Airborne Internet Forum June 19, 2003 Work Plan Draft Host: Virginia Polytechnic Tech Planning Facilitators: Yost, McHugh & Meer Organizational Discussion.

Slides:



Advertisements
Similar presentations
A Presentation to the Cabinet A Presentation to Stakeholders
Advertisements

Human Factors in Flight Operations A CAA Perspective
Unmanned Aircraft Systems EUROCONTROL ATM Integration
1 Multi-Function Multi-mode Digital Avionics (MMDA) NASA Glenn Research Center – End of FY05 Status Presented to ICAO ACP WGC-11 GRC/James Budinger September.
Joint FAA/Eurocontrol Future Communications Study (FCS)
ICAO PBN Symposium Regulatory and Certification Forum Safety case – procedure ready for publication? Jeff Cochrane, Manager CNS Service Design.
1 centre dÉtudes de la navigation aérienne COMMON METRICS FRAMEWORK FOR ATM PERFORMANCE ASSESSMENT AND MONITORING Almira Williams, CSSI Inc.
1 Global Satellite CNS Program. 2 Background/status –Supplemental FY 2002 appropriation provided funding to explore secure global satellite CNS for air.
1 Improve gate-to-gate traffic management to increase capacity and flexibility AATT Project (96-04) Explore advanced concepts and model /simulate the NAS.
ANASTASIA Presentation to the NexSat Steering Group 6th meeting Jean-Yves CATROS EUROCONTROL Brussels 2005 May, 31.
The EMERALD RTD Plan and the ASAS Validation Framework R P (Bill) Booth 10 October 2002.
Airborne Internet Forum Organizational Discussion Facilitator: Paul Masson, Starnet LLC.
ACI/GM/3011/1.0 ACI's Portable ATN Software Products & Services Technology for next-generation aviation data communication… Presented by Forrest Colliver.
Technology readiness levels in a nutshell
Microsoft Operations Framework (MOF) 4.0
SESAR TEN-T day. Content ●SESAR investments and timing ●Network effect ●Validation and certification activities ●Conclusion.
Tony Houston Assistant Director, Safety & Flight Operations IATA – Asia Pacific Inaugural International Aviation Safety Management InfoShare Singapore,
Organizational Design, Diagnosis, and Development
NCES Forum Tech Committee July 2010 Presented by: Kathy Gosa Kansas State Department of Education.
Introduction to Digital NOTAM
Security Controls – What Works
1 CANSO Safety Standard (CSS) Programme. 2 Evolution of CANSO Safety Maturity CANSO Safety Standard Programme.
Weather Technology in the Cockpit (WTIC) Planning and Status Update July 22, 2014 Eldridge Frazier 1 Friends and Partners in Aviation Weather FPAW)
Project Management and overview 1 Advanced Project Management- Introduction Ghazala Amin.
School Counselor Evaluation Task Force February 23, 2011.
Software Considerations in Airborne Systems
Developing Enterprise Architecture
WORKSHOP LANGUAGE PROFICIENCY REQUIREMENTS IMPLEMENTATION March 2010 Rome - Italy REGULATORY ISSUES ON TESTING Eleonora Italia Enac Personnel Licensing.
Next Generation Air/Ground Communications (NEXCOM) Presented to ATN 2002 London, England 25 September 2002 James H. Williams Communications Integrated.
Architecture Evaluation Evaluation Factors Evaluation by the designer Every time the designer makes a key design decision or completes a design milestone,
Presented to: SBAS Technical Interoperability Working Group Date: 21 June 2005 Federal Aviation Administration Certification of the Wide Area Augmentation.
1 Commissioned by PAMSA and German Technical Co-Operation National Certificate in Paper & Pulp Manufacturing NQF Level 2 Explain the individual’s role.
ITS Program Update Moving Towards Implementation of Wireless Connectivity in Surface Transportation Talking Freight Webinar January 19, 2011.
ASAS TN2 WP3: Assessing ASAS Applications Maturity Eric Hoffman EUROCONTROL.
1 EUROCAE EUROCAE Dedicated to Aviation Standardisation ASAS Standards: “From concept to equipment” David Bowen (Technical Secretary) April 24 th 2007.
CHECKPOINTS OF THE PROCESS Three sequences of project checkpoints are used to synchronize stakeholder expectations throughout the lifecycle: 1)Major milestones,
Airborne Internet Host: Boeing ATM Tech Planning Facilitators: Yost, McHugh & Meer Organizational Discussion Facilitator: Masson March 3, 2004.
