S-2S memo WC Toshiyuki Gogami 24Apr2015.

Slides:



Advertisements
Similar presentations
100[ch] 0.28[ps/ch] 200[ch] 0.54[ps/ch] TDC-calibration.
Advertisements

Measuring Cosmic Ray Flux with a trigger and CAMAC readout - Page 1 Connect the Fluke 415 HV supply output to the input of the voltage distribution box.
COSMIC RAY MUON DETECTION USING SCINTILLATION COUNTER AND WAVELENGTH SHIFTING FIBERS ARUNODAYA BHATTACHARYA VSRP-2009,TIFR,MUMBAI 6/7/09.
Shantanu Menon Thomas Irons Michael Jacoutot. Cosmic Rays  High energy particles (mainly protons) from outer space.  Have up to 10 million times more.
Figure 5. Histogram of the decay constant. Black curves: raw histograms; Blue curve: Gaussian fit to the histogram from the 20GS/s waveform; Red curve:
Experimental Method Experimental Method Kihyeon Cho Kyungpook National University Spring Semester 2005 Experimental Method and Data Process.
Kuno-Group B4 Yuuki Matsumoto A report for Graduation research Development of Trigger Board for MPPC (for MuSIC experiment) A report for Graduation research.
TOF0 calibration The resolution in a given pixel can be measured before the absolute time calibration (see the plot) The expected total resolution of the.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Feb, 13, 2008.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Oct, 3, 2007.
Pre-shipping PMT screening at Chiba Chiba University Shigeru Yoshida for Kazuhiro “ Jee ” Fujimoto.
RPC Electronics Status Overall system TDC –Digitizing frequency issue (determine the bin size of the TDC value) Discriminator test result Trigger module.
PMT SPE Chiba (new parameters for next version of ROMEO) (new parameters for next version of ROMEO) Yusuke Hasegawa et al., presented by.
Calibration of the 10inch PMT for IceCube Experiment 03UM1106 Kazuhiro Fujimoto A thesis submitted in partial fulfillment of the requirements of the degree.
1 Apr. 28, 2007 Test of the Pulse Height and Time Jitter for the IHEP Full-Size RPC’s with 8-m-Long Readout Strip Planes C. Lu, K. McDonald and W. Sands.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting July 18, 2007.
Cosmic Ray Test Stand with Scintillating Cells for Digital Hadron Calorimeter As of 9am 05/28/2003.
1 Initial Tests of DHC Tower Update - 09/03/2003 Kurt Francis, Donna Kubik - Northern Illinois University.
Integrating High-Speed ADCs in the SRS System for Scintillating Detectors in PW- laser Driven Physics Experiments Sorin Martoiu (IFIN-HH, Bucharest)
Conducting a Test Beam Experiment - Page 1 To begin with, elect an experimental spokesman, who can act as a coordinator. Survey the area to understand.
1 M. Bonesini - CM 25 RAL 5/11/09 PID status report M. Bonesini Sezione INFN Milano Bicocca.
K1.8 meeting Report from E05 group Toshiyuki Gogami 26 Dec 2014.
TOF Monitor System Status F. Harris U. of Hawaii June 13, 2006.
Calibration of the calorimeter by punch-through muons and cosmic muons Doroshenko M. E391 collaboration.
DAQ Map of Electronic Components L. Adeyemi, A. Camsonne, E. Fanchini, JS. Real, R. Suleiman, E. Voutier May 24, 2012.
S-2S MEMO Toshiyuki Gogami 17 May Contents Analysis results of WC test.
ArgonneBeamTest_ ppt1 Argonne Beam Test preparation Tsunefumi Mizuno Tuneyoshi Kamae
K.C.RAVINDRAN,GRAPES-3 EXPERIMENT,OOTY 1 Development of fast electronics for the GRAPES-3 experiment at Ooty K.C. RAVINDRAN On Behalf of GRAPES-3 Collaboration.
ArgonneBeamTest_ ppt1 Argonne Beam Test preparation Tsunefumi Mizuno Tuneyoshi Kamae
March 12, 2006R. Abrams LCWS06 Bangalore1 ILC Prototype Muon Scintillation Counter Tests Robert Abrams Indiana University.
22nd February 1999Ian Lazarus NPG, CLRC1 TDR for data processing 22nd February 1999 Ian Lazarus Nuclear Physics Group CLRC, Daresbury Lab.
1 Cosmic Rate Overview Rustem DZHELYADIN (CERN&IHEP, Protvino) The Set-up: Scintillating counters HV setting Coincidence adjustment Accidentals.
Electronics and data acquisition system of the extensive air shower detector array at the University of Puebla R. Conde 1, O. Martinez 1, T. Murrieta 1,
Julien Bettane, Giulia Hull, Silvia Niccolai, Daria Sokhan 31/1/2012 Status and commissioning plan for the Central Neutron Detector.
