1 Content 1.Summary of the Korea High Speed Railway Project 2.EIA System in Korea 3.Limits of Present EIA System 4.Tasks for the Betterment Content 1.Summary.

Slides:



Advertisements
Similar presentations
The Effectiveness of Social Variables in Social Impact Assessment: Korean Cases Juchul Jung Jaeyoung Lim Korea Environment Institute.
Advertisements

Railway Grade Separations Issues. Railway Grade Separations 1.Introduction Qualifications/experience to undertake bridge planning for railway grade separations:
Detail actions necessary to implement the interim housing mission in the post-disaster environment Identify command and control structures at all levels.
Chris Dandurand, P.Eng Kiewit Infrastructure Group Large Hydro Perspective on the Permitting Process & Environmental Approvals.
National Impact Assessment Programme (NIAP) Public Participation in EIA – How Can it Help in Resolving Conflict ? Asadullah Faiz, Director General, Pakistan.
Part III Solid Waste Engineering
Ohio’s Solid Waste and C&DD Program Annual Meeting May 9, 2013 Ohio’s Composting Program Barry Chapman and Jen Hagar.
Ⅱ Ⅱ Ⅲ Ⅲ Ⅳ Ⅳ Ⅰ Ⅰ Ⅰ Ⅰ To increase Efficiency for EIA implementation. 1.1 General purpose of Post-Project management To meet within the levels.
1 Activity 3 - Definition of sustainable developmentDefinition of sustainable development - Environmental Impact Assessment (EIA)Environmental Impact Assessment.
1 Risk Assessment Develop Objectives And Goals Develop and Screen Cleanup Alternatives Select Final Cleanup Alternative Communicate Decisions to the Public.
 Life in communities has changed over the years.  One of those changes is in transportation. Transportation is a way of moving people or things from.
1 Course Title: Ecotourism Course Code: (TM371) Lecture.
Establishing SEA Guideline for Environment friendly Water Resource Development Young-Il Song.
Investing in the logistics necessary for Africa's Oil and Gas Industry.
Environmental Assessment in Newfoundland & Labrador Environmental Assessment in Federations: Current Dynamics and Emerging Issues Conference Current Dynamics.
THE FOUR STEP SECTION 106 PROCESS: AN INTRODUCTION TENNESSEE STATE HISTORIC PRESERVATION OFFICE REVIEW AND COMPLIANCE SECTION All reproduction rights reserved.
MEASURING CHANGES OF THE SYSTEM Environmental Gradients Human Impacts Environmental Impact Assessments (EIA’s) Modified from DARLENE OEHLKE.
Minsk, October 8 th, 2014 Martin Smutný Integra Consulting Ltd.
EIA’s Environmental Impact Assessments. EIA’s Required in many countries before any kind of development takes place Determines The type and degree of.
Building Strong! 1 US Army Corps of Engineers Regulatory Program Kimberly McLaughlin Program Manager Headquarters Operations and Regulatory Community of.
Croatian Report on new Environmental Protection Law Josipa Blažević-Perušić, B.Sc. Arch. State Secretary Anita Pokrovac-Patekar, B.Sc. Pharm. Senior Environmental.
Policy & Cases Symposium July 29, 2010 Republic of Korea, National Environmental Dispute Resolution Commission.
Country Summary for Ukraine (part 1) status for Roman Volosyanchuk, IUCN CPC.
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
0 Tadas Matulionis Lietuvos Energija AB Strategic planning manager Minsk, December 07, 2007 Environmental Impact Assessment of a New Nuclear Power Plant.
Synopsis EIA Purpose of EIA Origin Key Elements NGO Participation Content Analysis 1.
1 Choi, Mihee Multi-criteria analysis on Decision-Making Process in Public Investment in case of road construction project in Korea.
MUNISPORT LANDFILL Vijay Kumar Rayabharapu. Munisport Landfill (Biscayne Landings) Landfill N N.E. 151st St., Biscayne Blvd ) Florida International University.
Korea Rail Network Authority, Republic of Korea. Contents Introduction Organizations - KRNA Overview of KOREA’s High Speed Rail development Background.
