University of Sunderland CSEM04 ROSCO Unit 13 Unit 13: Supplementary Slides for the RAMESES Method CSEM04: Risk and Opportunities of Systems Change in.

Slides:



Advertisements
Similar presentations
Module N° 4 – ICAO SSP framework
Advertisements

Todays Agenda 1. Review Project Management Principles 2. Project Management Institute (PMI) Framework 3. PMI Processes 4. Break into Project Teams and.
Achieve Benefit from IT Projects. Aim This presentation is prepared to support and give a general overview of the ‘How to Achieve Benefits from IT Projects’
Presentation title Date of presentation. Setting the scene Use this slide to introduce yourself and your role within the organisation. Outline purpose.
Training Needs Analysis. Ambition in Action TAFE NSW: Doing business in the 21 st Century The TAFE NSW Workforce Development Guarantee.
Identifying enablers & disablers to change
Unit 10 University of Sunderland CSEM04 ROSCO Unit 10: The Rich Pictures Technique CSEM04: Risk and Opportunities of Systems Change in Organisations Prof.
Business Excellence within The University of Bolton Strategic Planning Process 17 th October 2006.
Unit 2 University of Sunderland CSEM04 ROSCO Unit 2: Systems Change (causes and cases) CSEM04: Risk and Opportunities of Systems Change in Organisations.
University of Sunderland CSEM04 ROSCO Unit 13 Unit 13: Supplementary Slides for the SERUM Method CSEM04: Risk and Opportunities of Systems Change in Organisations.
University of Sunderland CSEM04 ROSCO Unit 13 Unit 13: Supplementary Slides for the Riskit Method CSEM04: Risk and Opportunities of Systems Change in Organisations.
Unit 16 University of Sunderland CSEM04 ROSCO Unit 16: Post Implementation Review CSEM04: Risk and Opportunities of Systems Change in Organisations Dr.
© 2004 Managing the Information Technology Resource, Jerry N. LuftmanChapter 3 - Slide 1 Chapter 3 Strategic Alignment Maturity Managing the Information.
Lecture 13 Revision IMS Systems Analysis and Design.
Business Modelling for Internet Based Technology Intro Lecture §Recap on Unit Aims §Unit Study Plan l lectures l tutorials l Resources §Unit Assessment.
University of Sunderland COMM80 Risk Assessment of Systems ChangeUnit 9 Risk Assessment: Business Activity Maps (BAMs) COMM80: Risk Assessment of Systems.
University of Sunderland CSEM04 ROSCO Unit 13 Unit 13: Risk Methods CSEM04: Risk and Opportunities of Systems Change in Organisations Dr Lynne Humphries.
Unit 3 University of Sunderland CSEM04 ROSCO Unit 3: Risk and Opportunity Life Cycles CSEM04: Risk and Opportunities of Systems Change in Organisations.
University of Sunderland COMM80 Risk Assessment of Systems ChangeUnit 14 The RAMESES Method. COMM80: Risk Assessment of Systems Change Unit 14.
System Engineering Instructor: Dr. Jerry Gao. System Engineering Jerry Gao, Ph.D. Jan System Engineering Hierarchy - System Modeling - Information.
Overview of DMAIC A Systematic Framework for Problem Solving
The Re-engineering and Reuse of Software
Proposed MITHI Concept Paper
Release & Deployment ITIL Version 3
Corporate Governance: Beyond Compliance at a time of Recession Prof. Ashley G. Frank BA(Econ)[Magna Cum Laude], MDPA (Cum Laude], MBA, MCom [Cum Laude],
Unit 11 University of Sunderland CSEM04 ROSCO Unit 11: Risk/Benefit Assessment Using Simple Financial Models CSEM04: Risk and Opportunities of Systems.
How Halton ICT Business Services climbed the management Ziggurat Mike Horsley Lead Analyst, ICT services, Halton BC.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 18 Slide 1 Software Reuse.
UML - Development Process 1 Software Development Process Using UML (2)
MSF Requirements Envisioning Phase Planning Phase.
Developing a result-oriented Operational Plan Training
Quality Assurance. Identified Benefits that the Core Skills Programme is expected to Deliver 1.Increased efficiency in the delivery of Core Skills Training.
