGES SETTLEMENT.
UC Berkeley Richmond Field Station Remediation and Restoration Project January 16, 2008 Town Hall Meeting Agenda 1.Project Background 2.Recent Activities.
Past and Present Efforts. History – Early acid rock drainage and wetlands investigations 1989 – US Forest Service Special Use Permit for pilot.
Cap-and-Trade Regulation Program Update September 20, 2012.
McClain County Multi- Jurisdictional Multi-Hazard Mitigation Plan Update Image from
Intervention – 2004 Nanisivik Reclamation and Closure Plan Arctic Bay June 3-4, 2004 Nunavut Water Board Public Hearing.
City Council Meeting December 15, 2015 Planning Division File No. CUP
Mold Remediation & Remediation Contractors 2011 National Tribal Forum on Air Quality Institute for Tribal Environmental Professionals (ITEP) & National.
Amendment 1 Sorority Expansion Master Plan. The University of Alabama / Sorority Expansion Master Plan 2010 Photo Before Redevelopment Began.
1 UPDATE ON SHELLEY’S SERVICE CONTRACT Y PD Utilities Department Orange County Board of County Commissioners November 15, 2011.
Case Study – A Brownfield Cleanup in the City of Amsterdam, NY Joseph S. Campisi Geomatrix Consultants, Inc.
Marian Anderson Place Site Update City Commission Special Workshop December 14, 2015.
CHRYSLER NORTH ASSEMBLY PLANT| PREPARING A SITE FOR EXPANSION William Burkett, R.S., City of Toledo Michael Coonfare, CP, Hull & Associates, Inc. APRIL.
The Dalles, Industrial Certification Northwest Aluminum Company The Dalles, Oregon Douglas C. MacCourt Ater Wynne LLP US German Bilateral Working.
The City of Rochester New York Environmental Institutional Control System Prepared By: Mark Gregor City of Rochester, New York Division of Environmental.
Hurricane Ike Recovery CITY OF GALVESTON March 26, 2015.
GEORGIA PACIFIC WEST PROPOSED INTERIM ACTION Public Meeting & Open House – July 12, 2011.
BROWNFIELDS 2005 Dealing with Unexpected Contamination Lowry Air Force Base Redevelopment Denver, CO Tom Markham, Executive Director, Lowry Redevelopment.
From Pink Motel to Fire House Site History Site originally developed in 1950 Hotel closed and abandoned in 1996 Assessments under the Nye County Brownfields.
Uniform Environmental Covenants Act Brownfields 2009 November 18, 2009 Kieran P. Marion Legislative Counsel, Uniform Law Commission.
Richland Creek Water Supply Program Update Paulding County, Georgia Board of Commissioners Work Session March 08, 2016.
Former Naval Fuel Depot Point Molate December 8, 2014 Summary of IR Site 3 Remediation and Abatement Work to Date Point Molate Naval Fuel Depot Richmond,
Update on the Richland Creek Reservoir and Water Supply Program Paulding County, Georgia Board of Commissioners Workshop Briefing May 26, 2015.
Data Center Stabilization
Western Michigan University Central Power Plant
Teacher Evaluation Timeline
Redevelopment & Rehabilitation Projects
Redevelopment Authority of the County of Washington O
A TOUR OF FLORIDA’S BROWNFIELDS REDEVELOPMENT PROGRAM
Sustainable Redevelopment
Excess Liability Trust Fund Claims Section (ELTF)
Greeley’s TIF Toolbox EDCC Overview 2017: Oct 3.
Green Energy and Green Spaces
Valley & Third Streets Redevelopment
CR3 and Crystal River Energy Complex
Waste Asphalt Shingles & Dealing with Sham Recyclers
345 kV Bailey-Jones Creek Project Anticipated Project Schedule
City Council Meeting November 14, 2016
Harbour Island Force Main Replacement
345 kV Bailey-Jones Creek Project Anticipated Project Schedule
Presentation transcript:

Asbestos in Soil Greg Holt Stapleton Redevelopment Program City and County of Denver October 3, 2008

Stapleton Redevelopment Stapleton Airport closed in 1995 Largest Brownfield Urban Project 4000 Acres 2900 acres Developable 1100 acres Open Space Redevelopment began in 1998 Three programs: Environmental Demolition Airfield Pavement Removal

Development Land Transfer Environmental Standards –Stapleton Numeric Criteria-SNC City, EPA and State of Colorado –Certification from Property Owner –NFA/NAD for Environmental Sites Approximately 120 NFA’s received Master Developer Chosen

Asbestos Under Regulation Building abated prior to demolition 50% of the Fuel Distribution System Utilities: Water Electric Communication/ Telephone

Asbestos in Soil Lowery and Buckley Regulation Change - May 2006 Land Transfer Requirements Industry Changes –Environmental Site Assessments –Sophistication of Asbestos Abatement Contractors –Close out reports / NFA Requests

Highline Canal Phase 1 Filing 16 History City Purchased the land for airport expansion mid 1950’s Lateral of the Highline canal Canal backfilled with mixed waste Overall site was backfilled for runway expansion-mid 1960’s

Filing 16 Timeline Environmental Assessments- 6/04 and 1/05 Site Characterization- Summer 2005 Work Plan Approved by CDPHE - Fall 2005 Insurance Acceptance of Claim Fall 2005 Project Bid - November 2005 Contractor Selected - January 2006 NTP – March 2006 Abatement – April Current

Filing

Filing

Filing 16 Timeline Work Plan Approved by CDPHE - Fall 2005 Joint meeting with CDPHE - March 2006 Original Work Plan amended 3 times Development of site wide work plan Creation of Clearance Protocol -Fall 2006 Suspension of Work Plan- October 2008

Filing 16 Original Scope of Work –Est. 120,000 yds 70,000 yds Non- Friable ACM 50,000 yds Friable ACM Area approximately 40 acres Duration 180 days Actual –Est. 730,000 yds 480,000 yds Non- Friable ACM 250,000 yds Friable ACM Area increased to 105 acres Duration 29 months

Filing 16

Suspension of Work Why? City reached Sitewide Cap on costs Insurance reimbursement –Slow in payments –Payments in arrears.

Filing 16 Suspension of Work Site Status Canal Cleared 88% of the total site has been cleared 15% of the site has been backfilled Remaining area is under a stockpile.

Filing 16 Suspension of Work Site Security Site Stabilization Protection of Human Health and Environment Air Monitoring

Filing 16 Insurance Reimbursement Original Scope of Work $7,000, Estimate to Completion $50,000,000.00

Stapleton Asbestos One site complete - closure report and NFA submitted Two sites complete –awaiting submittal Two sites in progress Five sites not started

Stapleton Lessons learned Site size- Unit pricing Type of equipment to be used Wetting methods Material – Friable Non-Friable Mixture Mechanical means Use of excavators, graders, other heavy equipment Soil preparation Methods to achieve “adequately wet”

Stapleton Questions