LBT Q1 2009 Engineering and Software Review ENGG Engineering General.

Slides:



Advertisements
Similar presentations
06 April 2009 LBT Q Eng/SW Review LBT Q Eng/SW/Mtn Review OSS – Optical Support Structure Paul Grenz.
Advertisements

LBT Q Eng/SW Review SFWG – Software Group General Norm Cushing.
LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
LBT Q Engineering Review ALPC – Primary Mirror Aluminum Shooting.
G v1 H1 Squeezer Experiment Update L-V Meeting, Caltech, March 18, 2009 ANU, AEI, MIT, CIT and LHO Ping Koy Lam, Nergis Mavalvala, David McClelland,
1 LBT Q Eng/SW Review SHTR: Shutters. 2 Highlights (Q1/2009) Shutters have been working well, generally Shutters have been working well, generally.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
Magellan Associate Director Report Personnel Observing Statistics Commissioning of Instruments.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
J. Large Binocular Telescope (LBT) Operational Readiness
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Kern.
EVLA Computing Overview Gareth Hunt EVLA Advisory Committee 2002 June
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
LBT Q Eng/SW Review ROT - Rotators. 4-Apr-2008LBT Q Eng/SW Review Highlights First BG rotator installed First BG rotator installed BG cable.
Magellan Telescopes Observatory Report Accomplishments Problems Work in Progress Network f5 mirror coating.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Engineering Review Primary Mirror Cells Biddick/Gusick/Kern.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
1 LBT Q Eng/SW Review ECS: Enclosure Control System.
LBT Q Engineering Review Swing Arms (SWA) Apr-04LBT Q Engineering Review Highlights (Q4/2007) The PF SAs lost their cable trays The.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
1 LBT Q Engineering Review ICS – Instrument Cooling System.
LBT Q Software Review GCS – Guiding and Active Optics.
1 LBT Q Eng/SW Review PVM: Preventive Maintenance.
LBT Q Eng/SW Review TERC Tertiary Mirror Units Commissioning.
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Howard.
3.1.1 Optics, Optical Corrector, Mechanical Systems M. Johns, C. Claver.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
LBT Q Eng/SW Review MCSC – Mount Control System.
LBT Q Engineering Review DYB. 21-Dec-2007LBT Q Engineering Review Highlights (Q4/2007) Currently in Commissioning Phase Currently in Commissioning.
LBT Q Engineering Review Instrument Cooling.
1 LBT Q Eng/SW Review ICS – Instrument Cooling System.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
LBT Q Eng/SW Review SFWG – Software Group Norm Cushing.
LBT Q Engineering Review SAB Static Balancing.
1 LBT Q Engineering Review PLMG: Plumbing, includes IC system, chiller systems, instrument lab cooling, and LUCIFER cryo-compressor cooling.
LBT Q Eng/SW Review MCSC – Mount Control System.
LBT Q Eng/SW Review CM – Configuration Management Stephen Hooper.
Tevatron BPM Upgrade Stephen Wolbers CD Accelerator Coordination Meeting September 21, 2004.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
PHENIX WEEKLY PLANNING 12/7/06 Don Lynch. 12/7/06 Weekly Planning Meeting 2.
LBT Q Engineering Review ESW Engineering Software.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
1 LBT Q Engineering Review ECS: Enclosure Control System, includes the dewpoint sensor, CA system upgrades, grounding, enclosure track performance.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
LBT Q Engineering and Software Review ENGG Engineering General.
LBT Q Engineering/Software Review ROTRotators.
望遠鏡の運用状況 友野大悟. CAUTION Telescope is becoming unstable.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
LBT Q Engineering Review PMCD. 21-DEC-2007LBT Q Engineering Review Highlights (Q4/2007) Draft of System Overview and O&M manual complete except.
1 Kazuhiro Yamamoto Institute for Cosmic Ray Research The university of Tokyo LCGT internal review (Cryogenic payload) 30 January 2012.
LBT Q Engineering Review DAQ. 19-Apr-2007LBT Q Engineering Review Housekeeping System Requirements Interface directly to the Agilent 34970A.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
Seungyu Rah (Pohang Accelerator Laboratory, POSTECH, Korea) Nov
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
LBT Q Engineering Review Swing Arms (SWA). 10-Jul-2007LBT Q Engineering Review Highlights (Q2/2007) The right secondary arm is wired and the.
LBT Q Engineering Review Primary Mirror Cells.
LBT Q Eng/SW Review SFWG – Software Group General Norm Cushing.
LBT Q Engineering Review ENGG – Engineering General.
ComCam Hardware and Interfaces James Howard ComCam CAM LSST 2017 Project & Community Workshop 2017 Aug 15.
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
LIU Wire Scanner Milestones June 2017
Operator Training Requirements
Presentation transcript:

LBT Q Engineering and Software Review ENGG Engineering General

4/6/2009 LBT Q Engineering and Software Review Highlights (Q1/2009) Left Direct Gregorian Rotator and CC Left Direct Gregorian Rotator and CC Finished Design Finished Design Finished Fabrication Finished Fabrication Installed Installed Began Testing (no major problems so far) Began Testing (no major problems so far) Concluded the PMCD project Concluded the PMCD project DYB project handover complete DYB project handover complete Hired a new Engineer: James Riedl Hired a new Engineer: James Riedl

4/6/2009 LBT Q Engineering and Software Review Progress (Q1/2009) Install the LDG instrument rotator and cable chain √ Install the LDG instrument rotator and cable chain √ Address LFBG rotator and cable chain commissioning action items (no progress) Address LFBG rotator and cable chain commissioning action items (no progress) Complete “super hardpoint” detailed design √ (mostly) Complete “super hardpoint” detailed design √ (mostly) Build a prototype “super hardpoint” Build a prototype “super hardpoint” Mechanics (some progress) Mechanics (some progress) electronics √ electronics √ Conclude PMCD project √ Conclude PMCD project √ More HBS work (some progress, more scheduled this month) More HBS work (some progress, more scheduled this month) Understand the source of the Gregorian vibration (no progress) Understand the source of the Gregorian vibration (no progress) Install and test new shutter latching mechanism (no progress) Install and test new shutter latching mechanism (no progress) MCS testing and controls software upgrades √ MCS testing and controls software upgrades √ Review DYB documentation √ Review DYB documentation √ DYB handover √ DYB handover √ Fill open EE position √ Fill open EE position √ Prepare for a new baby √ (mostly) Prepare for a new baby √ (mostly)

4/6/2009 LBT Q Engineering and Software Review Open Issues Technical Technical General Telescope Reliability General Telescope Reliability Gregorian vibration Gregorian vibration PMC – hp performance PMC – hp performance HBS – reliability / performance / completeness HBS – reliability / performance / completeness M3 – reliability (some progress) M3 – reliability (some progress) MCS – much more work necessary to complete this system MCS – much more work necessary to complete this system ROT – still short on spares, but situation is improved ROT – still short on spares, but situation is improved Schedule Schedule Difficult to find time for system commissioning Difficult to find time for system commissioning Telescope schedule increasingly competitive Telescope schedule increasingly competitive Financial Financial `09 budget is tight `09 budget is tight Resource Resource Group work load high Group work load high Resources insufficient to commission subsystems on desired timetable Resources insufficient to commission subsystems on desired timetable

4/6/2009 LBT Q Engineering and Software Review Planning (Q2/2009) ROT ROT Commission LDG instrument rotator and cable chain Commission LDG instrument rotator and cable chain Install LDG instrument power, cooling and fiber Install LDG instrument power, cooling and fiber Install PEPSI spider, AGw and IRTC at LDG focal station Install PEPSI spider, AGw and IRTC at LDG focal station Commission LDG focal station Commission LDG focal station Address some of the LFBG rotator and cable chain commissioning action items Address some of the LFBG rotator and cable chain commissioning action items Begin fabrication of RFBG cable chain Begin fabrication of RFBG cable chain PMC PMC Complete “super hardpoint” prototype Complete “super hardpoint” prototype Begin “super hardpoint” production (if testing is successful) Begin “super hardpoint” production (if testing is successful) Begin work on actuator test stand upgrade Begin work on actuator test stand upgrade Design calibration reference Design calibration reference Electronics Electronics Software Software Gregorian Vibration Gregorian Vibration Collect and analyze IRTC and Accelerometer Data Collect and analyze IRTC and Accelerometer Data

4/6/2009 LBT Q Engineering and Software Review Planning (Q2/2009) MCR MCR Mirror cover rebuild review Mirror cover rebuild review M3 M3 Install DX M3 Install DX M3 Continue debug effort on SX M3 Continue debug effort on SX M3 HBS HBS Fix HBS temperature-pressure lookup table Fix HBS temperature-pressure lookup table Install and test variable-length capillary Install and test variable-length capillary Fix pump #4 intake Fix pump #4 intake Change PLC code to eliminate many of the unnecessary errors Change PLC code to eliminate many of the unnecessary errors Get HBS telemetry working through MCSPU Get HBS telemetry working through MCSPU Shutter Latches Shutter Latches Install and test new prototype latch mechanism Install and test new prototype latch mechanism Staff Staff Hire an additional engineer Hire an additional engineer