Understanding the Texas Accountability System. – 1979 Texas Assessment of Basic Skills (TABS) – 1985 Texas Educational Assessment of Minimum Skills (TEAMS)

Slides:



Advertisements
Similar presentations
1 Adequate Yearly Progress (AYP) U.S. Department of Education Adapted by TEA September 2003.
Advertisements

School Accountability Ratings What Are Our District’s Accountability Ratings? What do they mean?
‘No Child Left Behind’ Loudoun County Public Schools Department of Instruction.
Data Analysis State Accountability. Data Analysis (What) Needs Assessment (Why ) Improvement Plan (How) Implement and Monitor.
1 Accountability System Overview of the Accountability Rating System for Texas Public Schools and Districts.
Accountability preview Major Mindshift Out with the Old – In with the New TEPSA - May 2013 (Part 2) Ervin Knezek John Fessenden
Accountability Updates Testing & Evaluation Department May 21, 2014 Mission High School MISSION CISD DEIC MEETING.
Texas State Accountability 2013 and Beyond Current T.E.A. Framework as of March 22, 2013 Austin Independent School District Bill Caritj, Chief Performance.
School Report Cards 2004– The Bottom Line More schools are making Adequate Yearly Progress. Fewer students show serious academic problems (Level.
Graduation, Completion, & Dropout. Re-Alignment Accountability Graduation Completion Dropout District Practice PEIMS Reporting.
2013 State Accountability System Allen ISD. State Accountability under TAKS program:  Four Ratings: Exemplary, Recognized, Academically Acceptable, Academically.
Adequate Yearly Progress 2012 Comfort ISD. Measures Evaluated Reading/ELA – Percent of students (Grades 3-8 and 10) who are Proficient in Reading/ELA.
Schools in Alert and Schools in Need of Improvement Summary of 2007 Statistics Prepared by NORMES, University of Arkansas Presented to the Joint Adequacy.
1 Utah Performance Assessment System for Students U-PASS Accountability Plan Judy W. Park Assessment & Accountability Director Utah State Office of Education.
State Accountability Overview 1 Performance Index Framework: For 2013 and beyond, an accountability framework of four Performance Indexes includes a broad.
The best and most sought-after school district where every student is future ready: ready for college, ready for the global workplace, ready for personal.
Academic Excellence Indicator System (AEIS) Report Presented to ACISD Board of Trustees 12/15/2011 ARANSAS COUNTY ISD – A TEA RECOGNIZED SCHOOL.
Accountability 101. State Accountability Federal Accountability # Students Met Standard # Students Tested If the Standard is not met: Apply Required.
Index Accountability 2014 Created by Accountability and Compliance staff of Region 17 Education Service Center.
Introduction to Adequate Yearly Progress (AYP) Michigan Department of Education Office of Psychometrics, Accountability, Research, & Evaluation Summer.
State Accountability and Federal Adequate Yearly Progress.
RECOGNIZED 2009 Accountability Rating. Basic Indicators EXEMPLARY: for every subject, at least 90% of the tested students pass the test RECOGNIZED**:
Update on the State Testing Program November 14, 2011.
Questions & Answers About AYP & PI answered on the video by: Rae Belisle, Dave Meaney Bill Padia & Maria Reyes July 2003.
2013 Accountability Ratings for NISD September 9, 2013.
STATE ACCOUNTABILITY OVERVIEW Back To School| August 19-22, 2013 Dean Munn Education Specialist Region 15 ESC.
Timmerman Public Hearing September 16, :00-7:00.
