NATIONAL NANOFABRICATION CENTRE CLEANROOM ADMINISTRATIVE COMMITTEE MEETING TUMS Murthy 27 Mar 2012.

Slides:



Advertisements
Similar presentations
Museum Presentation Intermuseum Conservation Association.
Advertisements

MAINTENANCE MANAGEMENT Module 9
BRYAN YOUNG Preventative Maintenance Working With Safety.
Furnaces and Wet benches Savitha P. Weekly trend chart – Dry ox (5nm) Conditions: 1000 deg C – 1 min, 6 slpm oxygen flow, 20 min anneal oxide thickness.
UNIVERSITY OF ALASKA FAIRBANKS Capital Projects Update Admin Services Open Forum October 11, 2011.
KPI Familiarisation.
Clean room administrative committee Meeting TUMS Murthy Jan 29 , 2013
EG Medical Systems Maintenance BU MEDICAL SYSTEMS Service Department Scope  Service Department offers after sales service for products sold by EG Medical.
Monthly Management Report November Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
Chapter 11 Safety and Health Elsevier items and derived items © 2009, 2005 by Saunders, an imprint of Elsevier Inc.
SRC/OAS Project Environmental Performance Presenter: Julia Louise Brown.
Determining the True Root Cause(s) of Accidents and Safety Incidents Incident Investigation and Analysis.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy July 30, 2013 Clean room administrative committee.
Accident Investigation State of Florida Loss Prevention Program.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy July 1, 2014 Cleanroom administrative committee.
INDUSTRIAL & SYSTEMS ENGINEERING
This teaching material has been made freely available by the KEMRI-Wellcome Trust (Kilifi, Kenya). You can freely download, adapt, and distribute this.
General Industry Standards Personal Protective Equipment.
Management and Evaluation of Health and Safety in Workplaces.
UW Clinical Neutron Therapy Program. CNTS Engineering Staff Dave Reid Rob Emery Ruedi Risler James Kuan Eric Dorman Stefani.
Furnaces and wet benches Savitha P. Annealsys new RTP: facilities hook up over, waiting for gases hook up, what about the pump? K-space Ultra scan:
Furnaces and wet benches Savitha P. TEOS installed – problems stabilizing temperature and pressure Solved with First Nano’s help – Under optimization.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India Prabhakara Rao Jan 6, 2015 Cleanroom Admin Committee Meeting.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy Oct 28, 2014 Cleanroom Admin Committee Meeting.
NATIONAL NANOFABRICATION CENTRE CLEAN ROOM COMMITTEE MEETING TUMS Murthy 26 July 2011.
Copyright  Business & Legal Reports, Inc. Accident Investigation Blue Ridge Safety Association Safety Training Presentations.
CLINICAL ENGINEERING part(3) Dr. Dalia H. Elkamchouchi.
Hazard Identification
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India Cleanroom Admin Committee Meeting Prabhakara Rao April 28,
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India Arun Kumar Menon Oct 7, 2014 Cleanroom Admin Committee Meeting.
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
EXISTED SITUATION OF HOSPITAL 1.Feasability of the hospital is necessary. 2.Construction Completed as informed. 3.Architectural Detay Drawings Completed.
Wastewater Infrastructure Security Workshop April 15, 2002 Denver, Colorado.
Energy Efficiency in Industrial and Commercial Facilities 2003 Energy and Environmental Conference September 16, 2003.
Furnaces and wet benches - update Savitha P. Current status of old equipments One bench could work: Exhaust problem need to be solved Wet oxidation and.
Monthly Management Report january Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
Monthly Management Report Submitted By Facility Management Team
Accident Investigation. Accident Investigation Goals Preparing the investigation team Conducting the investigation Quiz.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy Dec 2, 2013 Cleanroom administrative committee.
Dry Etch and Thin films & Process Integration April 28th, 2015 NNfC monthly admin committee meeting.
Monthly Management Report December Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
Presentation on Preventive Maintenance
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy 28 May 2014 Cleanroom administrative committee.
Colorado Rural Electric Association 2009 Loss Control Conference NEAR MISSES REPORT/LEARN/USE Presented By: Eldon Humphers, CLCP-CUSA July 14, 2009.
Chapter 3 Prerequisite Programs and Preliminary Steps.
1 Drivers for Building Life Cycle Integrations Jim Sinopoli.
Trial & Prove The RouteMilestones 1-4 SM ‘Buy-in’ W/S 4 Day Launch Workshop/ Initial Training POLICY DEVELOPMENT & DEPLOYMENT Pilot Projects, Plant Clear.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy Aug 27, 2013 Clean room administrative committee.
CHAPTER#17 ENGINEERING MAINTENANCE MANAGEMENT Lecture No. 16Course: Engineering Management MED DEPARTMENT, U.E.T TAXILA COURSE INSTRUCTOR : PROF. DR. SHAHAB.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy Sept 25, 2013 Clean room administrative committee.
© Module 4—Hazard Prevention and Control Safety Management Worksite Analysis Management Commitment and Employee Involvement Hazard Prevention and.
Monthly Management Report March By Facility management Team National nanofabrication centre Indian Institute of Science Bangalore.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy Aug 26, 2014 Cleanroom Admin Committee Meeting.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy 25 Feb 2014 Cleanroom administrative committee.
Basic Sustainability ConceptsSlide 1 Basic Sustainability Concepts Asia Regional Technical Workshop on Megaports Initiative Bangkok, Thailand May 12-15,
Modern Maintenance. Management
TOTAL PRODUCTIVE MAINTENANCE CONCEPTS 29 TH JANUARY 2011 RM PERIYANNAN MANAGER(MECHANICAL) SERVICES MECHANICAL.
Disaster Preparedness Are you prepared?. Effective Disaster Plans  Your plan should outline the basic preparedness steps needed to handle the anticipated.
© BLR ® —Business & Legal Resources 1501 Accident Investigation.
BY AMAR P. NARKHEDE MAINTENANCE PLANNING. PLANNED PROGRAMME FOR MAINTENANCE Phase I 1. Prepare a list of all machines and equipments to be covered and.
1 CMBG 2009 Planning for Obsolescence June 27, 2009 John Parler South Carolina Electric & Gas.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Work Place Committees and Health and Safety Representatives Training Module 5 – INPECTIONS, WORK PLACE HAZARDS, TASK HAZARD ANALYSIS.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy Jan 8, 2013 Clean room administrative committee.
Maintenance Scheduling
An Integrated Risk Management & Safety Program: IRMSP
HOW BEST CAN WE MANAGE MEDICAL EQUIPMENT By Khalif D.Mohamud BMET-GCRH
New Reactor Projects as Training Opportunities
Presentation transcript:

