Great Bay Municipal Coalition New Hampshire Water Pollution Control Association June 13, 2013 Dean Peschel Peschel Consulting

Slides:



Advertisements
Similar presentations
creating a sustainable world The Chesapeake Bay TMDL A Policy Model for Nutrient Pollution Reductions James Noonan October.
Advertisements

Use of Mechanistic Modeling to Enhance Derivation of Great Bay TN Criteria and Inform Restoration Strategy Thomas W. Gallagher,
Gulf Restoration Network Decision. Nutrients Nitrogen (N) Phosphorus (P) Sources include: NPS: fertilizer/manure runoff, septic tank overflow Point sources:
Gulf Hypoxia and its Impact on Ohio Municipalities.
MS4 Stormwater Permit Program and Great Bay. Brief Overview – EPA’s Stormwater Management Program Clean Water Act – NPDES Stormwater amendments.
Narragansett Bay Estuary Program Narragansett Bay CCMP  Original done 1992  Stakedholder-developed goals, objectives, actions  Many key actions implemented.
Clean Water Act Integrated Planning Framework Sewer Smart Summit October 23, 2012.
A Collaborative Approach to Meeting Water Quality Goals : Tampa Bay, Florida Holly Greening, Tampa Bay Estuary Program Michael Connors, City of St. Petersburg.
Current Planning for 2017 Mid-Point Assessment Gary Shenk COG 10/4/2012 presentation credit to Katherine Antos and the WQGIT ad hoc planning team.
Chesapeake Bay Restoration An EPA Perspective Jeff Corbin Senior Advisor to the Administrator U.S. EPA.
Chesapeake Bay and New York State Water Quality and the Potential for Future Regulations Presented by the Upper Susquehanna Coalition.
Using multiple data streams to develop eelgrass-based nutrient criteria for New Hampshire’s Great Bay Estuary J. Ru Morrison (NERACOOS), Paul Currier (NHDES),
Using multiple data streams to develop eelgrass-based nutrient criteria for New Hampshire’s Great Bay Estuary J. Ru Morrison (NERACOOS), Paul Currier (NHDES),
Mattabesset River Watershed Management Plan Julie Foley.
Nutrient Criteria Development for New Hampshire’s Estuaries P. Trowbridge, P.E. December 7, 2007.
Laboratory Analysis: Samples were analyzed for: Dissolved Organic Nitrogen (DON) Dissolved Inorganic Nitrogen (NH 4 and NO 3 ) Total Dissolved Nitrogen.
Impaired and TMDL Waterbody Listings Impacts on DoD Facilities Bill Melville, Regional TMDL Coordinator
Successful Watershed Planning Forrest Bell, FB Environmental Associates.
Department of the Environment Overview of Water Quality Data Used by MDE and Water Quality Parameters Timothy Fox MDE, Science Service Administration Wednesday.
Update on Chesapeake Bay Issues Presentation to the Chesapeake Bay and Water Resources Policy Committee July 17, 2009 Ted Graham & Steve Bieber COG Department.
Region III Activities to Implement National Vision to Improve Water Quality Monitoring National Water Quality Monitoring Council August 20, 2003.
Currents of Change Workshop Currents of Change Environmental Status & Trends of the Narragansett Bay Region May 1, 2009.
YOUR SCHOOL AND YOUR WATERSHED LORNA ROSENBERG- US EPA MID-ATLANTIC OCT 1-2, 2014 CHESAPEAKE BAY SCHOOLS WORKSHOP – SHEPHERDSTOWN, WVA.
1 “ Understanding the Local Role of Improving Water Quality” Virginia Association of Counties November 14, 2011 Virginia Association of Counties November.
DC Draft Phase II Watershed Implementation Plan Stakeholder Meeting March 1, 2012 Metropolitan Washington Council Of Governments Hamid Karimi Deputy Director.
WATERSHED PERMITTING IN NORTH CAROLINA NPDES PERMIT NCC BECAME EFFECTIVE JAN 1, 2003 NEUSE RIVER COMPLIANCE ASSOCIATION MORRIS V. BROOKHART, P.E.
Proposed Adaptive Management Plan Presented by the Great Bay Municipal Coalition Dover, Exeter, Newmarket, Portsmouth, and Rochester Dean Peschel
Department of the Environment Maryland’s Nutrient Trading Program Phase I- Trading between point sources and trading involving connecting on-site septic.
