Transport and handling at CERN for FAIR

Slides:



Advertisements
Similar presentations
is a mobile protective steel barrier in a modular design.
Advertisements

CFS TIME SCHEDULE EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe.
Containers, container handling History of the container Idea of rationalizing goods transport by avoiding the constant loading and unloading from one means.
A. Hervé - 13 august 2007 ILC-IRENG Meeting of Working Group A: 13 Aug 07 Proposal for an Experimental Area With only One Large Shaft A. Hervé/CERN.
Space reservation and crane limitations linked to refrigeration cold box in TX46 13th HL-LHC Parameter and Layout Committee Meeting C. Bertone, S. Claudet,
D-R Compressor Cell RIT Senior Design Team P13458 Week 4 Status Report.
Ontario International Transport and logistics Chapter 7: Rail and Intermodal.
CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance.
TCC2-TDC2 working group Handling means for the TAX repairs JL GRENARD EN-HE 21th September 2011.
Baseplates and Hg System Handling V.B. Graves P.T. Spampinato MERIT Hg System Safety Review CERN June 19-20, 2006.
Collimation Remote Handling Highlights from work for collimation remote handling and remote survey. Plans Keith Kershaw EN-HE 14 June 2011.
PHYSICAL DISTRIBUTION. Logistics & Supply Chain Logistics Component parts & Raw material In-process inventory Finished goods Supply Chain.
Remote Handling design progress for the Collimation Upgrade project Keith Kershaw EN-HE 6 June 2011.
© Siemens AG All rights reserved. The importance of infrastructure June 2011.
TGC Big wheel Sector assembly plan Tatsuo Kawamoto ATLAS workshop 2005.
4.2.8 Student Book © 2004 Propane Education & Research CouncilPage Installing Aboveground ASME Tanks Installing aboveground tanks is an important.
2.5.5 Student Book © 2004 Propane Education & Research CouncilPage Coordinating Loading and Unloading of ASME Tanks Using Contractor- Operated.
Status of handling studies for PSB-LIU Caterina Bertone EN-HE LIU-PSB 17/09/2015 Courtesy: A. Newborough EDMS
Status of AMS02 Integration Area in Building 867 January 10, 2007.
6th ST workshop, Thoiry, 1-3 April ST-HM Design Section Strategy and working methods 3rd April 2003 C. Bertone ST-HM.
Transportation Planning EIN 5346 Enterprise Systems Optimization Fall, 2015.
April 23rd-24th 2013Handling Engineering Group. Introduction to CERN April 23rd-24th 2013Handling Engineering Group2  CERN: European Organization for.
Baby MIND coil modules assembly the aluminium folded strip solution 1 Alexey, Philippe, Gabriella, Helder, Herman Baby Mind Magnet CERN June.
GLAST LAT ProjectMarch 08, 2004 Page 1 ACD Installation, Post LAT CDR Response to GLAST LAT CDR RFA Number 13: MGSE Detailed Dimension Study [for ACD Installation]
Transport of the CLIC Modules and Elements CLIC Workshop October 2007 Two Beam Hardware and Integration Working Group Keith Kershaw (CERN)
19 January 2006VELO installationEddy Jans 0 VELO-installation meeting CERN, January 17, 2006 preparation IP8-area SX8 moving SX8 -> IP8.
FPC Assignment 1. Go to Your Project and Fire-Up MSOPIT.
Transport and Handling (T&H) considerations for HL-LHC
K.Gadow CALICE technical review 1 Move to FNL ECAL/HCAL-Movable Table Setup test beam integration to Fermilab MT6-B3/B4.
Gas System production for LHC detectors Stefan Haider EP / TA1 - Gas.
GLAST LAT Project Page 1 ACD Installation, Post LAT CDR Response to GLAST LAT CDR RFA Number 13: MGSE Detailed Dimension Study [for ACD Installation] –A)
LAV construction: Status and overview Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting Brussels, 8 September.
ILC TRANSPORT AND INSTALLATION Questions from last CES: Beam height explanation, Transport implications of sloping access tunnels proposed for access to.
Transport & Handling of Detectors TAN Workshop S. Prodon –
EN-HE Group meeting 19 th June 2015 I. Rühl / EN-HE.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
Baseplates and Hg System Handling V.B. Graves P.T. Spampinato MERIT Hg System Safety Review CERN June 19-20, 2006.
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
LHCb Radiation Shielding Wall – Lifting Tool Overview.
Transportation Planning EIN 5346 Enterprise Systems Optimization Fall, 2015.
1 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Systems Installation F. Willeke, ASD Director 6 th ASAC October 22-23, 2009.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
CLIC MODULE TRANSPORT AND INSTALLATION Keith Kershaw CES, 8 October 2008.
ICARUS Collaboration Meeting Dec A. Scaramelli.
Sale of material salvaged from the LEP experiments 4 large experiments ALEPH DELPHI L3 OPAL The 4 detectors are situated in caverns (100 m under ground.
 Reduce costs.  Reduce damage.  Increase space and equipment utilization.  Increase throughput.  Increase productivity.  Improve working conditions.
Transport and Handling Manpower Planning S. Prodon – LEAF
Logo area Handling Engineering Requirements EN-HE Group Bruno Feral – EN/HE EDMS HL-LHC CE Consultant Kick-Off Meeting – 31/05/2016.
PRELIMINARY VERSION Mechanical integration in the ESS Accelerator tunnel HENRY PRZYBILSKI.
Handling Discussions LAGUNA-LBNO/Layout Study Group - Friday 19/7/2013 Keith Kershaw EN-HE.
Kitakami Side AHCAL Assembly or anywhere in any detector.
An idea for the future of logistics...
SMB Service Status 113th ACCU Meeting
Schedule CM SPS G.Vandoni.
SBN Far Detector Installation & Integration
SX1 manipulation VERSION 1 Version
VELO-installation meeting CERN, January 17, 2006
FCC lifts Layout, characteristics etc.
CRANES By griffin.
CE Status: Activities executed until 03/08 and ongoing
CATIA Design Requirements applied to Handling & Transport at CERN 26th CATIA Forum Jean-Louis GRENARD on Behalf of EN-HE design office 18-May-2017.
Accounting Movements Cards (For printing)
EHN1 Neutrino Installation Plans
Truck Transport Services By KSA Truck Transportation Services Trucksi provides trucks and load transport services by road, the weight.
T-1280 VEHICLE LOADING CRANE
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
C-F-DIPIETRO ASIA CO., LTD
Rail & Truck Handling, Loading, and Securement Standards for Shipping the NEW Jeep Compass 2017 February 21, 2017, Version 5 This form outlines the mandatory.
Bunker Project Operation aspects
Presentation transcript:

Transport and handling at CERN for FAIR Caterina Bertone – EN/HE 12 May 2015

Two major implications Handling inside building 180 Logistics from/to Prevessin reception 12 May 2015

Cranes in building 180 60t plus 40t. 60t cranes FAIR side Can work coupled, hook distance 10,3m Free height under crane profiles 9,61m 12 May 2015

Magnets (approved) 57 magnets with a mass fro 35t to 55t, divided in 5 types 12 May 2015

Coupling spreader for cranes In case than the weight to be lifted overpasses 60t (no margin) including: complete magnet + supports + lifting spreader, the cranes needs to be coupled Margin is too few with 55t magnets A 100t coupling spreader is being developed as compact as possible (delivery end 2015) 12 May 2015

Integration of handling volumes Magnets test bench – predefined Path from truck to preparation areas to bench integrated Outcome is the space to be reserved for handling 12 May 2015

3D of handling volumes 12 May 2015

Space limitation in height 12 May 2015

Constraint on tooling Overall height of the lifting spreader and tooling < 1,3m from top of the magnet to lifting point of the crane (including converging slings and accessories) Condition can be relaxed only if: weight of the final magnet + supporting structure + spreader + slings&rigging equipment (overall gross load to be lifted) < 60t In this case, overall height can be 2,51m 12 May 2015

For future magnets The weight of the spreader is ~11t, implication being that the maximum gross mass of future magnets (including supports, spreader and any kind of ancillary system to be handled with) that can be handled at CERN is 89t Same volumes shall be respected: if we can have an overview of the proposed magnets, we can feedback on maximum dimensions of the lifting tooling 12 May 2015

Logistics from Prevessin The possibility to unload the external trucks on Prevessin site (FR) and transfer the magnet on CERN means has been analysed Internal transport services at CERN are not equipped for road transfers of more than 50t loads Even for <= 50t, the logistics implications will be very severe (mobile crane operation, special truck….) It is possible for the external transporter to register the material on Prevessin site (so that is officially delivered in Europe) and transport to Meyrin site with an official ‘transfer slip’ that proves that the transfer is made on the account of CERN 12 May 2015

Conclusion Transport services is ready now for the installation of the support services in building 180 and will be ready in January 2016 to receive the GSI magnets Road transport from b. 180 to Prevessin site and back should be done by the external transporter via an official transfer slip (to avoid custom problems CH-FR) More precise information about the masses to be lifted (gross) and lifting tooling to be used is needed now to final check the handling volumes and tooling 12 May 2015