1IndustrialEmissionsDirective. 2 The European Parliament is discussing the Industrial Emissions Directive as adopted by the Council for the second reading.

Slides:



Advertisements
Similar presentations
Best Available Techniques (BAT)
Advertisements

© European Communities, 2007 Purpose The European Integrated Pollution Prevention and Control Bureau (European IPPC Bureau) of the JRC/IPTS was set up.
EU FORMAL REGULATION – TYPES OF STANDARDS ENVIRONMENTAL QUALITY OBJECTIVES ENVIRONMENTAL QUALITY STANDARDS.
EU FORMAL REGULATION – TYPES of STANDARD MINIMUM EMISSION STANDARD (sometimes known as LIMIT VALUES) UNIFORM EMISSION STANDARD.
Pagina 1 de 3 CEPSA Química QUIMICA Palos de la Frontera Jul 12 th, 2012 CEPSA QUIMICA PALOS DE LA FRONTERA IPPC DEVELOPMENT.
The Industrial Emissions Directive (IED) 2010/75/EU
IPPC and Industry By Dr. Ken Macken Dublin Regional Licensing Manager.
Waste minimization, water management and energy efficiency techniques in the Soft Drinks Industry PROJECT COORDINATOR: Mr. Patrick J. Tanck, M.Sc, Foundation.
Industrial Pollution Control and Risk Management: IPPC Neil Emmott Environment Directorate-General 7 April 2006.
Consultant: CMDC Joint Venture Application of BAT in IPPC/EIA Experience in EU Member States Per Ponsaing COWI.
Main Developments in EU Environment Policy. 1.The 7 th Environmental Action Plan 2.Waste Electrical and Electronic Equipment Updated Directive 3.Timber.
Substantive environmental provisions Prof. Gyula Bándi.
The IPPC Recast. New environmental requirements for explosives production sites.
Grupowa Oczyszczalnia Ścieków Łódzkiej Aglomeracji Miejskiej Fot: U. Czapla Practical aspects of compliance with the Integrated Permit requirements based.
1 Towards an improved policy on industrial emissions - Impacts on the waste management industry - Marianne Wenning European Commission, DG ENV.C.4 FEAD.
European Commission, DG Environment Unit B.1: Water, Marine and Soil EU Substitution Conference - Hamburg, 13/14 June 2002 Slide 1 EU Conference on Substitution.
Environmental Permitting Regulations Tom Fowler – Environment Officer
The European IPPC Bureau Institute for Prospective Technological Studies (IPTS) Seville, Spain Internet E.mail : Don.
The Marine Strategy Framework Directive 17th March 2010, Newcastle North Sea Stakeholders Conference Leo de Vrees European Commission (DG Environment,
1 Inspection of LCPs: System for Inspection. ECENA Training Workshop Bristol, March 2008.
BAT as a main tool for minimisation of the negative impact of industrial activities Aivi Sissa Tallinn – Estonia 27 – 28 March 2008.
The Industrial Emissions Directive (IED) 2010/75/EU Gabriella Gerzsenyi & Menno Verheij European Commission, DG Environment Industrial Emissions Unit 03.
Acquis communautaire in Chapter 27 – Environment
The Sevilla process for supporting the implementation of the IPPC Directive Michael Parth Tallinn – Estonia 27 – 28 March 2008.
Egyptian and Italian Cooperation Programme on Environment Best Available Techniques (BAT) Mr. Giorgio Grimaldi Mr. Giorgio de Benedetti 1 Workshop: “Best.
PRTR-online survey. Questions – Items Question 3 – Item 2.
Current state on Harmonisation and Implementation/Enforcement of Environmental Legislation - Industrial Pollution Control in SLOVENIA Barbara Bernard Ministry.
IPPC Directive state of play and future developements
Croatian Report on new Environmental Protection Law Josipa Blažević-Perušić, B.Sc. Arch. State Secretary Anita Pokrovac-Patekar, B.Sc. Pharm. Senior Environmental.
The IPPC Directive and its implementation Alexandre Paquot European Commission Environment Directorate-General Phare Capacity.
Ministry of Waters and Environmental Protection, ROMANIA 1 BERCEN 1 st Exchange program – November 2002 Croatia PROBLEMS AND SOLUTIONS IN COOPERATION.
EU Legislation in the field of environment – key developments in 2007 and rd ECENA Plenary Meeting 18 September 2008.
1 Permitting of industrial facilities in Croatia.
The Industrial Emissions Directive (IED) 2010/75/EU Gabriella Gerzsenyi & Menno Verheij European Commission, DG Environment Industrial Emissions Unit 03.
