Freeway Congestion In The Washington Region Presentation to National Capital Region Transportation Planning Board February 15, 2006 Item # 9.

Slides:



Advertisements
Similar presentations
Click to edit Master title style »Click to edit Master text styles –Second level Third level –Fourth level Fifth level Construction Update 11/13/2012 Larry.
Advertisements

I-95 HOT/HOV Lanes Project Fairfax County TAC August 16, 2011.
Some things cant wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
THE 2012 FINANCIALLY CONSTRAINED LONG-RANGE TRANSPORTATION PLAN (CLRP) AND THE FY TRANSPORTATION IMPROVEMENT PROGRAM (TIP) Transportation Planning.
Project Prioritization - 1 Project Prioritization Using Paramics Microsimulation: A Case Study for the Alameda County Central Freeway Project Presented.
I-394 Express Lane Community Task Force March 18, 2004.
I-80 Corridor System Management Plan Alameda County Transportation Commission ACTAC Meeting September 7, 2010.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
Welcome to El Dorado Hills. Goals of Presentation Summarize growth, traffic, and road network state affecting planning in EDH - Especially where not easily.
2011 Freeway Congestion Monitoring Program Findings TPB Technical Committee December 2, 2011 Greg Jordan, SKYCOMP, Inc & Daivamani Sivasailam, DTP TPB.
TRB Lianyu Chu *, K S Nesamani +, Hamed Benouar* Priority Based High Occupancy Vehicle Lanes Operation * California Center for Innovative Transportation.
Tolling and Congestion Pricing Patrick DeCorla-Souza Office of Innovative Program Delivery Federal Highway Administration Presentation to Transportation.
A Handbook That Outlines When traffic impact studies should be required What analyses should be included How the study should be reviewed and used Who.
Transportation leadership you can trust. presented to Talking Freight Seminar presented by Richard Margiotta Cambridge Systematics, Inc. September 21,
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
Performance Analysis Presentation to the National Capital Region Transportation Planning Board (NCR-TPB) November 28, 2012 Adopted: July 18, 2012 Item.
1 Modeling Active Traffic Management for the I-80 Integrated Corridor Mobility (ICM) Project Terry Klim, P.E. Kevin Fehon, P.E. DKS Associates D.
Pat Bursaw, Minnesota DOT International Partnership Meeting Washington D.C. January 26, 2012.
What are Managed Lanes What are Express Lanes What are HOT Lanes Regional Express Lanes Network I-95 Express I-595 Express I-75 Express.
Presentation to ***(group) on ***(date) 1.  Cities - 11  Highway districts – 3  Ada and Canyon Counties  School districts – 2  Valley Regional Transit.
Public Comment Mobility Vision Plan 2035 MVP Website 2035 MVP Brochure and Survey. Provides specific information on the Plan Update. Survey – your opinion.
Congestion Causes and Solutions. Traffic Congestion Characteristics Slower speeds Longer trip time Increased queues More vehicles.
Briefing on the Washington Metropolitan Area Transportation Operations Coordination (MATOC) Program Presentation to the Transportation Planning Board Michael.
Route 1 Project Study Report Overview. A report that describes the transportation problem and identifies the project scope, schedule and estimated cost.
Update to the Financially Constrained Long Range Plan (CLRP) Status Report Presentation to the National Capital Region Transportation Planning Board.
1 What If… The Washington Region Grew Differently? The TPB Regional Mobility and Accessibility Study TPB Citizens Advisory Committee Public Forum in Oxon.
TRB Transportation Applications Conference Congestion-Free Freeways US Department of Transportation Establishing a Metropolitan.
Modeling HOT Lanes TPB’s Approach AMPO Travel Modeling Group March 21, 2006 I:\ateam\meetings_conf\ampo_tms\ \Hot_Lane_Pres_to_AMPO_Final.ppt.
DRAFT What If… The Washington Region Grew Differently? Public Forum on Alternative Transportation and Land-Use Scenarios National Capital Region.
Performance Analysis Presentation to the National Capital Region Transportation Planning Board (NCR-TPB) December 19, 2012 (updated from November 28, 2012)
