Status of Virgo A. Viceré INFN-Firenze – Università di Urbino.

Slides:



Advertisements
Similar presentations
Status of the Virgo Commissioning G.Losurdo – INFN Firenze/Urbino for the Virgo Collaboration.
Advertisements

September 21, 2005Virgo Status – ESF Workshop1 Status of Virgo B. Mours.
Andrea Paoli AdV 1 st Project Review Cascina, November 3 rd, 2008 IME – infrastructure modifications for environmental noise reduction.
VIRGO: WHERE WE COME FROM WHERE WE ARE GOING GIOVANNI LOSURDO - INFN Firenze Advanced Virgo Project Leader for the Virgo Collaboration (and the LIGO Scientific.
Virgo commissioning update - VSR1 first month summary E. Tournefier WG1 meeting, Cascina June 20 th,2007.
F. Frasconi I.N.F.N. Pisa for the Virgo Collaboration TAUP2007 Sendai, September 11-15, 2007 VIRGO EXPERIMENT VIRGO: a large interferometer for Gravitational.
1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.
VSR1 summary - post VSR1 Commissioning plans E. Tournefier (LAPP-CNRS) LSC-Virgo meeting Oct 22 nd, 2007.
rd ILIAS-GW annual general meeting 1 VIRGO Commissioning progress J. Marque (EGO)
COMMISSIONING PROGRESS G.LOSURDO – INFN Firenze for the Virgo Collaboration.
Towards a Design Study Proposal for a 3rd Generation Interferometric Gravitational- wave Detector Harald Lück London, October 26th 2006.
Report From Joint Run Planning Committee R. Passaquieti & F. Raab - LSC / VIRGO Collaboration Meeting rd July 2007 – LIGO-G Z.
September 8, 2015 THE MONOLITHIC SUSPENSION STATUS FOR THE VIRGO INTERFEROMETER THE MONOLITHIC SUSPENSION STATUS FOR THE VIRGO INTERFEROMETER Helios Vocca.
Francesco Fidecaro Advanced Virgo Review, Cascina, November 3, 2008 Virgo brief status report.
Status of Virgo Gabriele Vajente INFN Pisa and Scuola Normale Superiore di Pisa On behalf of the Virgo Collaboration 11 th Gravitational Wave Data Analysis.
Plans for Advanced Virgo
Optical Configuration Advanced Virgo Review Andreas Freise for the OSD subsystem.
LIGO-G W News From Joint Run Planning Committee Roberto Passaquieti & Fred Raab 23May2007.
Francesco Fidecaro STAC meeting, Cascina, May 28, 2009 Virgo status report.
March 17, 2008LSC-Virgo meeting1/12 Virgo Status B. Mours.
Status of the Advanced Virgo detector F. Piergiovanni on behalf of The Virgo Collaboration GWPAW, Osaka, 06/17/2015.
Virgo Commissioning update Gabriele Vajente for the Virgo Collaboration LSC/VIRGO Meeting – MIT 2007, July LIGO-G Z.
Advanced VIRGO WG1: Status VIRGO, Cascina Andreas Freise University of Birmingham.
Status of LIGO Data Analysis Gabriela González Department of Physics and Astronomy Louisiana State University for the LIGO Scientific Collaboration Dec.
Novemebr 5, 2006LSC meeting1 Virgo Update Prospects on detector performance and running schedules B. Mours.
1 Virgo commissioning: Next steps December 12 st 2005 Hannover, ILIAS-GWA WG1 Matteo Barsuglia, LAL/CNRS.
Advanced Virgo Optical Configuration ILIAS-GW, Tübingen Andreas Freise - Conceptual Design -
January 12, 2006ILIAS-WG3 Frascati1 Virgo+ & Advanced Virgo B. Mours With material from G. Losurdo, M. Punturo, A. Viceré and others.
LIGO-G D What can we Expect for the “Upper Limit” Run Stan Whitcomb LSC Meeting 13 August 2001 LIGO Hanford Observatory A Personal Reading of.
Status of coalescing binaries search activities in Virgo GWDAW 11 Status of coalescing binaries search activities in Virgo GWDAW Dec 2006 Leone.