Strategic Priorities of the NWE INTERREG IVB Programme Harry Knottley, UK representative in the International Working Party Lille, 5th March 2007.
SUSTAINABLE MARKET SOLUTIONS FOR GLOBAL ENVIRONMENTAL PROBLEMS Vested Interests in the Political Economy SUSTRA Workshop, January 2004 Mike Wriglesworth.
The European IPPC Bureau Institute for Prospective Technological Studies (IPTS) Seville, Spain Internet E.mail : Don.
Recommendation 2001/331/EC: Review and relation to sectoral inspection requirements Miroslav Angelov European Commission DG Environment, Unit A 1 Enforcement,
IPPC vs Emissions Trading Lesley James Friends of the Earth (England, Wales & N.Ireland) and the European Environmental Bureau.
International Network Network of Basin OrganizationsInternationalOffice for Water PARIS Paper of Mr. Jean-François DONZIER Paper of Mr. Jean-François DONZIER.
1 Review of the Integrated Pollution Prevention and Control (IPPC) and National Emission Ceilings (NEC) Directives Marianne Wenning DG ENV, Head of Unit,
FEAD ANNUAL CONFERENCE 2008 Future Challenges for the Waste Management Industry Paris, 19 September 2008.
3rd BERCEN Exchange Programme, Prague WASTE CONDITIONS IN ENVIRONMENTAL PERMITS Mrs. Marianne Lindström, Finnish Environmental Institute,
Assessment of options to streamline legislation on industrial emissions IPPC Review Stakeholder Hearing 4 May 2007 Caspar Corden Entec UK Limited.
REVISION OF THE IPPC DIRECTIVE  DIRECTIVE ON INDUSTRIAL EMISSIONS.
Consultant: CMDC Joint Venture 1 Multi-Country Conference Prague 7-9 June 2004 Selected challenges in IPPC permitting - experience from CEE Vibeke Burchard.
Responsible Care ‘you can’t live without us’ Responsible Care Environmental legislation in Europe- is it a barrier to the Circular Economy? PRESENTATION.
Fitness Check of environmental monitoring and reporting MIG-P meeting 4 Dec 2015 Joachim D'Eugenio Steve White DG Environment European Commission.
1 Short overview of the implementation of IPPC, LCP, Seveso II, Waste Landfill and Incineration directives Short overview of the implementation of IPPC,
CROATIA Country Report IPPC Directive: implementation, problems, constraints, open questions,… Anita Pokrovac Patekar, B. Sc. Pharm. Ministry of Environmental.
Large Combustion Plants Ex-post assessment of the LCP Directive Initial ex-ante evaluation of the IED – Chapter III and BAT Daniel Martin-Montalvo Alvarez.
The current legal situation
Water quality and water pollution – data for old and new policy questions 5th World Water Forum Session Data integration and dissemination: From.
1 Review of the IPPC Directive and related legislation Second Meeting Of Working Group E On Priority Substances 17 October 2007 Filip FRANCOIS – DG ENV.
IPPC recast and air emissions Gergely Simon Lisbon.
1 Overview of the Proposal for a Directive on industrial emissions (IPPC) Keir McAndrew - European Commission, DG ENV.C.4 - Industrial Emissions, ozone.
Main flexibility tools for the adoption of high emission standards for LCPs set in the new Industrial Emissions Directive Gerard Lipinski Coordinator of.
Ministry for Ecology, Energy, Sustainable Development and Sea in charge of Green Technologies and Climate Negotiations
Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 1 The IPPC Directive Introduction to the philosophy Rob Kramers.
IPPC A general overview Nigel Barraclough Policy Adviser Industrial Pollution Control Branch Air and Environment Quality Division. Taiwanese Environmental.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 27 – Environment Bilateral screening:
Introduction to the philosophy
BAT - BREF Their scope Rob Kramers Senior advisor InfoMil.
First position of the Belgian industry about the
Expert Advisory Forum on priority substances
IPPC Review Stakeholder Hearing
Reduction of total releases from unintentional production of POPs
Towards an improved policy on industrial emissions Third Meeting Of Working Group E On Priority Substances 3 March 2008.
Industrial Emissions Directive Targeted stakeholder survey
WFD CIS Working Group Meeting Brussels, 4/4/2019
Presentation transcript:

