1 2009 West to North CSC Location Scenario 3b WMS August 20, 2008.

Slides:



Advertisements
Similar presentations
Additional CREs to address Stability Limits Beth Garza TAC June 26, 2008.
Advertisements

October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
March 6, 2008 Technical Advisory Committee Luminant Energy & Oncor Tyler Grande Autotransformer Addition and 138 kV Line Upgrade Project Jay Teixeira Manager,
Regional Planning Group Project
2004 Congestion Costs. 2 Transmission Congestion Occurs when analysis shows a given outage of a transmission element (contingency) will result in the.
Critique of Proposal to Designate SAPS-Shrew as CRE Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) June 4, 2009.
CSC/CRE Technical Review 6 October Outline  Review the process used in calculating Power Transfer Distribution Factors (PTDFs).  Information.
Houston Import Evaluation Cross Texas Transmission & Garland Power & Light ERCOT RPG Meeting August 27th, 2013.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
Outage Coordination Overview D.W. Rickerson ERCOT Outage Supervisor 12/1/2008.
CMWG Update June WMS Meeting CMWG Update 1. CMWG (Vote) Confirmation of new Vice Chair: Greg Thurnher (Representing Luminant/TXU Energy) 2.
Aug 14, 2009 Regional Planning Group Proposed CREZ Project Modifications Warren Lasher Manager, System Assessment.
JACKSBORO TO WEST DENTON 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
March 2003 Operations Summary Bill Blevins Manager Operations Engineering.
ERCOT 2009 CSC Proposal 3h Mark Garrett – Direct Energy Clayton Greer – J Aron.
Congestion Revenue Rights Activity Calendar Update Donald House CMWG September 19, 2014.
10/03/ Report on Existing and Potential Electric System Constraints and Needs Within the ERCOT Region October 3, 2002.
Monthly TCR Calculation DRAFT 3 James J. Teixeira 05/11/02 Also review ERCOT Protocols Section 7 for more details and additional data.
1 WMS Report To TAC September In Brief Four Working Group Reports Four Working Group Reports One Task Force Report One Task Force Report Three.
CRR Auction Scope John Moseley. To outline aspects of the CRR market process to assure that these proposed CRR market protocols (as interpreted by ERCOT.
John Dumas Director of Wholesale Market Operations Jeff Billo Manager of Mid Term Planning Dan Jones Director with Potomac Economics, the ERCOT IMM Board.
Presentation to WMS Regarding PRR 731- Fuel Oil Index Price (FOIP) Larry Gurley July 18, 2007.
June 19, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
VRT Study Update José Conto ERCOT System Planning.
Proposed North – South Congestion Mitigation Plan Luminant Energy July 2008.
Economic Planning Criteria Question 2 1/7/2011 Joint CMWG/PLWG Meeting March 4, 2011.
Report to TAC August In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG (No report) DSWG (No report) MCWG MCWG MWG (No report)
PRR 547 – Trading Hubs CMWG Presentation to WMS October 21, 2004.
Report to TAC September In Brief Working Group Reports Working Group Reports CMWG – CSC’s 2010 CMWG – CSC’s 2010 MWG – SMOGRR007 MWG – SMOGRR007.
WEST LEVEE TO NORWOOD 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
Competitive Constraints/ Protocols 3.19 Presented to CMWG 10/14/2011 Steve Reedy, Manager, CRR.