1 LESSONS FROM VIRGO+ May 17th 2010 E. Calloni for the Virgo collaboration.
Searches for Compact Binary Coalescences in LIGO and Virgo data Gabriela González For the LIGO Scientific Collaboration and the Virgo Collaboration APS.
1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.
“Detector activities” after the IB upgrade Michele Punturo.
WG3 Report Michele Punturo Harald Lück. WG3 composition Co-Chairmen M.Punturo INFN Perugia, Italy H.Lück MPI für Gravitationsphysik, AEI, Hannover, Germany.
LIGO- G D E7: An Instrument-builder’s Perspective Stan Whitcomb LIGO Caltech LSC Meeting Upper Limits Plenary Session 22 May 2002 LIGO Livingston.
International Gravitational Wave Network 11/9/2008 Building an Stefan Ballmer, for the LIGO / VIRGO Scientific Collaboration LIGO G
LIGO-G M LIGO Status Gary Sanders GWIC Meeting Perth July 2001.
LIGO-G M Overview of LIGO R&D and Planning for Advanced LIGO Detectors Gary Sanders NSF R&D Review Caltech, January 29, 2001.
Status of Virgo GWDAW12 Status of Virgo GWDAW Dec Leone B. Bosi INFN and University of Perugia (Italy) On behalf of the Virgo Collaboration.
Status of Virgo a short update Michele Punturo. A bit of History July 29 – August –C6 run Duty cycle: Locking 89%, Science Mode 86% September.
LIGO-G Z LIGO Scientific Collaboration1 Welcome to the Hannover L-V Meeting Status of the LSC Dave Reitze University of Florida.
Advanced Towards Advanced Virgo Giovanni Losurdo – INFN Firenze Advanced Virgo Coordinator on behalf of the Virgo Collaboration.
SAT Plans for System R&D Signal Recycling Construction and A&I Short Suspension Upgrade Roberto Passaquieti Università di Pisa and INFN-Pisa AdV Review.
Sensitivity of Virgo E. Tournefier (LAPP-CNRS) LSC-Virgo week May 23 rd,2007 LIGO-G Z.
Advanced Advanced Virgo BASELINE DESIGN advanced Giovanni Losurdo – INFN Firenze Advanced Virgo Coordinator for the Virgo Collaboration.
Michele Punturo INFN Perugia and EGO 11st ELiTES meeting.
MG 11 - Berlin Virgo status Marie-Anne Bizouard (LAL-Orsay) on behalf of the Virgo Collaboration.
GWADW Elba Setting the stage GWADW2011, La Biodola Francesco Fidecaro Pisa.
Edwige Tournefier for the Virgo Collaboration The status of Virgo.
Harald Lück AEI Hannover. Thank you Science Team! You did a great job!
Michele Punturo EGO & INFN Perugia 1 2nd ET meeting, Erice Oct'09.
THE NEXT GENERATIONS OF GRAVITATIONAL WAVE DETECTORS (*) Giovanni Losurdo INFN Firenze – Virgo collaboration (*) GROUND BASED, INTERFEROMETRIC.
Michele Punturo INFN Perugia and EGO 1MGR13- ET.
The Quest for Gravitational Waves: a global strategy
Reaching the Advanced LIGO Detector Design Sensitivity
THE NEXT GENERATION OF GRAVITATIONAL WAVE DETECTORS
Commission II meeting – 7 March 2009
Is there a future for LIGO underground?
Evolution of the Virgo detector: The Virgo+ plans
Status of Virgo GWDAW Dec 13-16
Brennan Hughey for the LSC May 12th, 2008
Virgo Update B. Mours LIGO-G Z August 15, 2006 LSC meeting.
Jim Hough for the GEO collaboration
GEO HF Limits/Goals/Options…
Virgo Update – LSC meeting
Stan Whitcomb LSC meeting Hanford 15 August 2005
Update on Status of LIGO
P Fritschel LSC Meeting LLO, 22 March 2005
The views of Virgo collaboration groups on upgraded/advanced Virgo
Presentation transcript:

Status of Virgo A. Viceré INFN-Firenze – Università di Urbino

Oct 22, 2007LSC-Virgo meeting 2/10 Virgo Sensitivity Evolution during VSR1 Progress in the sensitivity during the run...