Chesapeake Bay Policy Committee Meeting Bay Program Water Quality Goals: Focus on Funding Presented to COG Board of Directors September 10, 2003.
Amy Walkenbach Illinois EPA 217/
Presentation to the Chesapeake Bay and Water Resources Policy Committee July 30, 2010.
Gulf of Mexico Hypoxia and Mississippi River Basin Nutrient Losses Herb Buxton, USGSRob Magnien, NOAA Co-Chairs, Monitoring, Modeling, and Research Workgroup,
Restoring VA Waters the TMDL Way Jeff Corbin Senior Advisor to the Regional Administrator U.S. EPA Region 3.
Tampa Bay Nitrogen Management Consortium Update Holly Greening Tampa Bay Estuary Program March 2014.
Suzanne Trevena EPA Water Protection Division Chair Milestone Workgroup December 4,
Orange County Board of County Commissioners Update on USEPA Rulemaking for Numeric Nutrient Criteria Utilities Department January 26, 2010 Utilities Department.
2004 Tributary Strategies: Assessment of Implementation Options Steve Bieber Water Resources Program Presented at: COG Chesapeake Bay Policy Committee.
John Kennedy VA DEQ - Ches. Bay Program Mgr Tributary Strategies: Point Source Nutrient Controls Potomac Watershed.
Wisconsin’s Nutrient Reduction Strategy for Water Quality Wisconsin Crop Management Conference January 16, 2014 Ken Genskow, PhD Associate Professor, Department.
Oregon Department of Transportation Stormwater Management Initiative: Meeting New Challenges Presented by: William Fletcher, ODOT February 5, 2008.
KWWOA Annual Conference April 2014 Development of a Kentucky Nutrient Strategy Paulette Akers Kentucky Division of Water Frankfort, KY.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
Introduction to Water Quality Trading National Forum On Water Quality Trading July 22-23, 2003 Chicago, Illinois.
Procedures to Implement the Texas Surface Water Quality Standards
Stormwater Management William Taylor New Hampshire Wastewater Control Association June 13, 2013.
Suwannee-Satilla Drainage Basin: Flood Control Issues and Requested Action Suwannee-Satilla Regional Water Planning Council Douglas, GA December 8, 2010.
High Rock Lake Nutrient Modeling Update Pam Behm - NC Division of Water Resources Environmental Management Commission Water Quality Committee Information.
Request approval to proceed to EMC with 2014 Tar-Pamlico River Basin Plan.
BIOGEOCHEMICAL CYCLING EXAMPLES Unit 6.2. BIOGEOCHEMICAL CYCLING EXAMPLES 1) Nutrient Pollution 2) Agricultural Importance 3) CZ Function and Dynamics.
It’s all about the Bay – research, education, and outreach in Buzzards Bay Rachel W. Jakuba, Science Director Meghan Gahm, Outdoor Educator WHSTEP General.
Northern Virginia Regional Commission MS4 Meeting March 17, 2011 Virginia Phase II Watershed Implementation Plan (WIP) Approach.
1975 EPA Study  Extensive construction in 1950s -1970s  Poor canal flushing results in “stagnation, putrification, and excessive nutrient enrichment.
Nutrients and the Next Generation of Conservation Presented by: Tom Porta, P.E. Deputy Administrator Nevada Division of Environmental Protection President,
The Chesapeake Bay: How is it Doing? An Overview of The Chesapeake Bay Watershed.
Improving Local Water Quality in Pennsylvania and Restoring the Chesapeake Bay.
New York’s Chesapeake Bay WIP
Southeast Watershed Alliance
Sustainable Water Infrastructure through Innovative Financing
GREAT BAY and NEW HAMPSHIRE WATER QUALITY STANDARDS
It’s The Final Countdown To The Mid-point Assessment:
Land Use Challenges In Maryland Today
Illinois Nutrient Loss Reduction Strategy - NLRS
Building a Phase III WIP for Wastewater, Stormwater & Septic Systems
Mike Bira EPA Region 6 NPS Program
Developing a Water Quality Trading Framework
Water Quality Trading Advisory Committee MDA Headquarters
Water Quality Trading Advisory Committee MDA Headquarters
Washington State Infrastructure Financing
Section 319 Grant Program – writing a proposal that can be funded
Upper Clark Fork Watershed Restoration and TMDLs
Presentation transcript:

Great Bay Municipal Coalition New Hampshire Water Pollution Control Association June 13, 2013 Dean Peschel Peschel Consulting

Dover, Exeter, Newmarket, Portsmouth, and Rochester Protect Estuary resources Understand the science Invest in solutions that address cause of resource degradation to the extent necessary Great Bay Municipal Coalition

History of Nitrogen Issue NH Estuary Program TAC NH Estuary Program TAC Concluded N not cause eelgrass loss Concluded N not cause eelgrass loss 2009 NHDES Numeric Nutrient Criteria 2009 NHDES Numeric Nutrient Criteria Concluded N was the cause of eelgrass loss Concluded N was the cause of eelgrass loss Established a 0.3 mg/l TN water column transparency based WQ standard to protect eelgrass Established a 0.3 mg/l TN water column transparency based WQ standard to protect eelgrass 2009 NHDES declared Great Bay Impaired 2009 NHDES declared Great Bay Impaired 2011 EPA issues draft NPDES permits 2011 EPA issues draft NPDES permits Limits of technology (3 mg/l) Limits of technology (3 mg/l)

Conceptual Model Excess Nitrogen stimulates phytoplankton growth (chl-a) Excess phytoplankton in the water reduces light transparency Reduced light transparency impacts eelgrass

Contributions to Kd (PAR) measured at the Great Bay Buoy (From Morrison et al, 2008) Kd = xCDOM xChla xNAP

Upper Piscataqua River Measured Chla and Kd ( )

Conclusions Reducing nitrogen levels in the estuary will not materially improve water column transparency Reducing nitrogen levels in the estuary will not materially improve water column transparency Proposed 0.3 mg/l TN transparency based WQ standard is unjustified Proposed 0.3 mg/l TN transparency based WQ standard is unjustified

Why All The Fuss? Times have changed Funding of WWTP upgrades 100% local users Stakes are high * Coalition Wastewater plant upgrade costs * Coalition Wastewater plant upgrade costs 3 mg/l $588,000,000 over 20 years 3 mg/l $588,000,000 over 20 years 8 mg/l $364,000,000 over 20 years 8 mg/l $364,000,000 over 20 years Delta $224,000,000 over 20 years Delta $224,000,000 over 20 years * Applied Economic Resources Report 2011 * Applied Economic Resources Report 2011

WWTP estimated costs to reduce N Dover 2.8 mgd 96 tons N/yr Dover 2.8 mgd 96 tons N/yr Limit (mg/l) % red. Tons red. 20yr Cost Cost/ton Limit (mg/l) % red. Tons red. 20yr Cost Cost/ton 8 (6) 73% 70 $36.4 mil $26K 8 (6) 73% 70 $36.4 mil $26K 3 86% 83 $94.9 mil 3 86% 83 $94.9 mil 13% 13 $58.5 mil $225K 13% 13 $58.5 mil $225K

Nitrogen Sources Point Sources (WWTP's) 25% - 30% Non Point Sources 65% - 70% Septic Systems Stormwater runoff Fertilizers Agriculture Landscape areas

Plan that makes sense Best use of available resources Addresses point and non point sources Monitors progress and adapts Coalition Adaptive Management proposal (Oct.-11) Utilizes recommendations from the Piscataqua River Estuary Partnership's CCMP

Adaptive Management Proposal Coalition WWTP's discharging to the estuary 8 mg/l N permit limits; Operational within 5 yrs Invest in WQ and Habitat monitoring & research Invest in habitat restoration projects Stormwater improvements Septic system contribution reduction strategy Fertilizer use controls Stream and wetland buffers Support land conservation

Benefits of Adaptive Management Proposal Provides significant nitrogen reduction Addresses point and non point sources Funds needed monitoring, research, and restoration Avoids legal appeals Wastes financial resources Delays implementation of reductions

Current Coalition Efforts NH Legislative effort Require NHDES to conduct independent peer review of 2009 Nutrient Criteria Initiate rule making process on appropriate WQ standard Engage all watershed communities on issue New Hampshire and Maine

Recent Developments Newmarket and Exeter have final permits 3 mg/l TN permit limit Extended schedule Required to develop plan to reduce nonpoint Both communities have to build new treatment plants Dover has a draft permit (3mg/l TN) Rochester and Portsmouth expect draft permits in near future 2012 State of Estuaries Report

2012 PREP State of Estuaries Report 2012 SOE Report confirms Algae (phytoplankton) blooms have not increased in more than 30 years Macroalgae is an emerging problem that requires additional research Effect of nitrogen loads on system not fully determined and requires more research Eelgrass in Little Bay have rebounded to highest level in decades Excessive rainfall during resulted in a temporary peak in nitrogen levels

Current Coalition Efforts State law suit NHDES RSA rule making Federal law suit EPA Appeal of Newmarket NPDES permit NH Legislative effort Require NHDES to conduct independent peer review of 2009 Nutrient Criteria Initiate rule making process on appropriate WQ standard

Current Coalition Efforts Preparing for peer review of 2009 Nutrient Criteria Communities partnering with PREP to conduct eelgrass mapping 2013 Completing development of a hydrodynamic model of the estuary

Draft NH Stormwater Permit 2003 MS4 permit < 50 pages Flexibility 2012 draft MS4 permit >200 pages Prescriptive Overwhelming – Cost – Municipal Resources

NH Stormwater Coalition Opportunity 60 MS4 NH Communities Represent >750,000 NH residents Challenges Large and Small communities Unfamiliar working together Concerns over fairness and approaches

Coalition Building Funding formula has changed Local responsibility – Provide funding – Insure resources are spend wisely Local and Regional Coalitions Political support – Federal – State Financial cost sharing – Legal expertise – Technical expertise