May 21, 2009John MacKenty, STScI1 WFC3 SM4 Events and Current Status.

Slides:



Advertisements
Similar presentations
EIS/Solar-B: 3. Electrical Interface to MDP EISMDP PIM HK PIM DHU DR analog data (temperature, current, etc.) S/C bus image compression status data command.
Advertisements

Electrical and thermal testing at Glasgow and Liverpool.
1 FGS Guider CDR – April 19, 2007 © Copyright 2007 Her Majesty the Queen in Right of Canada Subject to Controlled Goods Regulations of Canada FGS Guider.
The Second Generation of IR detectors for WFC3 Massimo Robberto European Space Agency and Space Telescope Science Institute.
Return to Hubble: Servicing Mission 4 Dr. Frank Summers Space Telescope Science Institute April 2, 2009.
1 ACS Status Update STScI TIPS Meeting 19-October-2006 Ken Sembach.
SDW Marco Sirianni Marco Sirianni (ESA/STScI) Max Mutchler (STSci) Radiation Damage in HST Detectors.
Astronomical Detectors
Page 1 9/4/01 SMS Test Phase 2 & 3 WFC3 FSW and STScI Development Flow through SMGT 4/1/02-6/30/02 FSW 2.1 C&UT 7/8/01-8/15/01 FSW 2.2 C&UT - WFC3 Software.
Hubble Space Telescope Goddard Space Flight Center Hubble Ultra-Wide-Field Imager (HUFI) David Leckrone Senior Project Scientist for HST December 16, 2001.
Rapid Pneumatic Transportation of Radioactive Samples System Steve Padalino & Ed Pogozelski SUNY Geneseo.
David Nelson STAVE Test Electronics July 21, ATLAS STAVE Test Results Version 1 David Nelson July 21, 2008.
SDW2005, juin, Taormina The Corot Space instrument.
Berkeley workshop summary Redundancy : dual detector Field of view : 3”x6” Spectrograph length goal: < 400 mm Isostatic mount on the base plate with control.
"Data contained herein is exempt from ITAR regulations under CFR 125.4(13) -- data approved for public disclosure." 25 June, 2002WFC3 Monthly Status Review1.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
1 TIPS 2011 May Persistence in the WFC3 IR detector Knox S. Long.
AST3 detector properties
TIPS - October Updates on ACS-R Marco Sirianni October 18, 2007.
January, Please join us in the Tech Tower Auditorium on Tuesday, January 30th for a WFC3 Post-CDR Celebration 4:30 to 7:30 pm Dinner and adult beverages.
1 ACS Side-2 Performance Update STScI TIPS Meeting 20-July-2006 Ken Sembach.
CCDs in space: the effects of radiation on Hubble’s Advanced Camera for Surveys (ACS) Max Mutchler, David Golimowski (Space Telescope Science Institute),
September 10, TaskLeadDue Dates COS FSW Build 3.1 (Preparation for MEB Functional) HW needs: fully functional Mechanism Simulator 1.Complete unit.
ACD Calibrations in L&EO Needed Calibrations Pedestals (low and high range) Low range gains via MIP peak positions Veto and HLD discriminator set points.
Overview of STIS Repair Plans Charles R. Proffitt November 16, 2006.
1 Wide Field Camera 3 Monthly Status ReviewJuly 17, 2007 WFC3 TIPS July 19, 2007.
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
NIRSpec Operations Concept Michael Regan(STScI), Jeff Valenti (STScI) Wolfram Freduling(ECF), Harald Kuntschner(ECF), Robert Fosbury (ECF)
10/26/20151 Observational Astrophysics I Astronomical detectors Kitchin pp
LSST Electronics Review – BNL, January LSST Electronics Review BNL January Electronics Development Plan Goals and Plans for
ACS Current Status M.Sirianni TIPS Feb 15, Agenda : ACS Side-2 failure SBC reactivation ACS programs conversion.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
The Status of HST/WFC3 John W. MacKenty Space Telescope Science Institute 12 August 2014 Calibration Workshop.
ACS STATUS Linda Smith (thanks to David Golimowski for providing the slides)
Observational Astrophysics I
Torsten Böker TIPS May 2, 2002 NICMOS post-cooldown detector performance 1) SMOV status 2) Dark current 3) Quantum efficiency 4) “First light”, focus and.
PFP Instrument Status All PFP Instruments Except SWEA have been delivered, integrated, and tested; supporting environmental tests Issues: –EUV alignment.
