Do other companies like BMW Group use manufacturing standards to guide performance at their plants? 1.Yes 2.No.

Slides:



Advertisements
Similar presentations
CHAPTER 10 The Need for Standards Standards Are common in business They are often imposed by government agencies (and called regulations) Standard costs.
Advertisements

Chapter 11 Flexible Budgeting and the Management of Overhead and Support Activity Costs Chapter 11: Flexible Budgeting and the Management of Overhead and.
Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Chapter Eleven Flexible Budgets and Overhead Analysis.
©2002 Prentice Hall Business Publishing, Introduction to Management Accounting 12/e, Horngren/Sundem/Stratton Flexible Budgets Distinguish between.
Cost Variances for Fixed and Variable Overhead Variances for Variable Overhead Variances for Fixed Overhead.
Copyright © 2006, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Flexible Budgets and Overhead Analysis Chapter Eleven.
1-1.
Using Variances under Standard Cost System
23 Performance Evaluation Using Variances from Standard Costs
Flexible Budget, Overhead Cost Variances and Management Control
Standard Costs and Balanced Scorecard
Budgeting and Standard Cost Systems Chapter 13. Budgeting A budget is a financial and quantitative plan for the acquisition and use of resources Use for.
©2002 Prentice Hall Business Publishing, Introduction to Management Accounting 12/e, Horngren/Sundem/Stratton Chapter 8 - Flexible Budgets and Variance.
Financial and Managerial Accounting
8-1 Fundamental Managerial Accounting Concepts Thomas P. Edmonds Bor-Yi Tsay Philip R. Olds Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights.
CHAPTER 8 Performance Evaluation. The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-2 Learning Objective LO1 To describe flexible and static budgets.
Chapter 23 Flexible Budgets and Standard Cost Systems
Do most companies like Netflix try to understand how the costs of the company behave? 1.Yes 2.No.
Chapter 25-1 Chapter 25 Standard Costs and Balanced Scorecard Accounting Principles, Ninth Edition.
Copyright © The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin 11 th Edition Chapter 11.
@ 2012, Cengage Learning Performance Evaluation Using Variances from Standard Costs LO 4 – Computing Factory Overhead Variances.
IES 342 Industrial Cost Analysis & Control | Dr. Karndee Prichanont, SIIT 1 The Flexible Budget and Standard Costing Chapter 13 Objectives: Develop and.
Factory Overhead Planned, Applied & Actual
24-1. CHAPTER 24 C ONTROL THROUGH S TANDARD C OSTS.
1 Click to edit Master title style Performance Evaluation Using Variances From Standard Costs 7.
Performance Evaluation Through Standard Costs
11-1 Islamic University of Gaza Managerial Accounting Standard Costs and Balanced Scorecard Chapter 6 Dr. Hisham Madi.
Ch.11 Exercises Norwall Company’s Flexible budget manufacturing overhead (in condensed form) is given below : The following information is available for.
Principles of Managerial Accounting Chapter 11. Static Budget Set at the beginning of a budgeting period and that is geared to only one level of activity.
Standard Costing and Variance Analysis
Slide 11-2 CHAPTER 11 Standard Costs and Variance Analysis Standard Costs and Variance Analysis.
Variances Short summary. Static Budgets A static budget ( master budget) is prepared for only one level of a given type of activity. All actual results.
1 Chapter Eleven Standard Costs and Variance Analysis.
Standard Costs Managerial Accounting Prepared by Diane Tanner University of North Florida Chapter 43.
@ 2012, Cengage Learning Performance Evaluation Using Variances from Standard Costs LO 2 – Understanding How Standards are Used in Budgeting.
McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 10. Are standards the same as budgets? A standard is the expected cost for one unit. A budget is the expected cost for all units. Standards vs.
Standard Costing System Chapter 4 Managerial Accounting Concepts and Empirical Evidence.
©2005 Prentice Hall Business Publishing, Introduction to Management Accounting 13/e, Horngren/Sundem/Stratton Flexible Budgets and Variance Analysis.
©2014 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publically accessible website, in whole or in part.
Do all companies evaluate the profitability of products and regions? 1.Yes 2.No.
Performance Evaluation and Using Variances Chapter M6.
AC239 Managerial Accounting Seminar 7 Jim Eads, CPA, MST, MSF Performance Evaluation Using Variances from Standard Costs 1.
Accounting Principles Using Excel for Success PowerPoint Presentation by: Douglas Cloud, Professor Emeritus Accounting, Pepperdine University.
AC239 Managerial Accounting Seminar 7 Jim Eads, CPA, MST, MSF Performance Evaluation Using Variances from Standard Costs 1.
Copyright © The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin 11 th Edition Chapter 11.
Flexible Budgeting and Analysis of Overhead Costs CHAPTER 11 Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution.
AC239 Unit 7 Chapter 23 Performance Evaluation Using Variances from Standard Costs.
Part 1 Study Unit 7 Review Jim Clemons, CMA.
9-1 Standard Costing: A Functional-Based Control Approach 9.
Chapter 17 Inventory & Control What we will cover: n Standard costs n Variance Analysis.
Chapter 17 Overhead Cost Management Flexible Budgets.
Chapter 23 Flexible Budgets and Standard Cost Systems.
C Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, or posted to a publicly accessible website, in whole or in part.
25-1 Both standards and budgets are predetermined costs, and both contribute to management planning and control. There is a difference:  A standard is.
Predetermined Overhead Rates and Overhead Analysis in a Standard Costing System Appendix 11A Appendix 11A: Predetermined Overhead Rates and Overhead Analysis.
17 Flexible Budgets, Overhead Cost Management, and Activity-Based Budgeting.
Flexible Budgets and Overhead Analysis
Power Notes Chapter M6 Performance Evaluation, Variances from Standards Learning Objectives 1. Standards 2. Budgetary Performance Evaluation 3. Direct.
Chapter 22 Performance Evaluation Using Variances from Standard Costs
Flexible & Static Budgets
STANDARD COSTS AND VARIANCE ANALYSIS FOR DECISION MAKING
Foundations and Evolutions
Prepared by: C. Douglas Cloud Professor Emeritus of Accounting Pepperdine University © 2011 Cengage Learning. All Rights Reserved. May not be copied, scanned,
Performance Evaluation Using Variances from Standard Costs
Standard Cost Accounting Materials, Labor, and Factory Overhead
Variance Analysis–A Tool for Cost Control and Performance Evaluation
Power Notes Chapter 21 Performance Evaluation, Variances from Standards Learning Objectives 1. Standards 2. Budgetary Performance Evaluation 3. Direct.
Power Notes Chapter M6 Performance Evaluation, Variances from Standards Learning Objectives 1. Standards 2. Budgetary Performance Evaluation 3. Direct.
Presentation transcript:

Do other companies like BMW Group use manufacturing standards to guide performance at their plants? 1.Yes 2.No

Do you think there is a uniform set of manufacturing standards which companies in similar industries (i.e. automotive industry) use to guide their performance? 1.Yes 2.No

Do companies like BMW Group have software or computer programs to help set manufacturing standards for their companies? 1.Yes 2.No

Do you think that it is difficult for a company like BMW Group to create manufacturing standards for its plant? 1.Yes 2.No

Do companies like BMW Group change their manufacturing standards each year? 1.Yes 2.No

Only manufacturing businesses use standards to evaluate and control operations. 1.True 2.False

Standards should be revised when they differ from actual costs. 1.True 2.False

Standards can be used for direct materials, direct labor and factory overhead. 1.True 2.False

An unfavorable cost variance results when actual cost is greater than standard cost at actual volumes. 1.True 2.False

A flexible budget may be used to determine the impact of changing production on fixed and variable factory overhead costs. 1.True 2.False

A nonfinancial performance measure is a performance measure expressed in dollars. 1.True 2.False

The total factory overhead cost variance is the difference between the actual factory overhead and the total overhead applied to production. 1.True 2.False

Accounting systems that use standards for manufacturing costs are called 1.process cost systems 2.job order cost systems 3.budget cost systems 4.standard cost systems

The difference between a standard cost and an actual cost is called a 1.cost variance 2.cost inefficiency 3.control variable 4.marginal variance

Standards that can be achieved only under perfect operating conditions are called 1.normal standards 2.ideal standards 3.currently attainable standards 4.variable standards

Standards for direct materials, direct labor and factory overhead can be separated into which two components? 1.a price standard and a normal standard 2.a price standard and a variable standard 3.a price standard and a quantity standard 4.a normal standard and a quantity standard

A budget performance report will show 1.actual costs 2.standard amounts for the actual level of production achieved 3.the difference between actual costs and standard amounts 4.all of these choices

The total direct materials cost variance is equal to the 1.sum of the materials price variance and the materials quantity variance 2.difference between the materials price variance and the materials quantity variance 3.product of the materials price variance and the materials quantity variance 4.materials price variance

The total direct labor cost variance is equal to the 1.direct labor rate variance 2.sum of the direct labor rate variance and the direct labor time variance 3.difference between the direct labor rate variance and the direct labor time variance 4.product of the direct labor rate variance and the direct labor time variance

In computing factory overhead variances, the standard overhead rate is determined by 1.dividing the budgeted factory overhead costs by the standard amount of productive activity 2.dividing the budgeted factory overhead costs by the actual amount of productive activity 3.dividing the actual factory overhead costs by the standard amount of productive activity 4.dividing the actual factory overhead costs by the actual amount of productive activity

The variable factory overhead controllable variance is 1.the difference between the standard variable overhead incurred at actual production and the budgeted variable overhead for actual production 2.the sum of the actual variable overhead incurred and the budgeted variable overhead for actual production 3.the difference between the actual variable overhead incurred and the budgeted variable overhead for actual production 4.the difference between the actual variable overhead incurred and the standard variable overhead for actual production

If the standard fixed overhead exceeds the budgeted overhead at 100% of normal capacity, the variance is 1.not able to be determined 2.neither favorable nor unfavorable 3.unfavorable 4.favorable