Yury Gurchin June 2011 MEASUREMENT OF THE CROSS-SECTION IN DP-ELASTIC SCATTERING AT THE ENERGIES OF 500 AND 880 MEV AT NUCLOTRON.
Malte Hildebrandt, PSIMEG - Review Meeting / 1   e  Drift Chambers Charge Division Test Chamber Testsetup for Cosmics Chamber Construction.
1 New TOT design for the LAV F.E. electronics M. Raggi, P. Valente G. Corradi, D. Tagnani LNF electronic service TDAQ Working Group 29/05/2009.
TELL1 high rate Birmingham Karim Massri University of Birmingham CEDAR WG Meeting – CERN – 26/03/2012.
DAQ Map of Electronic Components R. Suleiman February 12,
Using an Oscilloscope Learning Objectives Understand the basic operation of a Cathode Ray Tube Understand what an oscilloscope is displaying Be able to.
Status 29/09/15. Trigger system: - Scintillator system : scintillator+pmt, discriminator+ coincidence module -TLU module + PC + USB cable Detectors :
HES HKS collaboration meeting 3/11/2010 T.Gogami.
S-2S MEMO New WC test 13 May 2015 Toshiyuki Gogami.
MPPC mass check Hidetoshi OTONO. Change point ADC Gate width : 6ns => 35ns Gain mesurement without LED.
1 Plans for first beams - - triggers from the BRM group (BSC, BPTX) Gábor Veres for the BRM group CMS Trigger Technical Coordination Meeting 8 October,
Performance of Trigger counter for WC test Toshiyuki Gogami 3Dec2014.
Nuclear Instrumentation. CEU 2014 Waikoloa Resort Hawaii.
D. Bertrand, J. De Bruyne, P. De Harenne, L. Etienne, S. Hannaert, G. Van Beek The Arch.
EMCAL Calibration & Assembly at Yale University Mark Heinz, Project Mgr EMCAL Meeting Nantes July 15, 2008.
May E906 Work and Status TDC readout – One full TDC board, 4 ECL cables/modules KTEV UCLA LV PS – Thanks Dave N.! – +/- 5V, 18A each – Spade /10-12AWG.
External Trigger System PAB To provide straight muon track efficient selection for TPC performance characterization Adjustable geometry for.
HCAL1 Status 2004 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance in 2004 General design High Voltage system LED monitoring 2. Stability in 2003 Led.
Seoul National University Han-wool Ju CUNPA Kick-off Meeting Aug.22-23, 2013.
PARISROC V2 Tests and Results on the TDC Sébastien Drouet – Bengyun Ky – Eric WanlinIPN Orsay.
Trigger system for setup 2016 V. Rogov, V. Yurevich,D.Bogoslovski, S.Sergeev, O.Batenkov* LHEP JINR *V. G. Khlopin Radium Institute, St. Petersburg.
VC98 March 07Jean-Sébastien GraulichSlide 1 DDAQ Status o DAQ Software o Front-End and Trigger o What will happen soon o Schedule Milestones Jean-Sebastien.
Work 蘇益弘. Work- plateau delay cosmic ray flux perl.
Status Report of Tile Calorimeter at Korea Calorimeter meeting 2005/6/13 Youngdo Oh Kyungpook National University.
S-2S meeting Toshiyuki Gogami 15 Oct Contents TOF detector Kyoto University.
Forward Tagger Calorimeter Prototype tests at Jlab: report CLAS12 Workshop February 22, 2012 A. Celentano.
S-2S MEMO WC detector test 2015/6/10 Toshiyuki Gogami.
“Performance test of a lead glass
ETD meeting Electronic design for the barrel : Front end chip and TDC
LNF - Beam Test Facility Apr. 28 – May 03
Summer 2000 HF Beam Test. DAQ proposal.
First shashlyk module cosmic test result
Conceptual design of TOF and beam test results
TOF Clock Distribution
Mott DAQ Timing R. Suleiman February 12, 2014.
Presentation transcript:

S-2S memo WC Toshiyuki Gogami 24Apr2015

Contents WC test with cosmic ray at Rm.319 Experimental setup HV setting Electric circuit ELOG

Experimental setup Gravity SIDE VIEW PMT(H UV) y z x Plastic scintillator (TOF1) Plastic scintillator (TOF2)

HV setting HV ChannelNamePMTIDHV setting [V] 1TOF1H7195RD TOF2H WC1H UVZK WC2H UVZK

TOF1 TOF2 WC1 WC2 TOF1 ADC (CH11) TOF2 ADC (CH13) WC2 ADC (CH7) WC1 ADC (CH4) TOF1 TDC (CH11) TOF2 TDC (CH13) WC1 TDC (CH4) WC2 TDC (CH7) Discriminator Coincidence Gate Generator 100 ns delay 100 ns Variable delay Discriminator 105 ns delay Discriminator 100 ns delay

Used ADC and TDC modules (Camac) ADC: 豊伸 C009 (16 channel) TDC: 豊伸 C021 (16 channel)

Trigger for LED (calibration) data F.G. Level Adapter Gate Generator LED Pulse signal TTL out NIM

ELO G