1IndustrialEmissionsDirective

2 The European Parliament is discussing the Industrial Emissions Directive as adopted by the Council for the second reading. This Industrial Emissions Directive (IED) aims to protect all sorts of environments from industrial emissions, in a global framework of permits. In an optimized approach, with a view to sustainable environmental protection, the IED should take into account …the different local conditions (climate, topography…) and different technical characteristics of the plants and processes…IndustrialEmissionsDirective

3 EU history of industrial emissions regulation The London smog in 1952 resulted in the Clean Air Act; the start of environmental legislation. Some milestones before the IED … The EU started legislating 30 years ago : 1975: Waste Framework Directive 1978, 1982, 1992: Titanium Dioxide Directives 1988: Large Combustion Plant Directive 1999: Solvent Emissions Directive 2000: Waste Incineration Directive That was a sectoral approach until…IndustrialEmissionsDirective

4 … the launch of the Integrated Pollution Prevention and Control Directive (IPPC) in 1996 The purpose was to regulate industrial emissions so as to ensure a high level of protection of the environment as a whole emissions to air, water, land generation of wastes use of raw materials energy efficiency noise & vibrations prevention of accidentsIndustrialEmissionsDirective

5 What is the basis of the 1996 IPPC Directive? There are four key strong principles: 1.An integrated and combined approach 2.The use of Best Available Techniques (BAT), 3.The use of specific solutions adapted to the different environments and industrial plants 4.The requirement of public consultation during permit process. Deadline for implementation was October 2007…IndustrialEmissionsDirective

6 What are the key elements of the IPPC directive? 1) BREFs - The ‘Seville Process’ produces the BREFs (Best available technique REFerence documents) for each industrial sector. The objective is to inform the relevant decision-makers about the Best Available Technique. They are produced by the “Seville Process” involving stakeholders. 2) The BAT (Best Available Techniques ) found in the BREFs are the most effective techniques that are technically and economically available to industry in order to achieve a high general level protection of the environment.IndustrialEmissionsDirective

7 What are the key elements in the IPPC directive? 3) BATAELs (BAT Associated Emission Levels) are indicative emission levels (found in the BREFs) and relate to the efficiency of the techniques. They are to be used as a reference for establishing specific-site Emission Limit Values. They do not take account of process fluctuations or specific circumstances. 4) ELVs (Emission Limit Values) are safeguards to prevent/minimise environmental impact at the site location. They are not set in the BREF documents. They are legally binding.IndustrialEmissionsDirective

8 What are the key elements in the IPPC Directive? 5) “ Techniques “ include both the technology used and the way in which the installation is designed built, maintained, quoted and decommissionned 6) “ Available “ techniques: those developed on a sacle which allows implementation in the relevant industrial sector under economically and technically viable conditions, taking into consideration the costs and advantages, whether or not the techniques are used or produced inside the State in question, as long as they are accessible to the operator. 7) “ Best “ means most effective in achieving a high general level of protection for the environment as a wholeIndustrialEmissionsDirective

9 What is the basis of the 1996 IPPC directive? There is one underlying approach: Both the industrial operator and the regulator must take an integrated overall look at the installations and all their environmental impacts, using the European BREF (technical reference document) as a guideline, when taking decisions on how the installations should be operated. Problem: an uneven implementation across States…IndustrialEmissionsDirective

10 1 st reading vote European Parliament 2009 Amendment in ENVI Vote in ENVI ENVI (responsible) ALDE: Mr Holger Krahmer (rapporteur) EPP-DE: Mrs Elisabetta Gardini PSE: Mrs Asa Westlund GUE: Mrs Sabine Wils Greens: Mrs Michèle Rivasi & Bas Eickhout ECR: Martin Callanan End of March 2010 May 2010 A reshaping process has been launched … 2 nd reading July 2010IndustrialEmissionsDirective

