Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 04.

Slides:



Advertisements
Similar presentations
Durra Eco-Form Cabins Build your own home and move in within a week Fast, Simple and Affordable.
Advertisements

The Student Handbook to T HE A PPRAISAL OF R EAL E STATE 1 Chapter 10 Improvement Analysis.
Beyond Luxuries….Theres Bliss. Tower of Faith, Luxury Apartments Situated near Suburban Club, Seaport Airport Road, Kakkanad is a collection of 171 Apartments.
Building and Grounds Committee Mike Clarey, chairman Ken Plueger Tom Reuter Tim Pick Bill Anthony Fr. Matt Hewitt.
Dehradun DEHRADOON PHASE – I *All inclusive cost *Including Car parking *Club Membership Extra Registration amount i.e. Rs 100,000/- +10% of cost price.
Presents. Clubhouse lower level Renovation December 2013.
THE PROJECT BRIEF… BUILD A CONTEMPORARY HOME ON A SMALL INNER CITY BLOCK WITH NO ROOM FOR ONSITE STORAGE OR SCAFFOLD.
What are they and what are they used for?. Contract Documents Architects working drawings Specifications Schedules Bill of Quantities.
SUNY Canton Facilities Project Update Miscellaneous.
Kitchen New sandwich prep table. Kitchen New pizza prep table.
Building for Learning Project Photo Progress Report Month of June 2010 Project commencement 21 st September 2009.
SHEPHERD ELEMENTARY SCHOOL PHASE I SHEPHERD ELEMENTARY SCHOOL PHASE I SITE PLAN.
NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE: 01/04/13.
© 2011 wheresjenny.com Renovating your House. © 2011 wheresjenny.com Renovating your House Vocabulary. Have an extension: Build on to the existing house.
LOGO General Trias Cavite. Along cross roads of Daang Hari and Arnaldo Hi-way.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 03.
Building the Houses Sri Lanka Tsunami Reconstruction Project in
How to build a two storey house
Building for Learning Project Photo Progress Report 6 February 2010– March 2010 Project commencement 21 st September 2009.
MSU/MCTC Law Enforcement and Criminal Justice Center March 10, 2010.
This was the existing floor Original floor in bathroom, 12” x 12” adhesive backed vinyl tiles.
MARIAN BROTHERS- YUMBE(UGANDA) Construction of toilets, kitchen and renovation of library for Immaculate Heart Secondary School Yumbe- Uganda.
Elevator Installation, Window Replacement, HVAC, Sprinklers, Block wall skimcoating (resident rooms & 1 st through 4 th floor resident corridors). New.
General Contractors  Over 10 years of Service  Commercial  Military Institutions  Government Agencies  Female Owned and Operated Firm  Teamed with.
Finishing the Building
On-the-Workforce Training Status  Plan for Jobs to be created: 300  Jobs Created to Date: 233  Tentative Selection for Hire to date: 201  Re-Advertised.
Spokane Falls Community College Building 17 Remodel The Falls Lounge April 9, 2013.
Guinn Hall Project, Summer 2014 Scope of Project Painting Flooring Tub surrounds Tile in bathrooms Electrical upgrades Light fixtures New doors Ceilings.
March 2015 ALLEN INDEPENDENT SCHOOL DISTRICT School Board Meeting March 2015 Construction Update for the Service Center.