Unit 4 University of Sunderland CSEM04 ROSCO Unit 10: Problem-solving using TRIZ The 9 Boxes technique CSEM04: Risk and Opportunities of Systems Change.
Unit 1 University of Sunderland COMM80 Risk Assessment of Systems Change Risk Aspects and Context Covered in the Module COMM80: Risk Assessment of Systems.
Switch off your Mobiles Phones or Change Profile to Silent Mode.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
BPK Strategic Planning: Briefing for Denpasar Regional Office Leadership Team Craig Anderson Ahmed Fajarprana August 11-12, 2005.
Unit 5 University of Sunderland CSEM04 ROSCO Unit 5: Making the Case - Considering the Options CSEM04: Risk and Opportunities of Systems Change in Organisations.
Wgnho Management for Performance Department of Conservation Management for Performance Project.
Unit 4 University of Sunderland CSEM04 ROSCO Unit 4: Understanding the Problem (Concept of Ideality) CSEM04: Risk and Opportunities of Systems Change in.
© CGI Group Inc Macro Assurance Safety Effectiveness Monitoring and Metrification Mark Machin June 2014.
Unit 1 University of Sunderland CSEM04 ROSCO Unit 1: Introduction to the module & its mode of operation CSEM04: Risk and Opportunities of Systems Change.
On-line briefing for Program Directors and Staff 1.
RBM and Asset Strategy.
Supporting Industry Change Planning: Risk & Milestone Assessment Process & Tools 07/07/2014.
ISO9004:2000 Introduction workshop ISO9004:2000 Introduction Workshop Version GC.10.1-UK Oct 03  The High Performance Organisation Ltd.
Systems Analysis and Design in a Changing World, Fourth Edition
Search Engine Optimization © HiTech Institute. All rights reserved. Slide 1 What is Solution Assessment & Validation?
Technology Management FRAMEWORK. Technology management process framework Gregory (1995) has proposed that management of technology is comprised of five.
Self Assessment SELF ASSESSMENT FOR YOU Ann Pike 30 th September 2010.
University of Sunderland COMM80 Risk Assessment of Systems ChangeUnit 10 Decision Points COMM80: Risk Assessment of Systems Change Unit 10.
Key Stage 3 National Strategy Aims of session  To develop greater consistency in teacher assessment of ICT.  To develop a common understanding about.
Unit 14 University of Sunderland CSEM04 ROSCO 1 Unit 14: The Link with Project Management CSEM04: Risk and Opportunities of Systems Change in Organisations.
Unit 2 University of Sunderland COMM80 Risk Assessment of Systems Change Overview and Introduction to Module COMM80 Risk Assessment of Systems Change osiris.sunderland.ac.uk/~cs0hed/comm80.html.
Overview PRINCE Hogeschool Rotterdam. 2 Project definition  A project is a temporary organization that is created for the purpose of delivering.
Switch off your Mobiles Phones or Change Profile to Silent Mode.
UCI Large-Scale Collection of Application Usage Data to Inform Software Development David M. Hilbert David F. Redmiles Information and Computer Science.
1 Workshop “Energy Efficiency management in chemical Industry sector" Thessaloniki, Greece Use of CARE +Tools in Bulgaria energy management.
Dr. Christine Tom Griffith University School-based Assessment for and in Learning.
Taught Postgraduate Program Review
THE BUSINESS ANALYSIS PROCESS MODEL
Making Information Security Manageable with GRC
Chapter 1 (pages 4-9); Overview of SDLC
Identifying enablers & disablers to change
Presentation title Date of presentation.
Unit 5 – eProject – Starting to look at projects Unit 5
ISO management systems
Industry Engagement Program Medical Diagnostic Imaging (MDI) Equipment
Taught Postgraduate Program Review
2019 CIRS survey: Methodologies to improve decision-making documentation during medicines development and review – gap analysis Do you think your current.
Presentation transcript:

