API 6A 21 st Edition WG API Subcommittee SC-6 Discussions Valves and Wellhead Equipment.

Slides:



Advertisements
Similar presentations
SC6 Work Group on VR Plugs SC6 Summer Meeting June 27, 2013 Bob Barnett / Jean Brunjes.
Advertisements

SC6 Ballot 1974: Adopt-back of ISO 10423:2009 as API 6A 20 th ed. Task Group Report on Resolution of Ballot Comments Eric Wehner 30 June 2010.
Subsea Standardization. Brief History SPE ATW on Subsea Standardization held Dec 2008 SPE ATW on Subsea Standardization held Dec 2008 –Form workgroup.
2013 Exploration & Production Standards Conference Subcommittee 10 June 25 & 26, 2013 Capitol Hyatt Regency Washington D.C.
Bill Bruce 30 June 2010 Appendix B Revisions for Twenty-First Edition of API 1104 Proposed Letter Ballots.
API 6AV1 and API 6A Comparison
SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
1 API Subcommittee 6 Plenary Meeting Resource Group on Materials Tim Haeberle Chairman – API SC6 Resource Group for Materials 6 February 2014.
© 2011 Chevron API 16A 3 rd Edition Summer Conference Committee Meeting 24-June-2013 API 16A Chairman: John Busby Co-Chair: Jim McCabe.
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 January 2014.
Tim Haeberle API SC Winter Meeting
GE Oil & Gas Drilling & Production API SUBCOMMITTEE 6 WORK GROUP ON API SPEC 6A May 2009 Westminster, Colorado.
Progress Since January Meeting
API Standard 6X: Design Calculations for Pressure-Containing Equipment
Standards Governance Update Budget Overview SC Chair Rotation 2010 E&P Summer Standards Conference July 2, 2010 Washington, DC.
API 6A 21 st Edition WG API Subcommittee SC-6 Discussions Valves and Wellhead Equipment.
1 David Miller, PE, F.ASCE Director, Standards API ECS Reorganization Update.
Kent Grebing, API SC 16 Chair
SC 16 DRILLING WELL CONTROL SYSTEMS API SC18 Report out Session API 2015 Winter Standards Meeting Kent Grebing, API SC 16 Chair.
1 API 16A 3 rd Edition Winter Conference Jan API 16A Chairman: John Busby Co-Chair: Jim McCabe.
API 6A 21 st Edition WG Update API Subcommittee SC-6 Plenary Valves and Wellhead Equipment June 19 th 2014.
Update on the API Work Group Activities on Pipe Markings.
Recommendation of Informal work group for changes to Weld Overlay requirements in API Spec 6A Chairman - Mike Briggs (Cameron) Members – Tim Haeberle(GE),
API SC18 Work Group 2 API Exploration & Production Standards Conference on Oilfield Equipment and Materials Westminster, Colorado June 23, 2009 Ed Durante.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.24 AR 2014Page No.: 1 Activity Report 2014 WG A3.24 Tools for Simulating Internal.
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 January 2015.
API SC6 Valves and Wellhead Equipment TG3 – Wellhead Design in Standards and TRs Kenneth Young 14 June 2012 SC6 Summer Meeting - Westminster, CO1.
2015 Exploration & Production Standards Conference Subcommittee 10 June 23-25, 2015 Hyatt Regency San Francisco, CA.
SC8 Liaison Report 2014 Exploration & Production Standards Conference API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
SC17 Materials Initiatives 2015 Summer Meeting Update.
Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.
Sub Committee 6 Ballot resolution Summary June 2012 Mike Briggs.
San Francisco, CA. SC8 Liaison Report
19th January 2012 Don Wells (Hess)
API 16F API Document – API 16F Chair – George Tisdale Co-chair – Dave Dartford Secretary - None Contact Information – cell National Oilwell.
API Spec 6A: ASME Section V And Section IX Reference Editions Tim Haeberle API SC Summer Meeting.
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 June 2015.
(Spring 2015) Instructor: Craig Duckett Lecture 14: Thursday, May 12 th, 2016 Visual Studio Community Edition 1.
Page 1 R2AD *** DAY 1 (May 23) *** 10:00 Agenda bashing, role call, note taker & time keeper. (KF; 30 min) 10:40 ACS Overview (10 minutes) 11:00 Security.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
API SUBCOMMITTEE 17 SUMMER MEETING 13 January /13/2016 Subsea Industry Standardization Landscape Terry Cook – API SC17 Vice-Chair.
API 19 CI Chemical Injection Devices for Downhole Applications
API 19 CI Chemical Injection Devices for Downhole Applications
TG Chair: Darren Bane (BHI)
2017 Exploration & Production Winter Standards Meeting Subcommittee 10
API SC19 HPHT Template (Proposed as SC19TR1)
TG Chair: Mark Brinsden Shell
Updates from SC18 Summer Meeting
Carry Over From API SC6 Winter Meeting API Standard 6A718 Inclusion of Additional Alloy 718 Strength Classes Tim Haeberle 30 June 2011.
SC 6 Task Group 1 Pipeline and Valve Standards Status Report
API Subcommittee 17 - Specification 17D January 2016 Status
Committee on Standardization of Oilfield Equipment and Materials
API SC6 Valves and Wellhead Equipment
2016 Exploration & Production Standards Conference Subcommittee 10
API SC 17 Winter Meeting – Specification 17D Status
API Standard 6X: API/ASME Design Calculations
SC6 Work Group on VR Plugs
RAISING PERFORMANCE. TOGETHERTM
API SC-16 task group for Specification 16D
2016 Exploration & Production Winter Standards Meeting Subcommittee 10
2016 Exploration & Production Summer Standards Conference
API Summer Standardization Conference
API 16D June 2017 Specification for Control Systems for Drilling Well Control Equipment and Controls Systems for Diverter Equipment Chair – Brian Wright.
API Subcommittee SC-6 Discussions Valves and Wellhead Equipment
SC6 Valves and Wellhead Equipment
SUBCOMMITTEE 6 ORGANIZATION STRUCTURE
TG3 17TR8 Liaison Report ASME Task Group on Subsea Applications
CSOEM Materials Advisory Resource Group
API SC6 Valves and Wellhead Equipment
  API SC 17 Subcommittee on Subsea Production Systems   API RP 17U   Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines.
Presentation transcript:

API 6A 21 st Edition WG API Subcommittee SC-6 Discussions Valves and Wellhead Equipment

Introduction TG Committee consists of 81 members Meetings started in June 2013 with typically members per meeting Held approximately nine WG meetings to date TG approach – Build worklist (cut-off for items was August 2013) – Identify Teams and Team Captains – Divide worklist between teams – Meet as teams to resolve work items

Work Teams/Captains – Design / Jean Brunjes – Materials, Welding and Cladding / Sterling Lewis – Organization / Eric Wehner – Qualification / Tom Lambert – Quality / Mike Briggs – Documentation Specialist / Jill Bell – Co-Chairs / Eric Wehner & David Zollo

Worklist Currently there are 155 items in the worklist Several Items that needed roundtable discussion – Overall document organization ideas – EW EW will study new structure and propose ideas to TG – Metric conversion issues – EW Studying changes ranging strict conversion from metric to fixing critical bore and interface clean-up – Reference C/L – JB Will remove triple & quad multiple completions from rewrite – Alloy 625 Overlay Minimum Thickness Limit – DZ Will determine a way to provide for minimum overlay thickness – Annex ordering issue – EW Trying to keep references the same for frequently referenced Annex’s Will remove Annex H (Tools) and create TR at a later date