RTF Custom Protocols: Background, Issues and Critical Elements February 8, 2012 Regional Technical Forum Subcommittee on Impact Evaluation and Custom Protocol.

Slides:



Advertisements
Similar presentations
4 basic approaches to determining energy efficiency benefits (savings) 1.Stipulated or deemed savings 2.Individual Building Metering – Measurement and.
Advertisements

Project Proposal: Multifamily Weatherization UES Scoping Study Regional Technical Forum June 1 st, 2011.
UPDATE ON GROCERSMART 4.0 RESEARCH PLAN Regional Technical Forum May 3, 2011.
Direction on Guidelines Savings Definition Path Results of straw vote and proposed decisions for elements of the savings definition Regional Technical.
D EEMED M EASURE R EVIEW P ROJECT Final Report December 7, 2010 Regional Technical Forum Presented by: Michael Baker.
RTF Lighting Standard Protocol Review of Hours of Operations, Controls Savings, and Variation.
BPA Guidelines for Measurement & Verification of Energy Efficiency Measures Presented at Brown Bag Session November 29, 2006.
+ Impact Evaluations and Measurement and Verification First we will focus on ‘Gross Savings’ Determination - savings determined irrespective of why 1 Kentucky.
1/14 Policies/Programmes to Promote the Development of ESCO 5 March, 2012 APERC Workshop, Kuala Lumpur Bing-Chwen Yang Team Leader Asia Pacific Energy.
MEASUREMENT & VERIFICATION
Page 1 July 2014 Capacity Building of Banks/FIs For EE Project Financing Capacity Building of Banks and Financial Institutions for Energy Efficiency Project.
There is Much More to Protocols than Good M&V Steve Kromer Chair, IPMVP Inc. Paolo Bertoldi European Commission DG JRC.
Mary Matteson Bryan, P.E Bi-Level Office Lighting with Occupancy Sensors E3T Field Assessment Mary Matteson Bryan, P.E. January 14, 2011.
USDOE SEP/ARRA Evaluation Webinar Guidelines for States Conducting or Contracting Evaluations of ARRA Funded SEP Activities June 16, 2010 June 17, 2010.
RTF 2012 Workplan Statements of Work January,
Prescriptive Duct Sealing UES Measure Proposal Regional Technical Forum Subcommittee July 8, 2013.
Creating Research proposal. What is a Marketing or Business Research Proposal? “A plan that offers ideas for conducting research”. “A marketing research.
Industrial Pump Motor VFDs: Provisional Standard Protocol Christian Douglass Regional Technical Forum 5/12/2015.
Fan VFD Calculator Development Staff Request for Authorization of Funding from the Regional Technical Forum 28 June 2011.
Night Covers on Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30,
Implementer’s Group April 2015 Meeting Debrief and Upcoming Meeting Prep April 24, 2015.
Pump VFD Provisional Standard Protocol Regional Technical Forum June 18, 2013.
Regional Technical Forum End-use Load Shape Business Case Project Project Initiation Meeting Portland, OR March 5, 2012.
1 SIMPLIFIED VOLTAGE OPTIMIZATION M&V PROTOCOLS Regional Technical Forum August 4, 2009.
D RAFT S TANDARD P ROTOCOLS February 1, 2011 Regional Technical Forum Presented by: Michael Baker.
Guidelines for the Development and Maintenance of RTF- Approved Measure Savings Estimates December 7, 2010 Regional Technical Forum Presented by: Michael.
Overview of the Regional Technical Forum Guidelines January 22, 2013.
Non-Res Lighting Subcommittee Retrofit Lighting Standard Protocol Review 04/03/14.
MBCx Projects – Programs, Process, and Results Soda, Tan, Shields and Wurster David Jump, Ph.D., P.E., Matt Denny, P.E. Quantum Energy Services & Technologies,
GrocerSmart™ 4.0 RTF Subcommittee Approval of Adherence to Guidelines March 10, 2011.
Main Headquarters: 120 Water Street, Suite 350, North Andover, MA With offices in: NY, ME, TX, CA, OR Standard Protocol for Non-Residential.
Forecasting and Verifying the Energy Savings for Web-Enabled Thermostats in Portable Classrooms: William E. Koran, P.E. Quantum Energy Services and Technologies.
April, 2002Energy Audits1 April, 2002 Ryan Stroupe, Pacific Energy Center DeAnza College: ES 76 Energy Reliability and Your Organization Energy Auditing.
EvergreenEcon.com ESA 2011 Impact Evaluation Research Plan Public Workshop #1 February 20, 2013 Presented By: Steve Grover, President.