University of Sunderland CSEM04 ROSCO Unit 13 Unit 13: Supplementary Slides for the RAMESES Method CSEM04: Risk and Opportunities of Systems Change in Organisations Dr Lynne Humphries & Prof. Helen M Edwards

University of Sunderland CSEM04 ROSCO Unit 13 Overview What is RAMESES? –Background to RAMESES –Concept of “Risk” RAMESES Framework Components of RAMESES –Data Collection (Auditing) –System Specification –IT Analysis: Focused on (i) Business Process and (ii) Proposed System Business Activity Map (i) IT Usage Marked, (ii) Proposed IT Marked –Risk Gauges RG1: Change Consensus RG2 Change Context Impact of RAMESES Usage of the Toolset

University of Sunderland CSEM04 ROSCO Unit 13 What is RAMESES ? An approach that can be used by SMEs to assess risk of systems change. Why is it needed? –Do IT systems always to live up to expectation? –Do IT systems always fit how the business operates? Systems Specification is hard. Two aspects of change: Business process and IT systems.

University of Sunderland CSEM04 ROSCO Unit 13 Background to RAMESES Development via liaison with SMEs –studied them and their problems/successes in deploying new IT systems. Usage –tested and refined in a range of (mostly manufacturing) SMEs.

University of Sunderland CSEM04 ROSCO Unit 13 Concept of “Risk” Risk is not viewed as a percentage or number –Risk of systems change can only be assessed by profiling: the differences between views of business activity the gaps between perceived and actual IT usage.

University of Sunderland CSEM04 ROSCO Unit 13 RAMESES Framework

University of Sunderland CSEM04 ROSCO Unit 13 Components of RAMESES Data collection (auditing) System specification Analysis (comparisons, gaps) Risk assessment (gauges)

University of Sunderland CSEM04 ROSCO Unit 13 Data Collection (Auditing) l DC1-1: Identify Business Activities l DC1-2: Mark IT Usage on the Business Activity Model l DC1-3: Undertake IT Audit l DC1-4: Map Proposed IT System onto the Business Activity Model l DC2-1: Scope the Extent of the Detailed Data Collection l DC2-2: Identify Staff within the Business Processes l DC2-3: Task Trail the Business Processes within the Boundary l DC2-4: Audit Staff IT Profile l DC2-5: Audit Staff IT-Satisfaction

University of Sunderland CSEM04 ROSCO Unit 13 System Specification l SS-1: Identify Technical Systems Specification for Required System. l SS-2: Develop List of New IT System Features: l Infrastructure l Business/Sector Specific l Support Services l SS-3: Define Range of Potential Actions for Identified Changes

University of Sunderland CSEM04 ROSCO Unit 13 IT Analysis: Focused on Business Process

University of Sunderland CSEM04 ROSCO Unit 13 IT Analysis: Focused on Proposed System

University of Sunderland CSEM04 ROSCO Unit 13 Business Activity Map (IT Usage Marked)

University of Sunderland CSEM04 ROSCO Unit 13 Business Activity Map (Proposed IT Marked)

University of Sunderland CSEM04 ROSCO Unit 13 Risk Gauges RG1: Change Consensus – purpose: to assess agreement among the Senior Management team (SMT). RG2: Change Context –purpose: to assess the SMT’s perception of the context of the proposed changes. –purpose: to assess the SMT’s perception of past company experience.

University of Sunderland CSEM04 ROSCO Unit 13 RG1: Change Consensus Identified change: Implementation of new ERP system to replace packages currently used with an integrated solution Justification of need for change: Our system is out of date and difficult to maintain and We know we are not operating at best efficiency and wish to investigate further. Consensus among SMT: Strongly Agree: 2, Agree: 1, No view: 1, Disagree: 0

University of Sunderland CSEM04 ROSCO Unit 13 RG2 Change Context Considers –Project Timescale –Project Scope –Nature of Project –Cost of Project

University of Sunderland CSEM04 ROSCO Unit 13 RG 2: Change Consensus

University of Sunderland CSEM04 ROSCO Unit 13 RG2: SMT Consensus on Experience

University of Sunderland CSEM04 ROSCO Unit 13 Impact of RAMESES Information gathered when needed –stored for future reference Comparative analyses using defined data sets for specific purposes. Simple diagrams are used to show: –business processes –IT used within business processes –impact of new IT on business processes.

University of Sunderland CSEM04 ROSCO Unit 13 Usage of the Toolset Internal assessment - gains from SMEs' knowledge of their business. –Data collected via simple workpacks, these can be used in isolation or within the method. –Business activities can be mapped to required level of granularity. –Senior management consensus can be tested.