JUNTOS CONSTRUIMOS UN PAIS DE CALIDAD HONDURAS RENEWABLE ENERGY 2012.

Slides:



Advertisements
Similar presentations
An Overview of the Development of a Renewable Energy Project And the 5 Major Milestones to Achieve Financing By Robert Hunter Director of Operations, Green.
Advertisements

Grenada Sustainable Energy Plan Stakeholders Meeting April 5, 2002.
Dr. Bader Eddin Al-Majali
Path to your Energy Savings Existing Residential and Small Commercial.
Energy Efficiency in Barbados Ministry of Finance, Economic Affairs & Energy 5 August, 2008.
L/O/G/O Green Energy Projects Opportunities for Cooperation Opportunities for Cooperation.
Reemplazar por una foto que ilustre el tema. Sino eliminar Energy and Clean Energy in Central America Investment Opportunities within the Region Dr. Nick.
MoscowMoscow Chuvash Republic Territory – square km Territory – square km Capital – city of Cheboksary Capital – city of Cheboksary Population.
The Need for an Energy Grid in the Maldives
Regional Emission-free Technology Implementation (RETI): Diversifying the U.S. Electricity Portfolio Marc Santos 2008 ASME WISE Intern University of Massachusetts.
Identification of needed competences Socio-economic development in the era of renewable energies: Towards the creation of a research institution for the.
Community Energy Opportunities Jon Bell Business Development Manager Mosscliff Environmental Ltd.
BY S. U. YAMUSA II AND A. H. ANSARI
Module 1: Understanding Bioenergy Resources
1 VIABILITY OF SOLAR ENERGY BASED ELECTRICITY GRID- REGULATORY CHALLENGES AND OPPORTUNITIES Nigerian Electricity Regulatory Commission, Abuja Presentation.
Sustainable Energy at the World Bank: Policies and Experiences Anil Cabraal Lead Energy Specialist Energy and Water Department The World Bank Norway-World.
E NERGY, E NVIRONMENT AND S USTAINABILITY Gaurav Shukla CUTS International.
Perspective of Bioenergy and Jatropha in Uganda William Kyamuhangire, PhD. Associate Professor Faculty of Agriculture Makerere University Uganda.
Presented by: Gerald W. Braun, Director Business Development June 17, 1998 A Business Unit of Amoco/Enron Solar Financing of Renewables: Considerations.
Fremont County – Green Spring 2012 Research Team: Jacob Tolman, Justin Andersen, Thresia Mouritsen, Joseph Huckbody, John Beck Feasibility Study.
Environment and Energy Htun Paw Oo 1 June Content Environment and Energy Ecosystem services The role of energy Myanmar energy context Way forward.
NJ Clean Energy Program Noveda Technologies Liberty Science Center By: Joe Fiorella Information from the:
Rory McIlmoil, Downstream Strategies. Introduction to distributed energy The case for distributed renewable energy Opportunities for developing distributed.
RENEWABLE ENERGY POLICY. Renewable energy is energy that comes from resources which are continually replenished such as sunlight, wind, rain, tides, waves.
Virginia : Offshore Wind Feasibility Analysis Trevor S. Daubenspeck.
Distributed Generation Programs, Incentives and Interconnections Ian Loughran, P.Eng. DSM Program Leader Renewable Energy Programs
Resource Planning Georgia Power’s Diverse Plan to Meet Georgia’s Energy Needs AWMA Fall 2010 Conference October 7, 2010 Jeff Burleson Director of Resource.
Leveraging ARRA Funding Terry Hall Energy and Carbon Markets Practice Contact.
Tourism Planning Lecture 3.
POWER SECTOR POLICY OVERVIEW ASSOCIATION FOR POWER UTILITIES OF AFRICA (APUA) SCIENTIFIC COMMITTEE CONFERENCE Presentation by Mr. M. Mulasikwanda Department.
Renewable Energy in New Jersey’s Clean Energy Program Scott Hunter Renewable Energy Program Administrator, Office of Clean Energy in the New Jersey Board.
Oregon Renewable Energy Action Plan April 2005 with Geothermal Energy highlights by Carel DeWinkel Senior Policy Analyst.
State Department Cooperation in Hemispheric Alternative Energy: Lessons by: Matthew McManus Division Chief, Energy Producer Country Affairs U.S. Department.