NATIONAL NANOFABRICATION CENTRE CLEANROOM ADMINISTRATIVE COMMITTEE MEETING TUMS Murthy 27 Mar 2012

TUMS MurthyCleanroom Admin Committee Meeting31 Jan 2012 Agenda  Infrastructure installation and commissioning  Utilities  Fab Equipment  Operations  Operation procedures and protocols  User Training  Preventive and Breakdown Maintenance ; Planning for Consumables, spares etc  Manpower

TUMS MurthyCleanroom Admin Committee Meeting31 Jan 2012 Utilities  All the utilities have been installed and commissioned  Following utilities did not meet the specifications and need modification  Dry exhaust and dry scrubber  BMS  Systems that have not been tested  Wet Scrubber  Humidifier  Sprinklers

TUMS MurthyCleanroom Admin Committee Meeting31 Jan 2012 Utilities contd.  Utilities that need upgrading or enhancement  Heat and smoke detector system. System to be upgraded to an addressable system  Biometric access for staircase to Mezzanine floor  Walkie-talkies for communication among fab and utilities staff  Utilities under installation  Borewell water treatment plant

TUMS MurthyCleanroom Admin Committee Meeting31 Jan 2012 Nanofab Tools  Litho  All tools installed and commissioned E-line vibration isolation to be installed  Plasma processing  All tools installed and commissioned  Wet procesing  3 out of 6 benches have been installed Replacement for broken Quartz baths received. Waiting for installation engineer from Felcon to arrive to complete installation

TUMS MurthyCleanroom Admin Committee Meeting31 Jan 2012 Nanofab Tools  Films  One sputter tool working  Waiting replacement spares and Tecport Engineer’s schedule for commissioning one more sputtering system and Ebeam evap system  Furnaces  LPCVD 3 tubes working  Problems with other tubes and the wet scrubber to be resolved

TUMS MurthyCleanroom Admin Committee Meeting31 Jan 2012 Operations  Operation procedures and protocols  Safety related  Equipment operation procedures  User Training  Training schedules under preparation  Utilities maintenance the key to operations  Most critical systems out of manufacturer warranty  AMC with various manufacturers or with Ellipsiz

TUMS MurthyCleanroom Admin Committee Meeting31 Jan 2012 Operations contd.  Manpower recruitment and training is a priority  For second shift staffing  For Nano Fab Equipment and process maintenance  Fine tuning, enhancement and preventive maintenance of utilities  Preliminary quote obtained for Employee Medical and Accident Group Insurance

TUMS MurthyCleanroom Admin Committee Meeting31 Jan 2012 Other Issues  Electrical Distribution continues to be a worry with several unexplained incidents  Latest is the burnt contactors in the Capacitance Bank for power factor correction  Root cause of earlier incidents of MCB tripping (ref : POU 610 scrubber ) and Noise from UPS could not be found

TUMS MurthyCleanroom Admin Committee Meeting31 Jan 2012 Capacitance Bank damage Insulation Burnt