ENVIRONMENTAL OPPORTUNITIES AND CONSTRAINTS ARCHAEOLOGICAL - HISTORICAL INVESTIGATIONS PERMITTING FOR UNAVOIDABLE ENVIRONMENTAL IMPACT AREA ENDANGERED.
Public participation of EIA in R.O.C. Hsiao-Tien Wu, Wei-Chein Sun & Tung-Wang Chang Environmental Protection Administration Executive Yuan R.O.C.
Compensation in Bulgarian Law Where are we ? KONSTANTIN ILCHEV.
I.Summary of technical guideline II.Reviews III.Recommendations.
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
EIA-legislation and practice in Norway history history latest amendments of regulations latest amendments of regulations integrated planning/EIA processes.
September 25, Who is Brushy Creek Regional Utility Authority? Local government corporation formed by Cedar Park, Leander and Round Rock to access,
All About Sanitary Surveys David Edmunds Environmental Program Specialist ADEC Drinking Water Program Sustained Compliance: What It Means to Public Water.
Reclaimed Wastewater Quality Criteria, Standards, and Guidelines
Environmental Impact Assessment in the Slovak republic.
Capacity Building of Kazakhstan Aarhus Centres in Providing Access to and Exchange of Environmental Information Olga Melnik, Information and Analysis Center.
Strengths and weaknesses of the permitting system and enforcement process in RIEW – Veliko Turnovo Regional Inspectorate of Environment and Water - Veliko.
Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015.
SEA in the Czech Republic Prague, 24 September 2008.
UNIT 13 – Monitoring & Compliance Monitoring and Compliance UNIT 13.
UNIT 13 – Monitoring & Compliance Monitoring and Compliance UNIT 13.
State Route 109 (Portland Bypass) Robertson & Sumner County, TN NEPA Public Hearing November 12, 2015.
Invasive Alien Species REFIT Process The perspective from European hunters Meeting of the Directors-general of Hunting and Game management – 1 st of September.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review MHK MA\Categorizing and Evaluating the Effects of Stressors M. Grippo and I.
HIGHWAY DESIGN PROCESS & ROUTE LOCATION Spring 2016.
The Environmental Evaluation Method of Coastal Land Reclamation: Case Study of Korea Sung-Soon Yoon, Jin-Sook Yoon Chul-Oh Shin, Myung-Gook.
1 Integrating Biodiversity Conservation Into Impact Assessment: The Experience of Uganda BERINA UWIMBABAZI.
Recent Movement of Strategic Environmental Assessment in Japan Sachihiko Harashina Tokyo Institute of Technology IAIA07, Seoul, June 3-9, 2007.
Peter Lukáč Ministry of Environment of the Slovak Republic Department of Environmental Assessment.
Lecturer: Lina Vladimirovna Zhornyak, associated professor.
DARSHANA RAGHU MANAGEMENT. Risk Management Risk management is the identification, assessment, and prioritization of risks followed by coordinated and.
Lithuanian Water Suppliers Association LEGAL REGULATION OF WASTEWATER DISPOSAL AND TREATMENT IN LITHUANIA.
July 15, 2008 Hnakuk University of Foreign Studies The Situation of Refugees in Korea & The Korean Civil Society in Action Pill Kyu Hwang Korean Public.
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
Copyright 2010, The World Bank Group. All Rights Reserved. Agricultural Census Sampling Frames and Sampling Section B 1.
Brookeville Bypass Final Design Presentation Initech May 6, 2004.
La World Road Association e le Gallerie Stradali La produzione tecnica e le attività dell’AIPCR sul tema delle gallerie stradali.
Pennsylvania Climate Change Act
The Final Decision in the Environmental Impact Assessment Procedure in Ukraine as a Multilateral Agreement Tretiak Taras Associate Professor of National.
Hung Shiu Fung, Thomas Fischer
Development of the Japan’s RDE (Real Driving Emission) procedure
GEOLOGICAL AND ENVIRONMENTAL INVESTIGATIONS OF HIGHWAY PROJECTS
Nick Bonvoisin Secretary to the Convention on the
Environmental Impact Assessments
JLEIC Accelerator R&D Meeting
Presentation transcript:

1 Content 1.Summary of the Korea High Speed Railway Project 2.EIA System in Korea 3.Limits of Present EIA System 4.Tasks for the Betterment Content 1.Summary of the Korea High Speed Railway Project 2.EIA System in Korea 3.Limits of Present EIA System 4.Tasks for the Betterment

2 - Design in 1990, construction commencement in 1992, commercial operation for 1 st phase of the project from April hr.30 min. from Seoul to Busan on the ㎞ route ※ 60% of population(30 million) and 70% of national logistics concentrated on this route - EIA conducted from 1991 to 1992

3 Estimate, analyze, and mitigate damages by construction projects to ecosystem, living environment, society and economy - Railway and road projects - Residential and industrial complex development - Dam construction and reclamation projects - Golf course construction and group facilities district development inside a national park - Ecosystem : 5 Points(meteorology, topography, geology, endemic species) - Living environment : 11 points(noise, vibration, quality of atmosphere and water, wastes) - Social and economic environment : 7 points (population, habitation, industry, etc.) Evaluate any possible impacts alongside high speed rail route( 1 ㎞ wide ) after completion

4 Developer drafts EIA Report Developer drafts EIA Report Presentation and public inspection Presentation and public inspection Public hearing Report completion Report completion ◦ Reporting procedure Developer submits EIA report Developer submits EIA report Notify confirmed report to developer Notify confirmed report to developer Review by MOE. ◦ Confirmation procedure -Report confirmation · Submit the completed EIA report to government (Ministry of Environment) for a review by subordinating special organizations -Report completion · After confirming the final route make a draft EIA report · Make a presentation and public inspection for residents · If more than 5 to 30 residents want, hold a public hearing and complete the EIA report -Post-process of the confirmed report · Developer, through post-environmental impacts survey, abide by the confirmed report in a faithful manner · MOE, through frequent field inspections, check whether or not confirmed report is properly observed(construction suspension order, correction order, etc)

5 ■ Since EIA system was introduced in Korea in 1982, environmental impacts have been assessed on the projects which had finished feasibility review - Cumulative impacts caused by other projects on same area were not analyzed - Rather than assessing impacts on human ecosystem and final receptors of the impacts, EIA focused on assessing impacts on atmosphere, the water quality, noise, and other easily comparable criteria, making it simple but not encompassing the entire scope of environment. - Carrying out EIA after site selection makes the review on alternatives virtually impossible ■ A deeper appreciation of environment preservation heights environmental consciousness among nation people and helps accelerate the establishment of NGO groups since Activities of NGOs have been increasingly varied and their influence magnified ※ Many environmental NGO groups were established between 2000 and 2004 (120 out of all 260 NGO groups in Korea are environmental NGOs)

6Wetland/temple Horizontal distance(m) Vertical distance(m) Slope distance(m) Mujechi Milbat Hwaum2, ,746 Naewon temple 2,260702,261 Bumeo temple 1, ,514 Cross section of the tunnel area ■ Plaintiff : Buddist priests of Naewon Temple in Mt. Chunsung and NGOs ■ Claim : Tunnel(depth:300m) to be run beneath Mt. Chunsung(height:922m) in 2 nd phase shall be realigned for ecosystem conservation. - They claimed the change of high speed rail route since 2002 because more than 20 wetlands, 30 endemic animals and plants are excluded in the original EIA and ground subsidence and deprivation of ground water are anticipated. - A lawsuit was filed on Nov. 2001, construction was suspended for 3 years and 6 months, and one buddist priest entered into a hunger strike four times upto 100 days - NGOs filed a lawsuit on Oct again under the name of korean clawed salamander but the court dismissed the case(no such case whose plaintiff is not a human is found in legal history worldwide) - Experts selected by government and NGO groups made a precise investigation to verify the case ■ Major wetland, temple, and separating distance

7 Government adopted SEA, a system in which environmental concerns are addressed in early stages of development, and it will take effect on If environmental concerns are addressed in pre-environmental review process by reflecting residents' opinion, developers do not have to consider the opinions in EIA stage, otherwise it could be redundant works - Concerning major environmental issues, opinions of NGOs, local residents and expert reviews shall be reflected and then social conflitcs can be minimized