Quantum Leap in Wind Role of Institutions and Regional Cooperation Chunhua Li DGM Goldwind International June 2011, Manila.
Environmental Protection and Infrastructure Operational Programme Tímea Baán EIOP Managing Authority Ministry of Economy and Transport.
How to deliver a Renewable Energy Project Jemma Benson CO2Sense Yorkshire.
ENERGY MIX IN SENEGAL WHICH ONE TO CHOOSE? General Directorate APUA CONGRESS. LUANDA 2014 Safiétou DIALLO Technical Adviser.
Batyr Ballyev, Head, Environment Protection Department, the Ministry of Nature Protection of Turkmenistan Climate Change-Related Priorities & Needs.
BUSINESS OPPORTUNITIES IN RENEWABLE ENERGIES FOR CHILE BUSINESS OPPORTUNITIES IN RENEWABLE ENERGIES FOR CHILE Javier García M. Deputy Head Investment and.
[Legislative] [American policy] Passing of the Public Utility Regulatory Policies Act (PURPA) in Introduced competition within the supply sector.
Solution for Future Electrical Supply in the Middle Europe Nuclear Power Ivo Kouklík
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
Biofuels at the level of the Common Market for Eastern and Southern Africa (COMESA) Presented to First High Level Biofuels Seminar in Africa Addis Ababa,
COMMUNITY CHOICE AGGREGATION: TECHNICAL STUDY RESULTS Peninsula Clean Energy September 24,2015.
FOR SIXTY YEARS WE HAVE BEEN TAKING THE POWER FROM WATER AND HANDING IT OVER TO NATIONS LINKING THE DOTS Bucharest, February 20, 2014.
RDL Utility Based Financial Incentives for Renewable Energy & Energy Efficiency in New Zealand EGNRET Workshop Honolulu, Hawaii, USA 30 March – 1 April,
Renewable Energy Policies of Germany and China Masood Ahmed CRER, SZABIST December 24’ 2009.
DG Toronto Hydro’s Perspective Task Force on Distributed Generation Richard Lü VP, Environment, Health & Safety March 5, 2003.
Energy. Goals Help protect the environment and increase community economic efficiency by promoting alternative energies, specifically solar panels and.
THE LONG-TERM ENERGY SUPPLY AND DEMAND OUTLOOK IN TAIWAN ENERGY COMMISSION MINISTRY OF ECONOMIC AFFAIRS AUGUST 2001 MOEA -15-
Secondary legislation on renewable today and tomorrow Nicolae Opris Vicepresident, ANRE ANRE ROMANIAN ENERGY REGULATORY AUTHORITY.
Investing Our Energy In You Traverse City Light & Power Electric Generation TCL&P Study Session December 1, 2009.
1 Slovak Policy in the area of RE and EE Juraj Valach Ministry of Economy Slovak Republic July 3-4, 2003, Szentendre.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
Page 1 Implemented by Up-Scaling of Wind Power in Vietnam AHK Business Trip “Wind Power in Vietnam” Ho Chi Minh City, 23 November 2015 Peter Cattelaens.
NS4054 Fall Term 2015 Central American Energy Security.
In 2014, the average levelized price of signed wind power purchase agreements was about 2.35 cents per kilowatt-hour. This price is cost competitive with.
Church Presentations By Peter Boogaart Holland, MI
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
EABC/EAC ENERGY CONFERENCE: 8-9TH JUNE, AVAILABLE BUSINESS OPPORTUNITIES IN THE ENERGY SECTOR By Eng. B.J. Mrindoko.
Energy and Environmental Policy Renewable Energy: Wind Presented by: Adam Smith Damien Hammond Veera Kondapi Jeff Gruppo.
Market Failures Chapter 7 Sections 2 and 3 Economic Solutions to Global Warming.
11 Measures to support high- efficiency district heating and cogeneration Anders Hasselager Senior Policy Advisor Kiev, 19 May 2016.
Renewables Readiness Assessment -Background Jensen Shuma IRENA - local consultant Dar es Salaam, 9 March 2016.
RENEWABLE ENERGY REGULATION IN KENYA KENYA-SPAIN MULTILATERAL PARTNERSHIP MEETING HELD AT CROWNE PLAZA Presented by Caroline Kimathi Asst Manager, Licensing.
ROK-PH Partneship: Exploring Cooperation in Renewable Energy Mr. Ariel D. Fronda Division Chief, Geothermal Energy Management Division Renewable Energy.
Comparison between Wind Energy Public Policies in Brazil and Colombia
Engaging the private sector
Phase 3 Solar Feasibility Study Findings and Recommendations
Energy Sector Overview
Presentation transcript:

JUNTOS CONSTRUIMOS UN PAIS DE CALIDAD HONDURAS RENEWABLE ENERGY 2012

HONDURAS Honduras is one of the largest Central American countries with the second lowest population density. 118,890 square km, with a population density averaging 65 people per square km. Honduras has specific legislation on energy investments and development which provides access to a competitive and free market, with pricing established by supply and demand. Honduran energy coverage has expanded from 45% of the population in 1995 to 71% in Honduras is pioneering a program for a Clean Energy Market Development for small renewable energy producers that will be part of the regional network.

CURRENT RESOURCES AVAILABLE IN HONDURAS Renewable energy sources are those which provide a constant and indefinite source of raw material because of their natural ability to replenish and reproduce. Renewable energy sources come from naturally existing diverse elements, such as: WIndHydroGeothermalBiomassSolar

ADVANTAGES BiomassHydroWindGeothermalSolar Low Carbon emissions and less hostile carbon footprint Acts to limit the use of non-renewable, petroleum based energy sources, which are not available in the region. Provides an incentive for local economic and social development.

FINANCIAL INCENTIVES FOR INVESTMENT Exemption for all taxes, fees and import costs for the following: All equipment, material, spare parts, and tools destined or pertaining to projects aimed at the generation of renewable energy. Project developers will be direct beneficiaries of all incentives established in Honduran customs laws – relating to imports of machinery and necessary building equipment, as well as maintenance tools and supplies. Individual and corporate income tax exemption for materials and services related to renewable energy projects - including feasibility studies, installation, engineering, administration, construction and subsequent work to be done on the projects. For systems under 50 MW capacity – 10 year tax exemption on income; effective when a system is commissioned for commercial operations.

HONDURAN PRODUCTION POTENTIAL (Mw) Potential for energy production with renewable energy sources excedes 5,100 Mw. Only 10.4% is currently being exploited.

CURRENT RURAL ENERGY CONNECTIVITY Communities with electricity 1,159 Communities without electricity 7,800 * 998: Health Centers without access to electricity.

Average Sunlight Exposure: September 6-7 hours 7-8hours 5-6 hours

ECONOMIC ADVANTAGES for HONDURS Stable, long term, competitive pricing. Stable, long term, competitive pricing. Long term investment provides multiple benefits. Long term investment provides multiple benefits. Development of the national energy industry. Development of the national energy industry. The National Interconnection System will see its current losses reduced. The National Interconnection System will see its current losses reduced. Reduces imports of petroleum based fuel resources. Reduces imports of petroleum based fuel resources. Keeps funds available for investment within Honduras. Keeps funds available for investment within Honduras.

CONCLUSIONS Biomass production potential: 1000 Mw Projects with approved operation permits today total 700 Mw Projects awaiting approval: Mw Honduras has the land and resources for development of all renewable resources: hydro, solar, wind, biomass and geothermal. The interconnection project between Central America systems is under construction. Renewable Energy is an integral component in the National Development Plan. National investors and actors are prepared to support and complement foreign entities through financing and co-investment. Strong political will and favorable legislation promote cooperation.

Thank You!