AYP vs. AEIS Talking Carroll Elementary October 5, 2010.
State & AYP Accountability Ratings Highlights District Ratings by Rating Category (including Charter Operators) ACCOUNTABILITY RATING 2009 CountPercent.
Boyd Independent School District 2012 District Performance/AEIS Report.
Timmerman Public Hearing February 4, :00-4:00.
1 Accountability System Overview of the PROPOSED Accountability Rating System for Texas Public Schools and Districts.
Texas Public School Accountability Presented at Midwinter by the Texas Education Agency.
Ysleta Independent School District 2004 Accountability State and AYP.
Public Hearing & Presentation of MISD Annual Accountability Report 2009 MILLSAP ISD Prepared by Lois Johnson in compliance with Texas Education Code
Texas Projection Measure. What is TPM? TPM is a method for… – projecting future student scores -OR- – determining whether a student is likely to pass.
10/19/2015 Academic Excellence Indicator System Woden ISD.
Academic Excellence Indicator System (AEIS) Report January 20, 2009 Dr. Joan Bowman Assistant Superintendent Sheldon ISD.
Helping EMIS Coordinators prepare for the Local Report Card (LRC) Theresa Reid, EMIS Coordinator HCCA May 2004.
Timmerman Public Hearing September 16, :00-4:00.
1 Adequate Yearly Progress (AYP) U.S. Department of Education Adapted by TEA Modified by Dr. Teresa Cortez September 10, 2007.
Lodi Unified School District Accountability Progress Report (APR) Results Update Prepared by the LUSD Assessment, Research & Evaluation Department.
Lazbuddie ISD Texas Academic Performance Report (TAPR)
Academic Excellence Indicator System Report For San Antonio ISD Public Meeting January 23, 2006 Board Report January 23, 2006 Department of Accountability,
Assigns one of three ratings:  Met Standard – indicates campus/district met the targets in all required indexes. All campuses must meet Index 1 or 2.
Draft...proposals may change1 Proposed Changes to the Texas Accountability System Adapted from “Accountability System for 2006 and Beyond- Standard Procedures”
– 2008 Analysis of TAKS Results Data by Student Groups.
Accountability 2013 Interpreting Your 2013 Accountability Report It’s Like Learning To Read All Over Again Ervin Knezek John Fessenden.
1 Adequate Yearly Progress (AYP) U.S. Department of Education Adapted by TEA Modified by Dr. Teresa Cortez January 2010.
Kingsville ISD Annual Report Public Hearing.
1 Adequate Yearly Progress (AYP) U.S. Department of Education Adapted by TEA Modified by Dr. Teresa Cortez September 1, 2008.
1 Adequate Yearly Progress (AYP) U.S. Department of Education Adapted by TEA May 2003 Modified by Dr. Teresa Cortez for Riverside Feeder Data Days February.
HISD Becoming #GreatAllOver 1 Accountability Rating System Commissioner’s Final Rules 2014.
TAKS Release Plan  In 2007 SB 1031 changed the release of tests to every three years  In 2009 HB 3 changed the release of tests to exclude retests 2.
Adequate Yearly Progress [Our School District]
Accountability in California Before and After NCLB
State Accountability Update
Changes Ahead: Accountability
Adequate Yearly Progress (AYP)
Texas Academic Performance Report TAPR)
Adequate Yearly Progress [Our School District]
Section II Accountability
Accountability Update
AEIS [Our School District]
Campus Comparison Groups and Distinction Designations
Understanding AYP Campus Data
Section II Accountability
Texas State Accountability
Schools in Alert and Schools in Need of Improvement
Presentation transcript:

Understanding the Texas Accountability System

– 1979 Texas Assessment of Basic Skills (TABS) – 1985 Texas Educational Assessment of Minimum Skills (TEAMS) – 1990 Texas Assessment of Academic Skills (TAAS) Texas Essential Knowledge and Skills (TEKS) – 2003 Texas Assessment of Knowledge and Skills (TAKS) – 2011 State of Texas Assessments of Academic Readiness or (STAAR) Brief History

AEIS System History In the early 1980s, Governor Mark White appointed Ross Perot as the chair for the Select Committee on Public Education. This was the beginning the political movement of accountability in Texas. –Compete with other states academically. –Increase under represented populations at state universities. –Increase overall human capital in Texas to encourage businesses to come to Texas.

AEIS v. NCLB Texas Education AgencyUS Department of Education Academic Excellence Indicator System (AEIS) Adequate Yearly Progress (AYP) Performance Math Reading Writing Participation Social StudiesMath ScienceReading Completion RateAttendance Dropout RateGraduation Rate

Accountability Texas Education AgencyUS Department of Education Academic Excellence Indicator System (AEIS) Adequate Yearly Progress (AYP) Exemplary (90%)Met AYP Reading (67%) (2010 = 73%) Recognized (75%) (2010 = 80%) Math (58%) (2010 = 67%) Participation (95%) Academically Acceptable (Varies) Reading (70%) Missed AYP Writing (70%) Social Studies (70%) Math (55%) (2010 = 60%) Science (50%) (2010 = 55%) Academically Unacceptable

Reading/ELA = Grades 3-11 Writing = Grades 4, 7 Social Studies = Grades 8, 10, 11 Mathematics = Grades 3-11 Science = Grades 5, 8, 10, 11 When subjects are evaluated?

–Performance is evaluated for All Students and the following student groups: African American Hispanic White Economically Disadvantaged –Why not Asians? What populations are evaluated?

–All Students. These results are always evaluated regardless of the number of examinees. 30/50/10 –Fewer than 30 students tested… not evaluated. –Between 30 to 49 students and the student group comprises at least 10% of all students… evaluated. –More than 50 students tested… evaluated. Minimum Size Requirements?

October Subset For the TAKS, only the performance of students enrolled on the last day of October are considered in the ratings. This is referred to as the accountability subset, “as of” date, October subset, PEIMS date or the mobility adjustment. Campuses are held accountable only for those students reported to be enrolled at the campus in the fall and tested at the same campus in the second semester. However, districts are held accountable for campus to campus transfers. If a student transfers out of district the district is relieved of the responsibility for that student.

Completion Rate (Grades 9-12) Districts and campuses that have served grades 9 through 12 for five or more years. Students who first attended grade 9 in the school year and have completed or are continuing their education four years later. –“04-05 Cohort” To count as a "completer" a student must have received a high school diploma with his/her class (or earlier) or have re-enrolled in the fall the following year. –Exemplary – 95.0% –Recognized – 85.0% –Academically Acceptable –75.0%

Dropout Rate (Grades 7 and 8) The dropout rate is used to evaluate campuses and districts with students in grades 7 and/or 8. This is a one-year measure, calculated by summing the number of dropouts across the two grades. The standard for the Annual Dropout Rate is 2.0% or less. Any district or campus with a rate higher than 2.0% that does not demonstrate Required Improvement will be rated Academically Unacceptable.

The “Gates”

Required Improvement Campuses and districts may achieve a higher rating using Required Improvement. It can be applied to three base indicators – TAKS, Completion, and Dropout Rate – to raise a rating from Academically Unacceptable to Academically Acceptable or from Academically Acceptable to Recognized. All calculations for Required Improvement are done automatically by TEA. The campus or district must have shown enough improvement on last years measure to be able to meet the current years standard in two years.

Example Perry Elementary school scored a 71% in the area of economically disadvantaged science in What would be the minimum they would have to score in 2011 in order to obtain the recognized standard by using required improvement? Actual Change = Performance in Performance in 10 Required Improvement = Standard for 2011 – Performance in 10 2

Example Perry Middle School scored a 71% in the area of economically disadvantaged science in What would be the minimum they would have to score in 2011 in order to obtain the recognized standard by using required improvement? Actual Change = X - 71 Required Improvement = 75 – 71 = 4 = X = 73

Texas Projection Measure The Texas Projection Measure (TPM) was new for After Required Improvement has been evaluated, TPM is applied. Estimate of whether a student is likely to pass a TAKS test in a future grade.

Exceptions Campuses or districts may also be able to “gate up” one final time after being evaluated under Required Improvement and TPM. The Exceptions Provision provides relief to larger campuses and districts with more diverse student populations who are evaluated on more measures. Up to four Exceptions may be used to gate up to Acceptable, Recognized. Only one exception may be used to gate up to Exemplary.