El Paso Natural Gas Company Docket Nos. RP00-336-002, RP01-484-000, RP01-486-000, and RP00-139-000 Robert Petrocelli, Ingrid Olson, Elizabeth Zerby.

Slides:



Advertisements
Similar presentations
Transwestern Pipeline
Advertisements

Definition of Firm Energy and Interruptible Transmission Two Issues Causing Problems for Business in the Western Interconnection.
EMIG Electricity Market Investment Group Presentation to the Ontario Energy Board February 17, 2004.
Available Capacity to Serve AZ
Natural Gas Market Conditions and Unisource Natural Gas Bills Bob Gray, Arizona Corporation Commission Staff February 24, 2004.
CIG Xpress System Rewrite Customer Conference Call October 20, 2010.
Work in Progress: The Bridge to the Doctorate Experience A Reflection on Best Practices and Project Outcomes T. Aktosun (UT Arlington) A.Arciero, B. Flores,
ACC Workshop Regarding Notice of Inquiry on Natural Gas Infrastructure September 10, 2003.
1 July 15, 2007Alcoa Energy Regulatory Affairs NARUC / FERC Demand Response Collaborative Perspectives of a Large End Use Participant of NYISO Programs.
RB:UMT Arizona Corporation Commission Workshop on Natural Gas Infrastructure NOI February 13, 2004 Phoenix, Arizona.
2 Permian Basin Supply San Juan Basin Supply Washington Ranch Storage Waha Compressor Stations Gas Supplies Transport Flow Directions Pipelines Production.
1 COST OF SERVICE OBJECTIVES & METHODOLOGY Utah Cost of Service Taskforce May 23, 2005 Dave Taylor.
Kansas Economic Development Alliance October 2012.
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
KERN RIVER GAS TRANSMISSION COMPANY Wyoming Pipeline Authority Casper, Wyoming August 21, 2007 John Dushinske Vice President of Marketing & Regulatory.
Nominations and Scheduling Questar Gas Company Annual Account Management Customer Meeting Will Schwarzenbach Director, Gas Supply.
R Southwest Gas Corporation February 16, 2001 Southwest Gas Corporation Update on Factors Affecting Gas Prices n Storage u Storage levels continue below.
WESTCAS - Shortage Impacts on AZ CAP General Manager David Modeer October 29, 2014.
California Public Utilities Commission Regulation and Natural Gas Infrastructure Richard Myers CPUC Energy Division May 14, 2009.
The Market Outlook for Natural Gas: The Wyoming Natural Gas Pipeline Authority’s Perspective Wyoming Geological Association Conference Prepared: July 26,
Wyoming Pipeline Authority August 24, 2004 Mark C. MoenchJohn R. Smith Vice President and General Counsel Director, Regulatory and Governmental Affairs.
Working with the fillable pdf - Form No. 549D. Agenda Opening Comment Fill in a simple Form549D  Will address Generic FAQs / Errata as we proceed in.
1 Transmission Development at Ameren and in the Midwest ISO Mid-America Regulatory Conference Maureen A. Borkowski June 8, 2010.
© 2013 McNees Wallace & Nurick LLC October 17, 2013 Robert A. Weishaar, Jr. ON SITE ENERGY – INTERPLAY WITH PJM DEMAND RESPONSE PROGRAMS Harrisburg, PA.
Kinder Morgan Silver Canyon Pipeline Kinder Morgan Silver Canyon Pipeline Business Overview ACC Workshop NOI February 13, 2004.
Intermountain West Production -- Getting Gas to Market Jim Cleary El Paso Western Pipelines IPAA Mid-Year Meeting June 14, 2004.
FERC Assessment of Demand Response & Advanced Metering 2006 APPA Business & Financial Conference September 18, 2006 – Session 11 (PMA) Presented by: Larry.
Draft Review Proposal 175 Encouraging Participation in the elective DM Regime Phil Broom 25 October 2007.
Stan Chapman SVP, Marketing & Customer Services Oct 8, 2013.
® July 30 th, 2014 Utah PSC Technical Conference.
September 5,  Mission - To provide Excellent Service to Our Distribution Members by creating opportunities, cultivating cooperation, and navigating.
Hawkin s Delafield & Wood LLP PARTNERSHIP GUARANTEES TO ENHANCE WATER CONSERVATION Presented by Rick Sapir (973) Presented.
OSC Meeting April 27, Transmission Cost Allocation Overview.
Demand Response Workshop September 15, Definitions are important Demand response –“Changes in electricity usage by end-use customers from their.
ERCOT MARKET EDUCATION
® ®® ® IRP Workshop Feb 9, ®  February 9, Workshop - Review of 2014 IRP Order - December 30 and 31 Weather Event - Demand Forecast and 65%
ERCOT MARKET EDUCATION Retail 101. Introductions, Roles and Responsibilities.
WINTER PREPAREDNESS PLAN ALLIANT GAS. Alliant Gas is the propane gas company that operates as a regulated utility in the towns of Payson and.
Entrega Project Update Wyoming Natural Gas Pipeline Authority – August 30, 2005 Entrega Gas Pipeline Inc.
Arizona Corporation Commission Power Plant & Transmission Siting Summary ACC Staff Presentation October 30,
The Market Outlook for Natural Gas: The Wyoming Natural Gas Pipeline Authority’s Perspective.
Demand Response: What It Is and Why It’s Important 2007 APPA National Conference San Antonio, Texas June 26, :00 a.m. to Noon Glenn M. Wilson Director.
June CHRISTENSENASSOCIATES EFFICIENT PRICING OF STANDBY DISTRIBUTION SERVICES Presented to Edison Electric Institute Distributed Generation Task.
Natural Gas and Energy Reform Legislation Steve Crout Managing Director, Government Affairs American Gas Association.
Southern California Edison The San Onofre Nuclear Generating Station April 14, 2011.
© 2015 McNees Wallace & Nurick LLC OPSI Annual Meeting October 13, 2015 Session 6 – Reliability Pricing Model: Are Further Changes Necessary?
WINTER PREPAREDNESS ARIZONA WINTER PREPAREDNESS ARIZONA.
CEC Workshop January 24, 2003 January 24, 2003 Chris Price Market Development Wild Goose Storage Inc.
Entrega Gas Pipeline Project Wyoming Natural Gas Pipeline Authority - August 24, 2004.
City of Fernley, Nevada – 164 th Ave. NE, Suite 300, Redmond, WA April 18, 2007 Rate Study Findings Water and Sewer Utility Rates.
Alternative Approach to Enduring Exit Flat Capacity & Revenue Recovery Gas TCMF 14 th December 2006.
© 2011 The Williams Companies, Inc. All rights reserved. Consolidated Nominations Jeramie Kilpack Mary White.
BGE Smart Grid Initiative Stakeholder Meeting September 17, 2009 Wayne Harbaugh, Vice President, Pricing and Regulatory Services.
September 25, 2001 Maryland Public Service Commission Retail Gas Market Conference Timothy S. Sherwood Department Head, Energy Acquisition.
Enron Transportation Services. AC_01_ETS -1 Enron Transportation Services Innovative…Creative…Safe…Reliable Strong Returns with Consistent Earnings and.
Residential demand charges
Transwestern Pipeline Company
Natural Gas –generation intersection
Operations Directors Conference October 9, 2001
Northern Border Partners (11.8%)
WATER BOARD Industrial Association of Contra Costa County Enforcement/Compliance Forum February 22, 2017 Brian Thompson, CHG, CEG Senior Engineering Geologist.
Privileged and Confidential
California Energy Solutions Group
Privileged and Confidential
ALBUQUERQUE TEAM MEETING November 7, 2001
Mod 621A Supporting analysis
Vice President, Markets Development
CPES Meeting Cromwell, CT
2019 NATURAL GAS OUTLOOK WORKSHOP Presentation to the OPUC
Independent Energy Producers 2019 Annual Meeting
Presentation transcript:

El Paso Natural Gas Company Docket Nos. RP , RP , RP , and RP Robert Petrocelli, Ingrid Olson, Elizabeth Zerby

FERC High Pressure System San Juan Basin Maricopa Line Havasu Line Permian Basin Low Pressure System Eunice Station Keystone Station Waha Station Arizona New Mexico Texas Plains Station Dumas Station Topock Ehrenberg Anadarko Basin Permian-San Juan Crossover Valve City El Paso Natural Gas System Nevada CA

FERC 3 Capacity Peak Demand (in MMcf/d)

FERC 4 Should FR service be converted to CD service? Staff recommends converting FR service to CD service maintain existing rate structure maintain FT-2 FR contracts –Benefits provides certainty for all shippers unspecified rights degrade firm CD service

FERC 5 What level of contact demand should be assigned to FT-1 full requirements shippers? Settlement Billing Determinants (BD) Coincidental Peak Demand (CP) Non-Coincidental Peak Demand (NCP) Some combination of the above

FERC 6 Benefits of Using the Greater of BD or CP Reflects FR customer current usage (Dec. 12, 2001 system peak day) No shipper is allocated less than the capacity they pay for under the Settlement Maintains CD service at contract levels Matches contract demand to system capacity to preserve reliability Places all customers on equal footing and sends proper price signals for expansion

FERC 7 Should specific receipt point rights be assigned? Consistent with Commission-approved delivery point allocation order in BR/Amoco/Topock complaint case Provides certainty of supply for all firm shippers Eliminates daily pro-rata curtailments Enhances value and tradability of capacity

FERC High Pressure System San Juan Basin Maricopa Line Havasu Line Permian Basin Low Pressure System Eunice Station Keystone Station Waha Station Arizona New Mexico Texas Plains Station Dumas Station Topock Ehrenberg Anadarko Basin Permian-San Juan Crossover Valve City Current Pooling Areas Blanco Bondad Plains Anadarko Keystone Waha

FERC High Pressure System San Juan Basin Maricopa Line Havasu Line Permian Basin Low Pressure System Eunice Station Keystone Station Waha Station Arizona New Mexico Texas Plains Station Dumas Station Topock Ehrenberg Anadarko Basin Permian-San Juan Crossover Valve City MCCAMEY or LINE Proposed Pooling Areas

FERC 10 Conclusion Conversion aids shippers by restoring certainty to firm services and by providing equal access to supplies Ensures proper relationship between rates paid and services rendered Next step: Convene a conference to receive comments on staff’s recommendation