Search Engine Optimization © HiTech Institute. All rights reserved. Slide 1 What is Solution Assessment & Validation?
Creating a European entity Management Architecture for eGovernment CUB - corvinus.hu Id Réka Vas
System Wide Information Management (SWIM). FAA Transition to Service Oriented Architecture (SOA) - System Wide Information Management (SWIM) Initiative.
Request for Proposal (RFP)
Draft Modernization Roadmap for the Geospatial Platform Karen Siderelis NGAC Meeting March 25,2010.
IntelliDrive SM Vehicle to Infrastructure Connectivity for Safety Applications Monique Evans Director, FHWA Office of Safety RD&T U.S. Department of Transportation.
NASA ARAC Meeting Update on Next Generation Air Transportation System May 3, 2005 Robert Pearce Deputy Director, Joint Planning & Development Office.
Welcome to the Airborne Internet Collaboration/Working Group October 16, 2003 The Digital Avionics Systems Conference.
Joint Standards Initiative VOICE Members 16 th October 2012.
Chapter 4 : Identifying and Selecting Systems Development Projects
 CMMI  REQUIREMENT DEVELOPMENT  SPECIFIC AND GENERIC GOALS  SG1: Develop CUSTOMER Requirement  SG2: Develop Product Requirement  SG3: Analyze.
Search Engine Optimization © HiTech Institute. All rights reserved. Slide 1 Click to edit Master title style What is Business Analysis Body of Knowledge?
SATS Airborne Internet Forum DASC October 16, 2003 Session Moderators: Ralph Yost, Pete McHugh & James Meer.
Information day on EUROCONTROL Guidance Material on the application of Common Requirements for Service Provision  Quality Management  Jos Kuijper, Manager.
Airborne Internet July 24, 2003 Host: Mulkerin Associates Tech Planning Facilitators: Yost, McHugh & Meer Organizational Discussion Facilitator: Masson.
1 USDOT Next Generation Initiative Laurie Flaherty EMS Division, NHTSA.
Presented to: By: Date: Federal Aviation Administration Florida NextGen Test Bed Demonstration and Prototyping Information Exchange Briefing Alex Nguyen,
International Safety Rating System
Presentation of Standard Interoperability PLM (SIP)
Introduction to Digital NOTAM
NEXCOM Next Generation Air/Ground Communications
International Cooperation
NEXCOM Next Generation Air/Ground Communications Appendix G
System Wide Information Management (SWIM)
Draft Strategy To Optimize Resource Management of Storm Water
Technical Management Processes
Mbaye Yade, Maurice Taondyandé and Manson Nwafor (ReSAKSS-WA)
ICAO PBN Symposium Regulatory and Certification Forum
CANSO Safety Standard (CSS) Programme
Introduction to Digital NOTAM
EA Framework TOGAF is a framework - a detailed method and a set of supporting tools - for developing an enterprise architecture.
Group Work 1: Team 1: Influencing policy-makers/decision-makers to integrate gender into agricultural policies and practices Who are influential people?
Presentation transcript:

Airborne Internet Forum June 19, 2003 Work Plan Draft Host: Virginia Polytechnic Tech Planning Facilitators: Yost, McHugh & Meer Organizational Discussion Facilitator: Masson

Workplan: Draft (1) Define the term “Airborne Internet” Mission/Operational concept AI Guiding principles Needs analysis which identify the stake holders –Position in NAS Integrated CNS Requirements Architectural candidates, trade-offs and evaluation. AI functional description AI system design AI test platform development

Workplan: Draft (2) Test and evaluation/Flight test (Develop test plan) Validation and reporting AI design and use of VDL, SAT, Flight test and demonstration Certification Industry standards (RTCA, AEEC, ICAO, etc) Capture the current state of NAS from communications perspective Demonstrate hardware/software system to stake holder

Workplan: Draft (3) NAS transition plan: Current airborne communication to AI Applicable technology assessment Applicable communications standards assessments Benefit Study/List Safety analysis Policy analysis and influence Implementation Analysis: Constraints, Stakeholder, etc.

Workplan: Draft (4) Create a strawmen set of guiding principle Example- secure, peer to peer, broadcast Public relations communications plan Operational plan- work to be done