1 WMS Report To TAC May In Brief One Working Group Reports One Working Group Reports Two Task Force Reports Two Task Force Reports One Staff report.
July 10, 2008 ROS Early Delivery Systems Status – R6.3 2 Hour Test John Dumas and Jeff Gilbertson.
December 2, 2004 Congestion Causes and Effects Presented to WMS January 14, 2005 Beth Garza.
Lance Cunningham, Ph.D., PE November Frisco, TX 2.
AEPSC Live Oak County Transmission Project – ERCOT Independent Review TAC September 24, 2015.
2010 CSC & Zone Selection: 6 Lines W-N & 4 Zones (WN2_SN0-4Z) Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) August 19,
February 13, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
Graham Generation and the Market – The Facts October 8, 2008.
Congestion Revenue Rights Activity Calendar Update Donald House CMWG October 23, 2015.
ERCOT CSC – Vote “Yes” to 3b Jan A. Bagnall Sr. Director Transmission, Reliability & Compliance October 2008.
October 16, 2009 RPG Meeting ERCOT Independent Review of the Corpus Christi Improvements Project Jeff Billo.
Current Operational Challenges Computing the West – North Limits Potential IROLs Local Voltage & Thermal issue (OOME) High Voltage Outages.
Congestion Management Work Group Update WMS I Flores, S Reedy—ERCOT M Wagner--PSEG TX.
Technical Advisory Committee Presentation to the ERCOT Board of Directors September 16, 2008.
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
CMWG Update to WMS Report of CMWG Meeting of M. Wagner Edison Mission Marketing & Trading Thanks to ERCOT Staff for Graphics See ERCOT.
August 2012 Wholesale Market Operations Constraints Competitiveness Tests (CCT) – Annual CCT 2013 Study Result with New Approach Market Support and Analysis.
CMWG Update to WMS M Wagner Edison Mission Marketing & Trading.
Technical Advisory Committee Presentation to the ERCOT Board of Directors October 21, 2008.
WMS 1/9/20131 Priority Power Management, LLC Proposed Changes to Holistic Solution WMS January 9, 2013 James Z. Brazell Law Office of James Z. Brazell.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
Transmission Services Report: North and West RPG Projects Bill Bojorquez TAC July 7, 2005.
October, 2009 Congestion Report Isabel Flores. 2 October, 2009 Background Provide trend of local congestion costs for last 13 months Costs shown in millions.
Transition Plan Network Operations Model Change Requests 5/26/2010.
2009 ERCOT CSCs and Congestion Zones (10/8/08) C. Richard Ross American Electric Power Service Corporation.
Congestion Management Work Group 2008 Overview CMWG Marguerite Wagner, Reliant Energy Inc.
2008 Annual Five Year Plan Update 4 For RPG-CREZ Meeting 12/14/2007 Department of Regional Planning Harry Liu.
Information Needed By All Market Participants To Facilitate Transmission Congestion Studies In ERCOT Presented to the ERCOT ROS by Shannon Caraway, P.E.
Reliability Must Run Workshop RMR Study Process May 24, 2016.
Modeled Load Levels in the Valley
CSC DETERMINATION PROCESS
ONCOR Electric Delivery/ Texas New Mexico Power East Bell County to TNP One 345 kV Line Upgrade Projects Board of Directors July 17, 2007.
Barrilla Junction Area Transmission Improvements Project
Mark Garrett – Direct Energy Clayton Greer – J Aron
TAC Report to the ERCOT Board
Presentation transcript:

West to North CSC Location Scenario 3b WMS August 20, 2008

2 Scenario 3b Since Inception of Market in 2001 through 2008 the W-N CSC has been the double circuit 345kV Line Graham- Parker/Graham-Benbrook. Since Inception of Market in 2001 through 2008 the W-N CSC has been the double circuit 345kV Line Graham- Parker/Graham-Benbrook. Before fall of 2007, the W-N CSC experienced little or no congestion. Before fall of 2007, the W-N CSC experienced little or no congestion. Wind generation additions have altered the situation with frequent congestion expected to persist well into Nodal Market operations. Wind generation additions have altered the situation with frequent congestion expected to persist well into Nodal Market operations.

3 Scenario 3b Arguments for moving the W-N CSC to the west of Graham: Arguments for moving the W-N CSC to the west of Graham: Luminant : “The 2009 summer peak case shows a substation that is being installed between Graham and Long Creek, called the Cook Field station, … There is a new 165 MW wind facility that will connect to this station. There is a new 165 MW wind facility that will connect to this station. The station is scheduled to be completed in October 2008, thus be operational the entire 2009 calendar year. The station is scheduled to be completed in October 2008, thus be operational the entire 2009 calendar year. The possibility that the currently constraining element from Abilene Mulberry Creek to Long Creek will move to the Graham to Cook Field line section once the new station and wind generation are both installed ” The possibility that the currently constraining element from Abilene Mulberry Creek to Long Creek will move to the Graham to Cook Field line section once the new station and wind generation are both installed ”

4 Scenario 3b Arguments for moving the W-N CSC to the west of Graham: Arguments for moving the W-N CSC to the west of Graham: Luminant : “Most money spent (>47 million)” $47 million reflects contingencies on Fisher Road – Oklaunion & Bowman associated with outages for reconductoring of static wire for Graham – Long Creek and Graham – Sweetwater etc. that lasted from 2/4/2008 through 4/13/2008. $47 million reflects contingencies on Fisher Road – Oklaunion & Bowman associated with outages for reconductoring of static wire for Graham – Long Creek and Graham – Sweetwater etc. that lasted from 2/4/2008 through 4/13/2008.

5 Scenario 3b Arguments for moving the W-N CSC to the west of Graham: Arguments for moving the W-N CSC to the west of Graham: Direct Energy : “After reviewing Scenarios #3d, 3e, and 5, DE believes it might be time to look at the West in another light. We would like to consider scenarios with five zones and the following CSCs: 1) Singleton - THW/O'Brien 2) Tradinghouse / Lake Creek - Temple / Pecan Creek 3) Graham - Parker / Benbrook 4) either: Graham - Tonkawa Graham - Murray Paint Creek – Radium”

6 Scenario 3b Arguments for not changing the CSC (Scenario 3b): ERCOT : At the 8/1 CMWG meeting ERCOT endorsed the existing W-N CSC as its recommendation. When asked for supporting reasons, ERCOT representatives stated that under some circumstances, if the CSC is located west of Graham, the generation at Graham may receive the wrong price signals. When asked for supporting reasons, ERCOT representatives stated that under some circumstances, if the CSC is located west of Graham, the generation at Graham may receive the wrong price signals. ERCOT stated also that the limiting element for W-N dynamic stability remains East of Graham ERCOT stated also that the limiting element for W-N dynamic stability remains East of Graham

7 Scenario 3b Arguments for not changing the CSC (Scenario 3b): If the CSC is moved, this will displace load to the North from Jan. 1 until the implementation of the Nodal market, it will then revert to the West zone. If the CSC is moved, this will displace load to the North from Jan. 1 until the implementation of the Nodal market, it will then revert to the West zone. Nodal Protocols §3.4.1(2): The Competitive Load Zones are the four zones in effect during the 2003 ERCOT market … §3.4.2: Load Zones may be added, deleted, or changed, only when approved by the ERCOT Board ….Approved additions, deletions, or changes go into effect 36 months after the end of the month in which the addition, deletion, or change was approved.

8 Scenario 3b Arguments for not changing the CSC (Scenario 3b): Proposal 3b is based upon the same W-N CSC as 2003, thus the movement in load from the West zone to the North Zone will be minimal (estimated 9MW.) Proposal 3b is based upon the same W-N CSC as 2003, thus the movement in load from the West zone to the North Zone will be minimal (estimated 9MW.)  Proposal 3g will temporarily relocate 766 MW of load from West to North (20% of the current West zone load.)  Proposal 3h will temporarily relocate 785 MW of load from the West to North (20% of the current West zone load.)

9 Scenario 3b Arguments for not changing the CSC (Scenario 3b): Generation at Graham has historically been included in the West zone, in part because of competitiveness concerns. Generation at Graham has historically been included in the West zone, in part because of competitiveness concerns. Competition appears to have grown because of the addition of West zone wind generation. Competition appears to have grown because of the addition of West zone wind generation. However, Wind generation can compete to resolve West to North congestion, but cannot compete to resolve North to West congestion if the wind does not blow. However, Wind generation can compete to resolve West to North congestion, but cannot compete to resolve North to West congestion if the wind does not blow.