B. Review Board Charter and ORR Success Criteria Muthu Jeganathan Project Manager, JPL.

Slides:



Advertisements
Similar presentations
St. Louis Public Schools Curriculum Management Audit Speaker Dr. James Scott Lead Auditor for the St. Louis Public Schools Curriculum Management Audit.
Advertisements

ExoZodical Emission and ExoPlanets: Ground-based Challenges C. Beichman (NASA Exoplanet Science Institute) With lots of help from A. Tanner (Georgia State),
Texas Department of Information Resources Presents
PEER REVIEW OF TEACHING WORKSHOP SUSAN S. WILLIAMS VICE DEAN ALAN KALISH DIRECTOR, UNIVERSITY CENTER FOR ADVANCEMENT OF TEACHING ASC CHAIRS — JAN. 30,
Jeffrey Kronenwetter PLT Director PLT Coordination & Field Campaign Preparations.
Jet Propulsion Laboratory California Institute of Technology AFTA Coronagraph Recommendation Process Gary Blackwood, Exoplanet Exploration Program Manager.
Evaluation Team Chair Training Presented By Dr. Tim Eaton TRACS Regional Representative.
Federal Aviation Administration Commercial Space Transportation Human Space Flight Occupant Safety Telecon Telecon 7 – Medical Guidance for Crew & Spaceflight.
SOFIA Stratospheric Observatory for Infrared Astronomy DCS PDR at RIT3/7/2000 DCS Preliminary Design Review Sean C. Casey USRA Senior Scientist Lead Scientist.
Software Project Transition Planning
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
Functional Requirements for NGAO Christopher Neyman W. M. Keck Observatory NGAO Team Meeting #9 August 24, 2007.
Technical Performance Measures Module Space Systems Engineering, version 1.0 SOURCE INFORMATION: The material contained in this lecture was developed.
EPLC Deliverables Sherry Brown-Scoggins & Wanda Hall
PMSS Final SOW May 22 nd, Statement of Work 2 GLENN RESEARCH CENTER PROJECT MANAGEMENT SUPPORT SERVICES (PMSS) The Contractor shall provide expert.
Revenue Cycle Management Medical Technology Acquisition and Assessment Team Members: Joseph Dixon, Michael Morotti, Mari Pirie-St. Pierre, David Robbins.
I. Plan to Meet PLRA Threshold Requirements Phil Hinz Principal Investigator.
TEMPO Mission Project July 23, 2013 Project Manager: Alan Little.
LBTI ORR Pre-Briefing to the Board April 14,
Do it pro bono. Key Messages & Brand Strategy Service Grant.
FY2010 PEMP Notable Outcomes October 15, FRA, LLC Board of Directors 10/15-16/2009 Office of Quality and Best Practices Performance Evaluation Management.
GTRInewFormat.ppt-1 Electronic Systems Laboratory TMC Operator Requirements and Position Descriptions, Phase 2, Kickoff Meeting Presented by Dennis J.
J. Large Binocular Telescope (LBT) Operational Readiness
C. Executive Summary Phil Hinz Principal Investigator.
NASA IT Governance Overview Gary Cox August 18, 2010.
Exoplanet Exploration Program Large Binocular Telescope Interferometer (LBTI) Operational Readiness Review (ORR) PI: Phil Hinz, UA PS: Rafael Millan-Gabet,
IT PMB: Executive Oversight and Decision Authority for Application and Infrastructure Projects at NASA Larry Sweet Chair, IT PMB JSC CIO August 2010.
1 JPSS Engineering Review Board (ERB) Sea Surface Temperature (SST) Product Configuration Change Request (CCR) Evaluation 9 May 2014.
LBTI HOSTS Science Operations Plan Draft 0 – Feb
Dr. Chas Beichman, Executive Director Dr. Rachel Akeson, Deputy Director Dr. Dawn Gelino, Science Community Affairs 25 April 2012.
OFFICE OF SCIENCE 1 Closeout Presentation and Final Report Procedures.
Jet Propulsion Laboratory California Institute of Technology LBTI Meeting Goals Gary Blackwood Program Manager, Exoplanet Exploration Program Steward Observatory,
MD Digital Government Summit, June 26, Maryland Project Management Oversight & System Development Life Cycle (SDLC) Robert Krauss MD Digital Government.
OFFICE OF SCIENCE 1 3. Cost Estimate Gines, Fisher 2.Are the estimated cost and proposed schedule ranges realistic, consistent with the technical and budgetary.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
Final Version Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Mission Operations Tim Rykowski Jeffrey Hosler May 13-17, 2002.
Executive Summary Target Deployment – January 4, 2005 Actual Deployment – December 22, 2004.
L. NExScI Operational Readiness Rafael Millan-Gabet Project Scientist, NExScI & Mihseh Kong, NExScI Software Engineer David Imel, IPAC & NExScI Manager.
LBNE Working Group Meeting December 20, :00– 5:00 PM Snake Pit.
1 Astronomy and Astrophysics Advisory Committee, Feb 2005 SAWG Letter and Ground-Based Archiving AAAC, Feb 16, 2005 Alan Smale, Universe Division.
SACS and The Accreditation Process Faculty Convocation Southern University Monday, January 12, 2009 Presented By Emma Bradford Perry Dean of Libraries.
WGISS /09/2015 DATA PRESERVATION – CNES APPROACH B. Chausserie-Laprée.
SSC SI Data Processing Pipeline Plans Tom Stephens USRA Information Systems Development Manager SSSC Meeting – Sept 29, 2009.
N. Summary Phil Hinz Principal Investigator. Performance N-2.
F. LBTI Current Performance and Compliance with ORR Entrance Criteria Phil Hinz Principal Investigator.
Fermilab Presentation Greg Bock, Pepin Carolan, Mike Lindgren, Elaine McCluskey 2014 SC PM Workshop July 2014.
LBTI Program Management Review Phil Hinz S.H. (Hop) Bailey 9 July
OFFICE OF SCIENCE 1 Closeout Presentation and Final Report Procedures.
External Peer Review of the FDA Office of Regulatory Affairs Pesticide Program FDA Science Board Advisory Committee Meeting March 31, 2006.
KEY PERSONNEL Dr. Bob Schutz, GLAS Science Team Leader Dr. Jay Zwally, ICESat Project Scientist, GLAS Team Member Mr. David Hancock, Science Software Development.
What is project management?
OFFICE OF SCIENCE 1 Closeout Report on the DOE/SC CD-3b Review of the Utilities Upgrade Project (UUP) Fermi National Accelerator Laboratory August 11-12,
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
Andy Wilson – Team Manager HR Education (School Teacher Appraisal) (England) Regulations 2012 A briefing for Heads and Governors.
Project Life Presented by Chuck Ray, PMP ITS Project Manager.
IV&V Facility 7/28/20041 IV&V in NASA Pre-Solicitation Conference/ Industry Day NASA IV&V FACILITY July 28, 2004.
Real Property Policy Update Planning and Development Committee August 4, 2015.
Prof. Shrikant M. Harle.  The Project Life Cycle refers to a logical sequence of activities to accomplish the project’s goals or objectives.  Regardless.
OFFICE OF SCIENCE DOE/SC CD-3c Review of the Muon to Electron Conversion Experiment (Mu2e) Project Fermi National Accelerator Laboratory June 14-16, 2016.
Esther Bushell – School Governance and Workforce Adviser
GLAST Large Area Telescope:
NASA Independent Reviews -Lessons Learned-
Systems Engineering Management
Dr. Samson Kironde USAID HRH2030 Program July 23, 2018
CIS12-3 IT Project Management
Gustaaf van Moorsel September 9, 2003
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
CMB-S4 Detectors & Readout Task Force Update
Overview Cost to Complete
Presentation transcript:

B. Review Board Charter and ORR Success Criteria Muthu Jeganathan Project Manager, JPL

Board NameAffiliation Dr. Scott Gaudi, ChairOhio State University Dr. Theo ten BrummelaarGeorgia State / CHARA Dr. Sam RaglandWM Keck Observatory (WMKO) Dr. Gerard van BelleLowell Observatory Dr. Marc KuchnerGoddard Space Flight Center (GSFC) Dr. Ellyn BainesNaval Research Laboratory (NRL) B-2 Observers Hashima HasanNASA, Program Scientist Debra WallaceNASA, Deputy Program Scientist Mario PerezNASA, Program Executive Gary BlackwoodJPL, Exoplanet Exploration Program Office

ORR Success Criteria (SC) 1.The ORR performance requirements [12 zodi, 0.4 mJy, and 35 in-guide stars] are sufficient to meet the PLRA science objectives [inform future mission design and sensitivity >10  higher than state of the art] 1.LBTI ORR performance requirements a)LBTI demonstrates 12-zodi sensitivity (1 , single star measurement, PLRA zodi model) b)In-guide plan (available nights) and assumptions (efficiencies and current capability) for SVP and HOSTS are documented and the science scope (<2 zodi uncertainty on median) are all consistent c)Credible plans* documented to meet PLRA threshold performance requirements (6 zodi, 0.3 mJy) by end of science validation phase with risk that is medium or lower 2.LBTI science data management planning and procedures meet all PLRA requirements 3.The necessary interferometer operations plans and procedures are complete, documented and in place, and under configuration management 4.The necessary pipeline processing algorithms, plans and procedures are complete, documented and in place, and under configuration management 5.The necessary staffing is in place and training has taken place 6.Project risks are documented and acceptable 7.During SVP, UA is ready to assume responsibility for LBTI operations and data delivery; and NExScI is ready to assume responsibility for archive * Scope, supporting analysis, baseline schedule, personnel, contingency, risks 0. B-3

Charge to the Board Evaluate whether the ORR performance requirements (SC 0) meet the PLRA science objectives/mission success criteria – Board and NASA APD/HQ briefed on April 14 Evaluate LBTI on success criteria 1–7 Document findings and recommendations – Verbally at end of review – Circulate draft board report within one week – Deliver final board report to Project/ExEPO/NASA within 4 weeks of review (May 25, 2015) Serve to close findings within 3 months B-4

Ground Rules Board Chairman: – Calls time on presentations/discussions – Recognizes speakers/questions from audience Project will respond to written recommendations from Board – The board chair and PM will disposition all recommendations – Project response will either provide closure information, identify future action plan to close, or acceptance as an advisory B-5