LBTI Program Management Review Phil Hinz S.H. (Hop) Bailey 2 December 2014 1.

Slides:



Advertisements
Similar presentations
TRB BRT Workshop July 22, 2008 ECTP Project Oversight Grantee Perspective.
Advertisements

Ninth Lecture Hour 8:30 – 9:20 pm, Thursday, September 13
Quality and reliability management in projects (seminar)
General Activities Stuartt Corder April 9, 20141ASAC telecon.
1 Schedule Risk Assessment (SRA) Overview July 2013 NAVY CEVM.
PLATO Phase A/B1 Status TOU Meeting Catania 28 Feb 2011 PLAnetary Transits and Oscillation of stars.
1 NGAO Instrumentation Studies Overview By Sean Adkins November 14, 2006.
LGS Project Meeting February 1, 2006 Agenda 1.IPT status updates: Laser facility, AO optomechanics, AO software (Bouchez, Roberts, Trinh; 30 min) 2.Sum-Frequency.
MMT AO run Jan Timeline: –Night 1: Install hardware during MMT engineering –Nights 2-4: AO engineering with fast-framing H camera (Indigo) –Nights.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
HARPS-NEF PDR December 6 & 7, HARPS-NEF Program Project Manager Tim Norton.
Don Cole Risk Assessment and Mitigation Project Management for ARA Engineers and Scientists.
I. Plan to Meet PLRA Threshold Requirements Phil Hinz Principal Investigator.
Server Virtualization: Navy Network Operations Centers
J. Large Binocular Telescope (LBT) Operational Readiness
C. Executive Summary Phil Hinz Principal Investigator.
Exoplanet Exploration Program Large Binocular Telescope Interferometer (LBTI) Operational Readiness Review (ORR) PI: Phil Hinz, UA PS: Rafael Millan-Gabet,
ASPERA-3 April. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/01 Schedule statused.
LBTI HOSTS Science Operations Plan Draft 0 – Feb
Interim Executive Director June  Financial Management Practices Audit Results Fiscal Year Audit Results Fiscal Year Internal.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
Research & Technology Implementation TxDOT RTI OFFICE.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli.
LIGO-G M Planning and Implementation Strategy for Advanced LIGO Gary Sanders LSC Meeting Hanford, August 14, 2001.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
MNRF Management and milestone achievements Chris Evans AAO.
N. Summary Phil Hinz Principal Investigator. Performance N-2.
ATNF Operations Douglas Bock ATUC – 25 NOVEMBER 2014.
Large Binocular Telescope Interferometer (UA) Q4 FY10 Exoplanet Presentation Philip Hinz - PI Thomas McMahon - PM LBTI 1.
F. LBTI Current Performance and Compliance with ORR Entrance Criteria Phil Hinz Principal Investigator.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
D. Measurement Approach Phil Hinz Principal Investigator.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
1 Space Telescope Science Institute JWST S&OC JWST S&OC Contract Peter Stockman TIPS March 20, 2003.
LBTI Program Management Review Phil Hinz S.H. (Hop) Bailey 9 July
Hazardous Materials Emergency Preparedness Grant Multi – Year Award Process Matthew R. Jones Sr. Grants Management Specialist Grants and Registration Branch.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
Strykowsky 1Project Review November 2, 2005 NCSX Project Review November 2, 2005 Cost and Schedule Ron Strykowsky.
Keck Next Generation AO Next Generation Adaptive Optics Meeting #2 Caltech November 14, 2006 P. Wizinowich for NGAO Executive Committee.
MUSE KO: MUSE Support at ESO ‘customer’  MUSE Team Created (ESO-customer), contacts with the Consortium and support activities on-going  Budget and Manpower.
CHILDREN OF PRISONERS PARTNERSHIP What is the Children of Prisoners (CP) Partnership? The CP Partnership is a funding project between PFI and selected.
1 June 2012 COR1000 Telecoms Project UK Link Committee.
RLSR 16/4/2015 UK Financial Plan & Risks. Content Finances – FY 2014/15 – Cost to Completion Risks – Top level to completion – R9 working space – Summary.
UK Project Plan (Finance & Risk) Alan Grant STFC DL RLSR 5 th April 2016.
2011 Annual MTAP/SCOPT Fall Meeting Updates on FTA Programs, Policy, and Discretionary Grants – Federal and Regional Perspective November
UK Project Plan Roy Preece STFC RAL RLSR 26 th October 2015.
LBT Q Engineering Review ENGG – Engineering General.
Reported by Ron Prwivo for Ian Robson. Overview Response to Recommendations from the RLSR of November 2014 – very good, RF staffing remains an issue Very.
MGT 437 Week 3 Learning Team Project Planning Technical Paper To purchase this material click below link
CBETA Project ALD’s Cost and Schedule Review February 6, 2017
Chapter 6: Database Project Management
Corrective Action Plans – Mod 13
UK Financial Plan & Risks
Peer Review Agenda (Suggested).
Quality and reliability management in projects
STEP 7 - EXECUTION PHASE: MONITORING & CONTROLING
NASA Independent Reviews -Lessons Learned-
Management Breakout: MREFC Budget Summary Victor L
SHARE Michael Chmura, SHARE Special Projects Leader
General Services Department
Click to add title Planning for LSST Verification George Angeli LSST All Hands Meeting Tucson August 15, 2016.
AURA Meeting 05/24/2017.
DSC ChMC CSS update 11th December 2018
FY2018 LABORATORY CALENDAR
Preventive Maintenance Service Agreement
SNS-PPU upgrades the existing accelerator structure
SHARE Special Project SHARE Benefits Optimization
Presentation transcript:

LBTI Program Management Review Phil Hinz S.H. (Hop) Bailey 2 December

Agenda 2

LBTI Summary (July – 10/14/14) TechnicalScheduleProgrammatic Overall On plan, adequate margin Problems, working to resolve within planned margin Problems, not enough margin to recover Resources 3 GYR Technical Successful and repeated nulling accomplished in CB2a (November runs). Low-frequency vibration suppression successfully demonstrated under range of observing conditions Engineering effort on LBT structures flagged by LBTO for future effort to determine source, structural modes and alternative mitigation; modeling and accelerometer progress by both UA and JPL Detector noise determined to be inherent in the detector LBT secondaries performed nominally during CB2a demonstrating repairs in August continue to mitigate contact problems LBTO/JPL worked technical solutions for long-term mitigation of AO electrical contact failures LBTO preparing spare secondary shell Successful CB2a showing improved nulling depth and repeatability. Fringe locking automation improved. Schedule UA updates the schedule weekly and reviews the result with JPL bi-monthly LBTO conducts engineering runs prior to the CBs to demonstrate readiness of the Telescope systems (complete on CB2) Resources Additional labor at JPL and UA, as well as funding and procurement of some spares, now in the plan LBTO has hired an AO Engineer, Guido Brusa, to complement the current AO staff Programmatic ORR scheduled for Apr 16, 2015 Planning budgets submitted to JPL for FY15-18 including overguidance budget for extended science observations in FY18 Working detector array spare or alternative with ESO LBTI PM assessment: Mitigated risk of meeting April 2015 ORR by 1) continued improvements in measured errors during CB2a, 2) stability of provisional fix to LBT AO systems GGGY G

Action Items From Last PMR

Accomplishments LBTI – Successfully conducted CB2a Acquired repeated successful nulling sequences Demonstrated success of phase loop to suppress low-frequency vibration – Submitted cost proposal to JPL for spares procurement LBTO – Stable operation of all telescope systems in support of LBTI including AOs. – Conducted closed-loop secondary engineering run prior to LBTI CB2s – Hosted JPL team in Tucson to discuss spare AO shell and visit Sunnyside coating facility 5

CB2a Plan and Summary Results 6

CB3 Plan 7

Level 1 Trackstones 8

Level 2 Trackstones 9

Risk Register 10

Risk Register 11

Upcoming Events 12/8-12/9: AO engineering runs prior to CB3 12/10-12/17: CB3 12