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
1 What If… The Washington Region Grew Differently? February 2005 Public Meeting on Alternative Transportation and Land-Use Scenarios National Capital Region.
1 CTC Discussion P3 Ingenuity Made Congestion Managing Pricing a Success James Martling, April 9, 2008.
2014 Freeway Congestion Monitoring Program MOITS Technical Subcommittee December 9, 2014.
Regional HOT Lanes Study Preliminary Findings An Informational Hearing of the Senate Transportation and Housing Committee Toll Roads and Managed Lanes.
Regional Transportation Data Clearinghouse Update MWCOG Technical Committee 5 November 2004 Bob Griffiths, Martha Kile, Charlene Howard Department of Transportation.
I-95 Access Study Fredericksburg Area Project Status Update February 12, 2010.
Review of the Texas Transportation Institute (TTI) 2007 Urban Mobility Report By Ronald F. Kirby Daivamani Sivasailam TPB Technical Committee October 5,
The Fargo/Moorhead Area Interstate Operations Study Opportunities and Planned Activities Presentation for the Mn/DOT Travel Demand Modeling Coordinating.
THE EL MONTE HOV / BUSWAY: A Policy Driven Experiment in Congestion Management Frank Quon Division of Operations Deputy District Director HOV LANES IN.
2004 Transportation M etropolitan A tlanta P erformance Report – Congestion Measures Presentation to ITS Georgia August 29, 2005.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
Expressway Driving Legacy High School Drivers Education.
I-15 Express Lanes Project January 2012 I-15 Express Lanes Project January 2012.
1 Update on the Congestion Management Process (CMP) and Related Data Activities Wenjing Pu COG/TPB Staff Travel Management Subcommittee Meeting May 26,
Minnesota’s Urban Partnership Agreement UPA Timeline The UPA agreement with the US DOT requires that the project be operational by September 30, 2009,
Travel Reliability – Reliable traffic flow is more important than reducing congestion – traffic congestion is often a sign of an area’s economic vitality.
Review of the Texas Transportation Institute (TTI) 2007 Urban Mobility Report By Ronald F. Kirby Presentation to Transportation Planning Board October.
The Regional Mobility and Accessibility Study Initial Results of CLRP/CLRP+ Analysis with Round 6.4 Growth Forecasts and Five Alternative Land Use Scenarios.
Shaping our Future Transportation Transportation trends Influencing trends through land use decisions Alternative futures: Base Case and Scenario Complementary.
IH-10 Managed Lanes Project: A “Public-Public” Partnership ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates Presented at the Value Pricing Conference.
Summary of the WILMAPCO Congestion Management Process Prepared for T3 Webinar September 18, 2007.
MED SR 18 Corridor Project MED PID October 13, 2015.
The 2006 Constrained Long-Range Transportation Plan: Plan Performance Ronald F. Kirby Director of Transportation Planning October 18, 2006 Item #7.
1 What If… The Washington Region Grew Differently? The TPB Regional Mobility and Accessibility Study Ronald F. Kirby Director, COG Department of Transportation.
Project Sponsor: Ohio Department of Transportation District 12.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
Status Report on the Regional Value Pricing Study Ronald F. Kirby, Director of Transportation Planning November 15, 2006 Item 11.
I-66 OUTSIDE THE BELTWAY Shrevecrest HOA JUNE 21, Susan Shaw, P. E
Integrating Transit and Highway Solutions In High Volume Corridors
Macro / Meso / Micro Framework on I-395 HOT Lane Conversion
Four Winds Condominium Association August 2, 2017
Sully District Council of Citizens Associations January 25, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation.
TVTC Impact Fee Update Nexus Study January 30, 2008
The Oakton Condominium Association September 12, 2017
Slugging in the I-395 Corridor
Problem 5: Interstate 87 Interchange
Current and proposed HOT facilities update
1. Where should buses run and with what frequency?
Presentation transcript:

Freeway Congestion In The Washington Region Presentation to National Capital Region Transportation Planning Board February 15, 2006 Item # 9

2 FREEWAY CONGESTION MONITORING Background –300 mile system monitored every 3 years since 1993 (5 surveys to date) –3 hours in the AM and 3 hours in the PM –Photographs taken on multiple days (minimum of 3 days) with typical, recurring conditions –Density in passenger cars per mile per lane of freeway segments used to identify congestion –2005 survey compared with 2002 survey and prior surveys (1999, 1996, 1993).

3 Levels of Service (LOS) Based on Density –LOS “E and F” considered as congested

OVERALL SYSTEM PERFORMANCE

AM Peak Period (6 AM to 9 AM)

PM Peak Period (4:30 PM to 7:30 PM)

% 20% 15% 10% 5%

SEGMENTS WITH SIGNIFICANT CHANGES

9 I-95 in Virginia / EVENING DEGRADED CONDITIONS (General trend toward more congestion at the HOV lane merge no significant capacity changes)

10 DULLES TOLL ROAD / MORNING Addition of a fourth (HOV) lane was completed prior to the 1999 survey, resulting in improved eastbound flow; however, further LOS degradation is evident since then. (The Greenway has channeled additional traffic into this corridor.) DEGRADED CONDITONS

11 (General trend toward more congestion on the Beltway; no significant capacity changes) DEGRADED CONDITIONS I-495 (BELTWAY) vicinity College Park / EVENING

12 IMPROVED CONDITIONS US 50 in Maryland / MORNING Prior to the survey in 2005, an HOV lane was added to US 50 in each direction (24- hour enforcement). The additional capacity of the highway has dramatically improved traffic flow on US 50.

13 I-495 (BELTWAY) vicinity Springfield / EVENING IMPROVED CONDITIONS (Widened exit ramps opened prior to 2005 survey) (During the height of construction, outer loop congestion was particularly severe) ( , extensive exit queues were found, but intermittently)

14 DC 295 at US 50 / EVENING It appears that completion of construction on US 50 has resulted in improved eastbound flow, which may now be generating downstream congestion at the DC 295 merge. MIXED RESULTS

SIGNIFICANT CHANGE DUE TO IMPROVEMENT COMPLETED AFTER SPRING 2005 : THE BELTWAY OUTER LOOP TO THE DULLES TOLL ROAD

16 After the Spring 2005 survey VDOT opened a second lane on the off-ramp from SB I-495 to WB VA 267. SKYCOMP conducted additional AM and PM flights in December 2005 and January The following two slides show the improvements during the AM and PM peak hour. A SIGNIFICANT RECENT IMPROVEMENT: ADDITION OF THE SECOND LANE ON EXIT RAMP FROM I-495 TO VA 267

17 I-495 Outer Loop (8 to 9 AM) I-495 Improvement due to 2 nd lane on exit ramp at VA 267

18 I-495 Outer Loop (5:30 to 6:30 PM) I-495 Improvement due to 2 nd lane on exit ramp at VA 267

19 Spring 2005 (8 to 9 AM) Winter 2005/2006 (8 to 9 AM)

20 –The addition of the extra lane on the off-ramp produced a dramatic improvement. –Outer loop traffic which used to back up to I-270 now flows freely during the AM and PM peaks. –The interchange downstream of the improvement has to be watched for future problems. The on-ramp from EB VA 267 and the off ramp to WB VA 123 are becoming congested due to weaving and traffic backing up from a signal on VA 123. FINDINGS FROM THE ADDITION OF 2 ND LANE EXIT RAMP TO WB VA 267 FROM SB I-495

21 Freeway Segments with the Most Significant Changes (2002 to 2005)

22

23

24 Top Ten Congested Segments on the Freeway System (2005)

25

26 Overall Study Findings –Total lane miles of congestion have increased significantly since 2002 throughout both the AM and PM peak periods, with the greatest increase (64%) in the first hour of the PM peak (4.30 to 5.30pm). –Congestion is generally in the peak travel direction only during AM and PM peak periods. Exceptions are the 14 th street bridge (AM and PM), I-66 inside the Beltway (AM and PM), the Wilson Bridge (AM), and the northwestern portion of the Beltway (PM) which are congested in both directions. – Capacity increases have improved conditions at certain locations (US 50, Springfield Interchange, Capital Beltway at Dulles Toll Road). –Locations downstream of major improvements need to be monitored for potential future problems.

27 Tackling Recurring Freeway Congestion – Short Run Capacity Increases To Address Bottlenecks Adequate freeway to freeway, freeway to arterial, and arterial to freeway connections High Occupancy Toll (HOT) or Express Toll Lanes (ETL) Transit and Demand Management Adequate transit funding and capacity Ridesharing and telecommuting

28 Tackling Recurring Freeway Congestion – Longer Run Alternative Land Use/Transportation Futures (Regional Mobility and Accessibility Study) More Households in Activity Centers –More households in the region located in regional activity centers –Supporting transit improvements Region Undivided –Some job and household growth shifted from West to East –Supporting transit improvements