Understanding Manufactured Home Inspections. Tips for a Professional Inspection  Ask for referrals  Call NACHI / InspectorSEEK.com  Hire a licensed.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
Building 16, 17, 153, 162, 173 (256) Safety - Renovation CH DENARIE CERN PH/DT MARCH 2011.
Final Assignment part 1: revise stairs Some minor markups.
Building for Learning Project Photo Progress Report 5 December 2009 – February 2010 Project commencement 21 st September 2009.
Prof Ralph V. Locurcio, PE CON 2001 CVE Sequence Single Family House - 3,000 square feet Duration 1 General Conditions 21 2 Apply for Permits.
CHATSWORTH HIGH SCHOOL. LOCNSNAMTASK_NAME 8583CHATSWORTH HSPURCHASE & INSTALL MODULAR BUILDING AT GIRLS SOFTBALL FIELD CHATSWORTH HSChatsworth.
Section drawings know standard construction finish attachment and dimension custom fabrications 1.
Vicinity Map Gillis W Long Center, Carville, LA Bldg 15 Stairwell Painting (1 st and 2 nd Floor) September 30, 2015.
Work Progress Photos From 1 ST To 15 TH NOV 2015.
HUGS 4 Africa Nov, 2014 Bedroom built in 4 days Gatuto Kenya.
The space behind the window sill has to be filled up with concrete and the cavity walls have to be filled up with insulation. One way is to pump the insulation.
Work Progress Photos From 15 TH To 30 TH NOV 2015.
Objectives STOP HUMIDITY DAMAGING THE CASTLE. BRING CONFORT FOR INHABITANT COST SAVING ON HEATING SYSTEM.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 02.
1BED & 2 BED APARTMENTS – TOTAL 40 UNITS TOP FLOOR BRICK WORK IN PROGRESS.
DREAMZ SUPRICHITH Location:HEBBAL Dreamz Infra India Ltd.
Call us : / AMAATRA HOMES NOIDA EXTENSION.
Falling while dismantling scaffold and footing (Serious Accidents in Construction) Construction The copyright to this material belongs to the Korea.
How can I find the area and perimeter of a rectangle? MCC.4.MD.3.
TRIGON, INC ARDMORE CITY SCHOOLS 2013 BOND ISSUE PROJECTS.
St Martin’s Projects “Welcomes you to know Christ and to make Him known” Renovation, Refurbishment & Maintenance Rectory Bathroom and study.
A HOUSE.
What’s with Time Square West? No. of Floors 43 Retail 1st and 2nd floor Parking 5 floors(2 basement, 3rd to 5th floor) No. of units 738 No. of parking.
Renovating a House.
Major Steps In Building a SFR
EDENSVILLE ESTATE SIMAWA.
Assembly And Installation Of Ikea Kitchen Cabinets
MATERIAL BOARD OF TARIS HOUSE
Building Structural Systems
BUY FURNITURE ONLINE  HOME FURNITURE  OFFICE FURNITURE  BEDROOM FURNITURE  CONSOLE TABLE & C TABLE  PHOTO FRAME.
Project Planning Please construct Gantt Charts based on… Today is
Field House, Car Colston
WESLEYAN P-4-8 MAJOR MAINTENANCE FY WASHINGTON STREET
Project Name – ID # 7/1/2009 Current Project Status Project Issues
14 Crow Hill Rise, Mansfield
Value of contract: Length of contract: Contract start date:
When all the first fix electrical and plumbing is finished the roofers return to fix the ceiling sheeting in place so the plasterers can arrive on site.
Field House, Car Colston
Wates CBE Learning Operation defects: Snag sheet slide presentation
Swimming Pool Maintenance Company in Dubai MI EMpire.
Presentation transcript:

Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 04 Date :

VIEW Descriptions -Paint to wall was completed

VIEW 2 Descriptions -Paint to wall was completed -A/C equipment has installed on site

VIEW 3 Descriptions -Paint to wall was completed

VIEW 4 Descriptions -Paint to wall was completed

VIEW 5 Descriptions -Site condition

VIEW 6 Descriptions -Site condition

Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Ground Floor VIEW 1 VIEW 2 VIEW 5 VIEW 3 VIEW 6 VIEW 4 VIEW 7 VIEW 8 PROGRESS PHOTO REPORT - 04 Date :

VIEW 1 Descriptions -Paint to wall was completed

VIEW 2 Descriptions -Paint to wall was completed -The door frame has installed

VIEW 3 Descriptions -Paint to wall was completed -Furniture arrived on site

VIEW 4 Descriptions -Plastering works in progress -The door has installed -Furniture has installed

VIEW 5 Descriptions -Paint to wall was completed

VIEW 6 Descriptions -Paint to wall was completed

VIEW 7 Descriptions -Site condition

VIEW 8 Descriptions -All the existing finish will be demolish

Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C First Floor B Ground Floor A Ground Floor VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 9 VIEW 10 VIEW 13 VIEW 14 VIEW 12 VIEW 11 VIEW 5 VIEW 6 VIEW 7 VIEW 8 VIEW 4 VIEW 2 VIEW 1 VIEW 3 VIEW 5 VIEW 6 VIEW 7 VIEW 8 VIEW 9 VIEW 10 VIEW 1 VIEW 2 VIEW 5 VIEW 6 VIEW 3 VIEW 4 VIEW 7 VIEW 8 PROGRESS PHOTO REPORT - 04 Date :

VIEW 1 Descriptions -Paint to wall was completed A Ground Floor

VIEW 2 Descriptions -Paint to wall was completed A Ground Floor

VIEW 3 Descriptions -Plastering works was completed -Furniture has installed A Ground Floor

VIEW 4 Descriptions -Paint to wall was completed -Furniture has installed A Ground Floor

VIEW 5 Descriptions -Plastering works was completed -Furniture has installed A Ground Floor

VIEW 6 Descriptions -Site condition A Ground Floor

VIEW 7 Descriptions -Plastering works was completed -Furniture has installed A Ground Floor

VIEW 8 Descriptions -Plastering works was completed -Furniture has installed A Ground Floor

VIEW 9 Descriptions -Plastering works was completed -Furniture has installed A Ground Floor

VIEW 10 Descriptions -Site condition A Ground Floor

VIEW 1 Descriptions -Plastering works was completed -Furniture has installed B Ground Floor

VIEW 2 Descriptions -Site condition B Ground Floor

VIEW 3 Descriptions -Plastering works was completed -Furniture has installed B Ground Floor

VIEW 4 Descriptions -Paint to wall was completed B Ground Floor

VIEW 5 Descriptions -Plastering works was completed -Furniture has installed B Ground Floor

VIEW 6 Descriptions -Site condition B Ground Floor

VIEW 7 Descriptions -Plastering works was completed -Furniture has installed B Ground Floor

VIEW 8 Descriptions -Furniture has installed B Ground Floor

VIEW 9 Descriptions -Paint to wall was completed -The door frame has installed B Ground Floor

VIEW 10 Descriptions -Paint to wall was completed -The door frame has installed B Ground Floor

VIEW 11 Descriptions -Site condition B Ground Floor

VIEW 12 Descriptions -Site condition B Ground Floor

VIEW 13 Descriptions -Paint to wall was completed B Ground Floor

VIEW 14 Descriptions -Paint to wall was completed B Ground Floor

VIEW 1 Descriptions -Plastering works was completed -Furniture has installed C Ground Floor

VIEW 2 Descriptions -Furniture has installed C Ground Floor

VIEW 3 Descriptions -Plastering works was completed -Furniture has installed C Ground Floor

VIEW 4 Descriptions -Furniture has installed C Ground Floor

VIEW 5 Descriptions -Furniture has installed C Ground Floor

VIEW 6 Descriptions -Plastering works was completed -Furniture has installed C Ground Floor

VIEW 7 Descriptions -Paint to wall was completed C Ground Floor

VIEW 8 Descriptions -Paint to wall was completed C Ground Floor

Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road B First Floor E First Floor E First Floor VIEW 2 VIEW 3 VIEW 1 VIEW 2 VIEW 1 VIEW 2 PROGRESS PHOTO REPORT - 04 Date :

VIEW 1 Descriptions -Tile works was completed B First Floor

VIEW 2 Descriptions -Plastering works was completed B First Floor

VIEW 3 Descriptions -Tile works was completed B First Floor

VIEW 1 Descriptions -Tile works was completed E First Floor Female Toilet & Disable toilet

VIEW 2 Descriptions -Tile works was completed E First Floor Female Toilet & Disable toilet

VIEW 1 Descriptions -Tile works was completed E First Floor Male Toilet

VIEW 2 Descriptions -Tile works was completed -The door frame has installed E First Floor Male Toilet