Oct 22, 2007LSC-Virgo meeting 3/10 Effect on the BNS horizon Significant improvement coming from noise mitigation in Hz band Due mostly to actuator noise reduction, magnetic coupling mitigation and work on supposedly acoustic noise sources, during the weekly commissioning breaks Horizon at the end of the run frequently up about 4.5 Mpc  Even somewhat better (dream horizon) when an electrical cut turned off some acoustic noise sources: work underway to identify the precise culprits More improvement is believed possible with more commissioning work

Oct 22, 2007LSC-Virgo meeting 4/10 VSR1 locked segments & duty cycle Science mode = 81% (locked mode 84%) ‏ Good fraction of long lock periods

Oct 22, 2007LSC-Virgo meeting 5/10 Commissioning is restarting Mysteries Controls: MICH/PRCL + ang Post-run calibration/parameter checks done over 1-15 th Oct period Now attack control and “mystery” noises  Priority to fix problems that would stay with us in Virgo+  Install as soon as available the thermal compensation system More details in Edwige's Tournefier talk, Tuesday afternoon

Oct 22, 2007LSC-Virgo meeting 6/10 From VSR1 to Virgo+ Target Virgo+ online at the same time of eLIGO (i.e. mid-2009) with a sensitivity useful for joint analysis Post VSR1/spring 2008:  Commissioning activity at low and intermediate frequency‏ mid 2008  Install the selected parts of the Virgo+ upgrade in a few bunches 2009  Global commissioning  Start the second Virgo Science Run (VSR2) around mid  Possibly interrupt the run for including V+ elements not introduced in first place and which can retire risk from Advanced Virgo  Keep running until ready for AdV installation in time to join Advanced LIGO

Jul 23, 2007LSC-Virgo meeting7 Virgo+ definition 2 nd Virgo+ review held on Oct Most modifications in good shape To be installed first half of 08  Thermal Compensation System  Increase of the laser power  New electronic Monolithic suspension sounds too late for the start of VSR2  Considering to start with the existing mirror/suspension  Keep developing the Mon. suspension for installation during V+  Suspension with steel wires is a backup option More information in Michele Punturo's talk, afternoon today

Oct 22, 2007LSC-Virgo meeting 8/10 Data taking during Virgo+ preparation Keep the priority for detector improvement and commissioning.  Perform short commissioning runs to assess the detector, though Take each opportunity to collect data in “astrowatch” mode.  Unattended night shifts, unattended week-ends when possible  The length of the short data taking not driven by the data analysis needs  All science mode data can be kept for reanalysis For externally triggered searches For CW analysis if deemed interesting by the CW search group The DA council may want to review the consequences of these plans  Very concrete questions like Do we share automatically science mode data, if any, during V+/eLIGO preparation? Or do we exchange only data around interesting ext/triggers?

Oct 22, 2007LSC-Virgo meeting 9/10 Goal  Sensitivity 10 times beyond Virgo design  Back online at horizon Main foreseen changes  Higher laser power  Signal recycling  Heavier mirrors  Better coatings  Beam geometry Major progress recently  Advanced Virgo Conceptual Design being released » What goes in AdV and why  First “cost estimate and project execution plan” (PEP) being released  Documents to be reviewed by funding institutions this November More details in Giovanni Losurdo's talk this afternoon Advanced Virgo

Oct 22, 2007LSC-Virgo meeting 10/10 Other news Collaboration composition » The Padova/Trento group has joined the Virgo Collaboration EGO Council approved funds for post-doctoral fellows dedicated to DA  6 two-year position reinforcing Virgo labs involved in DA (2 Burst, CBC: 1 CW, SB)‏ The Einstein Telescope (E.T.) Design Study proposal negotiated!  Joint European proposal (GEO + Virgo)‏  Underground, 30km beam pipe, Advanced suspension, Low thermal noise…  3.0 M€ from European Union over 3 years. Contract signed in the coming days DS: Design Study, PCP: Preparatory Construction Phase