1 TIPS May 17, 2007 WFC3 Ambient Calibration #2 Results H. Bushouse.
FVTX Review, November 17th, FVTX Mechanical Status: WBS 1.6 Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
START NICMOS COOLING SYSTEM ACTIVITY SUMMARY. 1/25/01Ken Pulkkinen2 START NCS ACTIVITY Applicable SMOV Requirements: J NICMOS Cooling System.
The WFPC2 WF4 Anomaly John Biretta 15 Dec Overview Discovery of the Anomaly Historical Evolution Imaging Impacts GO Science Impacts Image Repair.
"Data contained herein is exempt from ITAR regulations under CFR 125.4(13) -- data approved for public disclosure." 19 Sept, 2002TIPS – WFC3 Status 1 -UVIS.
TIPS - Oct 13, 2005 M. Sirianni Temperature change for ACS CCDs: initial study on scientific performance M. Sirianni, T. Wheeler, C.Cox, M. Mutchler, A.
Jan 15, 2004WFC3 TIPS – John W. MacKenty1 WFC3 TIPS Presentation January 15, 2004 Optical Stimulus.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA SMOV4 Requirements Review Cosmic Origins Spectrograph Scott D. Friedman STScI 30 July 2003.
The Second Generation of IR detectors for WFC3 Massimo Robberto European Space Agency and Space Telescope Science Institute.
October 1, TaskLeadDue Dates COS FSW Build 3.1 (Preparation for MEB Functional) HW needs: fully functional Mechanism Simulator 1.Complete unit level.
1 WFC3 Science Data Volume  Data Volume Estimates for WFC3 Operations ISR WFC ; Lisse, Henry, Knezek, Hanley; 3/27/2001 ISR WFC ; Lisse,
Click to Change Title Here is a text box to present information in paragraph format, instead of bulleted lists. We’ve left space to the right for an image.
STScI 2010 Calibration Workshop The NICMOS Legacy Archival Recalibration Project Anton M. Koekemoer and the STScI NICMOS Team (E. Barker, E. Bergeron,
WFC3 SMOV Report for TIPS 16 July 2009 John MacKenty This presentation contains material that is embargoed until after the SM4 ERO press conference. Images/spectra.
STIS Status TIPS July 16, STIS Status STIS MIE anomaly –What is known STIS CCD status before the anomaly STIS MAMA SMOV status.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 24 October 2007.
1 WFC3 – Critical Science Review Science Driven CEIs Requirements.
May 22, 2003WFC3 Report at the June 03 TIPS1 Optical alignment and image quality testing at GSFC Test lead: Bill Eichorn, GSFC Test conductors: George.
Installation of the ACS Guido De Marchi – TIPS meeting – Guido De Marchi - ESA/STScI - ACS Group The ACS was installed on board the HST on the.
STIS STATUS Charles Proffitt TIPs May 21, STIS Status - Status of Repair Results of FT Amp B Bias Anomaly Changes to SMOV Plan.
Cosmic Origins Spectrograph November 13, 2003 Page 1 “Data contained herein is exempt from ITAR regulations under CFR 125.4(13) -- data approved for public.
Spectrograph focal plane 2003 Goals : CCD l Improved CCD Cryostat connections, decoupling, preamp box photodiodes for efficiency monitoring thermistances.
SMOVSMOV  ACS has now completed SMOV Program –Transitioned to interim calibration plan  Final SMOV programs –Further coronagraph calibration –Coronagraph.
NICMOS Suspend Event STB 632 “MECH_2_MAX_RETRIES_EXCEEDED” 2008/069.
HST Cal Conf -- Oct 27, Calibration Status and Results for Wide Field Camera 3 – R. Kimble/GSFC, Calibration Status and Results.
SiW ECAL: the status before Fermilab Marcel Reinhard LLR – Ecole Polytechnique CALICE caollaboration meeting 18/03/08, Argonne.
EMC BWE Proto18 - Orsay Meeting 1 PANDA EMC BWE Proto18 Mikel Catania Goikoetxea, Javier Navarro Medrano, David Rodríguez Piñeiro, Yue Ma, Frank.
S. Baggett, J. Anderson, J. MacKenty, J. Biretta, K. Noeske, and the WFC3 team (STScI) HST/WFC3 UVIS Detectors: Radiation Damage Effects and Mitigation.
TEMPO Instrument Update
4x8 Mosaic Camera Development
WFC3 STUC 18 November 2004 Optical Stimulus.
Launch and On-orbit Checkout
STScI Ground System Development Status:
Presentation transcript:

May 21, 2009John MacKenty, STScI1 WFC3 SM4 Events and Current Status

May 21, 2009John MacKenty, STScI2 WFC3 Loaded in WSIPE August 2008 WFC3 was delivered to KSC in August 2008 –Final Functional test –Configured for flight (vent tubes) –Latches lubricated –Loaded into WSIPE Two trips to launch pad Monitoring of contamination witness mirrors

May 21, 2009John MacKenty, STScI3 SM4 Installation WFPC2 Removal –Undo Blind Mate Connector –Undo Ground Strap –Undo A-latch (could not be done with MTL – Drew did by hand) Not a “bolt” but a long mechanism Remove WFC3 from WSIPE –Open CCD and IR Vent Valves –Undo A-latch Install WFC3 into HST –Align with Guide Rails –Activate A-latch –Attach ground Strap –Activate Blind Mate Connector

May 21, 2009John MacKenty, STScI4 Aliveness and Functional Tests WFC3 Aliveness Test –Verified Side 1 and Side 2 Power; Side 2 command and data transfer WFC3 Functional Test –Basic verification of MEB2, CEB, DEB Suspend on DEB power-on due to known issue on unused voltage –Patched to generate status buffer message rather than Suspend –Verified CSM, FSM, SOFA, Shutter, and focus/alignment mechanisms –Powered on IR 6-Stage, UVIS 4-Stage, UVIS 2-Stage, and TECFIRE TECs Demonstrated nominal voltage&currents; observed 6-stage and 4-stage temp changes –Obtained 10 images 6 UVIS: Bias, 20s Dark, two “noise” images, two internal flat images 4 IR Images: Rapid dark, STEP25 dark, two “noise” (RESET) images –WFC3 fully passed FT for both UVIS and IR Channels!

May 21, 2009John MacKenty, STScI5 UVIS bias WFC3’s first orbital exposure

May 21, 2009John MacKenty, STScI6 UVIS dark Nominal Dark –“Scratches” exactly like ground data –Count rates reasonable Do not have ground data exactly at this temperature –Now we see COSMIC RAYS

May 21, 2009John MacKenty, STScI7 UVIS engineering noise, Amps AD & BC PRELIMINARY indication of expected 3.1 electrons read noise –Consistent with ground testing –This is a WARM measurement that tests signal chain

May 21, 2009John MacKenty, STScI8 UVIS F606W and F350LP tungsten lamp

May 21, 2009John MacKenty, STScI9 IR RAPID, NSAMP =7

May 21, 2009John MacKenty, STScI10 IR STEP25, NSAMP =7

May 21, 2009John MacKenty, STScI11 IR engineering images Warm test with continuous pixel reset –Provide some indication of readnoise –Appears unchanged from ground IR detector testing WARM demonstrates –Detector is alive (wire bonds OK) –Signal chain is OK

May 21, 2009John MacKenty, STScI12 Status Thermal –Cold plate VCHP radiator was running rather warm –Oscillations seen in Cold plate heater –Couple of adjustments to balance between cold plate heater and VCHP did not resolve oscillations (which were also seen in TV) –Changed configuration Wednesday afternoon Cold plate heater full on and VCHP controlling Appears to be stable at cost of Bench down 1 to 1.5 degrees WFC3 transition from Protect-Safe to Protect-Operate on Monday –Repeat of most of FT test plus memory and data buffer tests next week Wait until expiration of 21 day Detector Vent and BEA periods

May 21, 2009John MacKenty, STScI13 WFC3 RIU Temperatures this morning