Refrigerator Decommissioning: Measure Status Update Regional Technical Forum October 16, 2013.
Update: Grocery Refrigeration Provisional Standard Protocol for Site Specific Savings RTF Meeting June 28,
RTF Delivery Verification Guidance Batch 1 Jennifer Anziano Regional Technical Forum May 12, 2015.
BPA M&V Protocols Overview of BPA M&V Protocols and Relationship to RTF Guidelines for Savings and Standard Savings Estimation Protocols.
Forecasting and Verifying Energy Savings for Web-Enabled Thermostats in Portable Classrooms: William E. Koran, P.E. Quantum Energy Services and Technologies.
Experience you can trust. Phase 1: Cataloguing Available End-Use and Efficiency Load Data September 15, 2009 End-Use Load Data Update Project.
2011 RTF Projects RTF Input on SOW Outlines: - Deemed Measure Reviews - Measure Life Guidelines -Measure Cost Guidelines Regional Technical Forum April.
M&V Plan Template Lia Webster, Nexant New Orleans M&V Summit May 2003.
Standard Protocol Development for Advanced RTU Control Retrofit August 15, 2013 Presentation to: Regional Technical Forum RTUG Subcommittee Sponsored by:
+ Websites California Measurement Advisory Council Collaborative for Energy Efficiency 1 Kentucky PSC 9/11/09 Schiller Consulting, Inc.
Integration Issues for RTF Guidelines: Savings, Lifetimes and Cost/Benefit October 24, 2012 Regional Technical Forum Presented by: Michael Baker, SBW.
Regional Technical Forum Automated Conservation Voltage Reduction Protocol.
Electric / Gas / Water MAESTRO Evaluation Showcase July 26-27, 2006 Project Manager: Pierre Landry, SCE Lead Consultants: Mike Rufo, Itron; Keith Rothenburg,
RTF Management Update Jennifer Anziano Regional Technical Forum February 18, 2015.
Annual Reporting Working Group Update Lia Webster, Nexant New Orleans M&V Summit May 2003.
Chapter Fourteen Communicating the Research Results and Managing Marketing Research Chapter Fourteen.
Proposed Rooftop HVAC Standardized Field Measurement Protocol and Annual Savings Calculator RTUG REVIEW January 31, 2012.
SEEM Calibration for Manufactured Housing Regional Technical Forum December 13, 2011 Analysis Performed ByAdam Hadley Cursory Reviews ByTom Eckman, Ben.
SEEM Calibration for Multi-Family Buildings Regional Technical Forum September 18, 2012 Analysis Performed By Ben Larson, Jon Heller, Henry Odum, and Carmen.
Comparison of CA Evaluation Protocols, CA Framework, IPMVP and CPUC Policy Manual* A preface to group discussion *In terms of how they define.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Presented by: Todd Amundson, BPA Jane Peters, research into action Ryan Fedie, BPA Update.
Regional Technical Forum Recommissioning commercial retail facilities: A whole building approach to energy savings April 7th, 2009 Presented by: Jeremy.
REBUILD AMERICA. Why look at the bills? l Bills are the bottom line –they prove the savings!
Guidelines Overview Michael Baker January 20, 2016.
G UIDELINE R EVISIONS – R ELEASE February 1, 2011 Regional Technical Forum Presented by: Michael Baker.
Non-Res Code Compliant Lighting: Working Toward a Standard Protocol Christian Douglass, RTF Contract Analyst Non-Residential Lighting Subcommittee October.
Residential Single Family Clothes Washer UES Measure Update Regional Technical Forum September 16, 2014.
Exterior LED Area Lights
1 1 DISTRIBUTION EFFICIENCY INITIATIVE (DEI) Benefits on Both Sides of the Meter RTF MEETING February 5, 2008.
RTF Management Updates Jennifer Light Regional Technical Forum February 17, 2016.
GrocerSmart™ 4.0 RTF Approval of Software and Adherence to RTF Guidelines April 5, 2011.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
UES MEASURE REVIEW PROJECT Final Report March 14, 2012 Regional Technical Forum Presented by: Jeff Romberger.
Guidelines for RTF Measure Costs and Benefits Guidelines (formerly Cost and Non-Energy Benefits Guidelines) Proposal of Guidelines to the Regional Technical.
The Role of Simulation in the 2010 Highway Capacity Manual ITE Western District Annual Meeting June 28, 2010 Loren Bloomberg/CH2M HILL Santa Ana, CA
Presentation transcript:

RTF Custom Protocols: Background, Issues and Critical Elements February 8, 2012 Regional Technical Forum Subcommittee on Impact Evaluation and Custom Protocol Presented by: Michael Baker, SBW Consulting, Inc. Jeffrey Romberger, SBW Consulting, Inc. Richard Ridge, Ridge and Associates

How do the Existing RTF Guidelines address Custom Protocol measures Scope and Purpose – Definition of Method  Custom protocols are appropriate for measures that require site- specific data collection and analysis in order to develop a reliable estimate of savings. Highly skilled and experienced practitioners are required … Custom protocols require site-specific documentation of the data collected and how that data are used in estimating savings. Measure Specification - Baseline  Current practice  Pre-condition Custom Protocol – Guidance and Requirements  Required Knowledge and Skills of Practitioner  Site-Specific Savings Estimation Plan  Site-Specific Savings Report February 8,

Assumptions Applicable to a broad range of non-residential measures Independent of program design  Program administrators can add to the RTF requirements as needed by their program Site-specific  Program impact evaluation appendix would handle projects that involve multiple sites Does not address economic analysis or reporting  Incremental cost  Measure life  Energy costs (customer or utility)  Non-energy benefits 3 February 8, 2012

How High A Bar Should We Set? Cost limits Exempt sites below some size threshold? Set maximum percentage of savings value? IPMVP adherence Post-period trend logs for important parameters that are time variant Measure commissioning (installation and operation) Baseline trend logs for important parameters Prepared by or supervised by persons with relevant design / operational experience Transparent savings estimation Public access to primary data, modeling and reports Quantitative analysis of estimation uncertainties 4 February 8, 2012

How to Achieve Comparability with RTF UES Measures Primary issue is baseline definition Guidelines define to types of baseline  Current Practice new equipment or practices…no remaining useful life…characterized by current market practice or the minimum requirements of applicable codes or standards, whichever is more efficient  Pre-Conditions measure-affected equipment or practice still has remaining useful life…typical existing conditions found among eligible end users How should custom measures treat Current Practice baseline  Code if applicable  Interview the customer about their standard practice  Collect broader market data 5 February 8, 2012

Summary of Recent BPA Protocol / Guidelines Project Background Research  Review of BPA current practices  Analysis of national best practices Three Guidelines  Protocol selection  Regression  Sampling Six Protocols 6 February 8, 2012

International Performance Measurement and Verification Protocol (IPMVP) IPMVP Options  A. Retrofit Isolation: Key Parameter Measurement  B. Retrofit Isolation: All Parameter Measurement  C. Whole Facility (or sub-facility)  D. Calibrated Simulation Not mentioned in current RTF Guidelines BPA has both adherent and non-adherent protocols and explains in detail relationship to IPMVP requirements for A, B and C. No adherent protocol for D. 7 February 8, 2012

BPA Protocols One that is Not IPMVP-Adherent  Energy Calculation with Verification - ECwV (<200,000 kWh or special cases) Engineering Calculation - existing buildings Simulation - existing and new (including additions and major remodels) Five that are IPMVP-Adherent  Equipment or End-Use Metering Protocol (Opt. A and B)  End-Use Metering without Baseline (Opt. A)  Energy Use Indexing (Opt. B and C)  Energy Modeling (Opt. B and C)  Existing Building Commissioning (Opt. B and C) 8 February 8, 2012

BPA vs. RTF Documentation Requirements BPA RTF Guidelines Savings Estimation Plan  Not required Savings Estimation Report  Measure Description  Measure Commissioning  Data Collection  Sampling Procedure  Savings Estimation 9 February 8, 2012 M&V Plan and Report  Baseline Conditions  ECM Intent  Measurement Boundary  Selected BPA Protocol  Baseline Energy Use Measurements  Post-Installation Measurements  Description of Analysis Procedures  Responsibilities of Involved Parties  Savings Report Contents and Frequency

RTF Guidelines – Proposed Appendices App A: Guidelines Checklist App B: UES Measure Summary Sheet App C: Standard Protocol Example and Template (New) App D: Program Impact Evaluation Protocols (New) App E: Estimating Savings for Custom Measures (New) App F: Statistical Energy Modeling (New) App G: Physical Energy Modeling (New) App H: Sampling (New) App I: Glossary (New) App J: Curriculum Guide 10 February 8, 2012

Morphing BPA Guidelines/Protocols into RTF Guidelines Appendices App F: Statistical Energy Modeling  Site-Specific BPA Regression guideline Portions of other BPA protocols  Groups of Sites Cross-sectional Time-series cross-sectional App G: Physical Energy Modeling  Bin (based on BPA ECwV Protocol)  Simulation (based on BPA ECwV Protocol) App H: Sampling (based on BPA Sampling Guide) App I: Glossary (based on BPA Glossary) App J: Curriculum Guide (based on BPA examples throughout guidelines and protocols) 11 February 8, 2012

Outline for Appendix E – Estimating Savings for Custom Measures Purpose Eligible Measures Measures Description Measure Commissioning Savings Estimation Plan Sampling Techniques Data Collection Methods Savings Estimation Methods Savings Estimation Report Quality Control 12 February 8, 2012

Appendix J – Curriculum Guide Built on BPA examples throughout guidelines and protocols Partners  BOC  DOE  ASHRAE  AESP Format  On-line, self paced  Class-room 13 February 8, 2012