11 What were the initial ideas of the Commission? A motive to simplify and strengthen drove the IED draft: 1) A more stringent approach with a view to achieving greater consistency in level of implementation. 2) Tighter Europe-wide Emission Limit Values for large combustion plants and for titanium dioxide industries 3) An initial quantitative soil assessment with remediation to the original state when the permit ceases. 4) A combination of 6 existing directives, including the IPPC directive in a single text to simplify environmental permitting. In fact, some key elements of this IED approach, an over-simplification, may lead to « a one size fits all strategy », which does not always facilitate an adapted environmental protection IndustrialEmissionsDirective

12 A motive of better efficiency in the IED draft: * The IED directive aims to disseminate best available technologies for the highest level of emission reductions ** The directive facilitates requirements beyond EU agreed standards ! (art 14.4) *** The directive emphasizes on quantification as trigger for remediation as it is seen as a simple criterion (art 22.2) **** Soil and ground water monitoring always focus on regular surveillance and periodic samplings (art 14.1) In fact, the efficiency aim should be backed up by a more sustainable strategy …which should keep on board environmental, social and economic impacts. What were the initial ideas of the Commission?IndustrialEmissionsDirective

13 emission What is the mechanism of the proposals? number of units If you compare the average emissions of a unit with those of other units of the same kind … … you can define Best Available Techniques (BAT) for this process and their related average emission levels (BATAELs)IndustrialEmissionsDirective

14 emission What is the mechanism of the proposals? time To achieve BATAEL on the average, set Emission Limit Values (ELVs) for normal operation accordinglyIndustrialEmissionsDirective

15 What is our position ? The 1st reading Council common position has improved the IED draft The “One size fits all approach” is not an absolute guarantee to achieve highest environmental protection and consistent implementation of an integrated approach. That is why the provisions allowing useful and justified local adaptation for more sustainable environmental protection must be better secured.IndustrialEmissionsDirective

16 What is our position ? A sustainable IED needs to be in line with concrete specific needs: Different emissions behave differently in different locations: => competent authorities must be authorized to grant justified flexibility. (support Art 15.4) Environmental protection needs a cost benefit analysis on the reductions and side effects : =>going beyond Best Available Techniques by competent authorities must be fully justified (amend art 14.4); => remediation measures must be based on technical and economic feasibility (amend art 22.3)IndustrialEmissionsDirective

17 What is our position ? A pragmatic IED needs to be in line with concrete specific needs: The BATAEL must be based on representative datasets from all over the EU (support Art 13) Combustion installations on chemical sites have a specific character as they burn specific fuels:  New Emission Limit Values (ELV) should be adapted to chemical plants burning off gases and residues (support Art 30-9).IndustrialEmissionsDirective

18 What is our position ? A sustainable IED should build on the experience of stakeholders The opinion of the relevant stakeholders must be taken into account when adopting decisions on BAT: => the conclusions of the Seville process must be safeguarded during the comitology. (support Art 13.4) => Need for a stakeholder consultation when setting Emissions Limit Values in case of a missing BREF (amend Art 14.6)IndustrialEmissionsDirective

19 What is our position ? A sustainable IED needs to give certainty to investors Investment cycles executed and planned with a view to compliance with the LCP Directive must be recognised: => Transitional national plans must help progressively planned compliance with ELVs (support Art 32) New investors on existing sites cannot take unforseeable legal and financial risks: => a risk-based approach must be promoted to analyse the potential contamination of soil (amend Art 22.2)IndustrialEmissionsDirective

20 In short - Permit conditions that would take account of site-specific circumstances and considering technical & economic feasibility -European requirements that would be set only where appropriate. - BREFs and BATAELs that would be used as a basis for setting ELVs if supported by the appropriate experience of stakeholders - proportionate and risk-based soil & ground water protection measures Sustainable environmental protection would be ensured with:IndustrialEmissionsDirective

21 A justified level of flexibility can take on board environmental and economic considerations…… allowing society and environment to prosper in a sustainable way for the benefit of allIndustrialEmissionsDirective