River Corridor Closure Project 1 Safety Teamwork Disciplined Operations Integrity River Corridor Closure Project Safety Teamwork Disciplined Operations.

Slides:



Advertisements
Similar presentations
Short Service Worker Program
Advertisements

Safety Committee Orientation Environmental Energy Technologies Division November 18, 2011.
May 22, 2000AIHCE Orlando May 20-25, Integrated Safety Management (ISM) and Public Involvement A Tool to Build Public Trust With ES&H Management.
1 Integration of EMS and ISMS at the Idaho Cleanup Project Kliss McNeel November 1, 2006.
1 EM Update and Perspective David Huizenga Senior Advisor for Environmental Management 2012 DOE Project Management Workshop April 3, 2012.
A Materials Management Role in Environmental Restoration E.C. (Rick) Dahlin ILSI Integrated Logistics Services, Inc.
A Feedback and Continuous Improvement Tool to ACE Audit Readiness Keith S. Joy Quality Manager September 14, 2004.
Responsible CarE® Process Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
6/2/2015 What is Responsible Care ® ? A Canadian Chemical Producers’ Association initiative to continuously improve all aspects of the chemical industry’s,
Mike Scharfenstein CF Breakout - 12 November 2008 SLAC National Accelerator Laboratory 1 ES&H Status of Construction and Technical.
TRAINING AND DRILLS. Training and Drills Ensure A comprehensive, coordinated, and documented program as an integral part of the emergency management program.
project management office(PMO)
Departmental Initiative to Enhance Activity-level Work Planning and Control DOE and DOE Contractors Industrial Hygiene Meeting in Conjunction with the.
TRU Waste Processing Center Culture and Successful Implementation of an ISO Certified Environmental Management System Presented at the DOE ISM Conference.
Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation,
M. Scharfenstein - ES&H Coordinator 8 June 2009
Session No. 3 ICAO Safety Management Standards ICAO SMS Framework
Jhon Carilli Low-Level Radioactive Waste (LLW) Activity Lead
TVA’s Integrated Project Delivery for Nuclear Projects
INTEGRATION OF QA/ISM J. R. Yanek Chair, EFCOG ISM Working Group April 13, 2000.
ISM Workshop 1 Independent Oversight Perspectives Michael A. Kilpatrick Deputy Director Office of Security and Safety Performance Assurance.
Legacy Management Strategic Plan 2010 David Geiser Director, U.S. Department of Energy (DOE or Department) Office of Legacy Management (LM) November 2010.
Tank Operations Contract 1 Presenters: Fred Beranek Everett Gray Results of EFCOG/DOE Safety Culture Pilot Focus Group Assessment DOE ISMS Conference August.
1 DOE IMPLEMENTATION WORKSHOP ASSESSING MY EMS Steven R. Woodbury
ISMS Best Practices Workshop Initial Steps to Integrate HPI into ISMS Continuous Improvement CH2M HILL Hanford Group, Inc. September 12-13, 2006.
Environmental Restoration Projects Methods for Safety Culture Realization November 30, 2007.
ISM at the Savannah River Site Department of Energy Best Practices Workshop Lesson Learned Program Bill Luce, Manager Regulatory Services Washington Savannah.
1 D D O C U M E N T A T I O N & I N F O R M A T I O N S E R V I C E S 1 Achieving and Maintaining High Reliability through Human Performance.
MODULE “PROJECT MANAGEMENT AND CONTROL” ORGANIZATION AND ADMINISTRATIVE CONTROL SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
Cultivating a Safety Culture within a Creative Environment Frances Alston Manager, Environmental, Safety & Waste Management.
2007 ISM Workshop Session E-1 Panel Discussion on Best Practices and Lessons Learned Frank McCoy/Bill Webb.
Integrating ISMS Safety Concepts and Tools into the Design of CH2M HILL’s Demonstration Bulk Vitrification System September 12-13, 2006.
Nevada National Security Site (NNSS) Nevada Field Office (NFO) FY 2015 Status Report Milinka Watson-Garrett Analytical Services Manager U.S. Department.
Using ISMS Principles and Functions in Developing an ARRA Readiness Review Process Presented by Linda K. Rogers Assessments & Readiness Programs Manager.
ISM at the Savannah River Site Department of Energy Best Practices Workshop Facility Evaluation Board Steve Johnson, Manager Operations Evaluation Department.
ISM Annual Review and Declaration Lessons Learned CH2M HILL Hanford Group John McDonald.
Presented by: Rick Kendall, NA-17 Integrated Safety Management Best Practices Workshop September 2006; Denver Co. Assessment Criteria and Guidelines for.
Nuclear Security Culture William Tobey Workshop on Strengthening the Culture of Nuclear Safety and Security, Sao Paulo, Brazil August 25-26, 2014.
C O N T R A C T O R I N F O R M A T I O N E X C H A N G E LashCIE Presentation 1/98 1 Recent Accomplishments and Future Directions Dan Giessing U.S. Department.
State and Tribal Government Working Group November 12, 2008 FERNALD NATURAL RESOURCE DAMAGES SETTLEMENT.
Indoctrinating Subcontractors into the DOE Safety Culture and Expectations Daryl Schilperoort, STS, PMP Washington Closure Hanford Subcontract Technical.
River Corridor Closure Project Safety People Results End State and Final Closure Jeff A Lerch Manager, Long Term Stewardship June 1 and 2, 2006.
ISM at the Savannah River Site Department of Energy Best Practices Workshop Work Planning and Control Tim Flake, Principle Technical Advisor Maintenance.
Safety Culture Pilot Status Integrated Safety Management System Conference Don King, HAMTC Safety Representative Protecting the Columbia River RIVER CORRIDOR.
ISM WORKSHOP April 24-27, 2006 Albuquerque, NM Feedback and Improvement Assessment Results and Path Forward Michael N. Worley Office of Nuclear Energy.
Brookhaven Science Associates U.S. Department of Energy Leveraging the Management Review Process of ISO and OHSAS for Facility-level and Institutional-level.
Department of Energy Best Practices Workshop H-Completion Criticality Safety Improvement Phil Breidenbach, Manager Environment, Safety and Health and Mike.
Security Protective Force Brook Haven, NY DOE CONFERENCE Human Performance & Safety Observations Achieve Results.
1 IMPLEMENTING DOE ORDER ENVIRONMENTAL MANAGEMENT SYSTEMS U.S. Department of Energy Richland Operations Office.
EMS Implementation at Cranfield University EAUC Conference 1 st April 2009 Alan Fowler (Principal, ENVIRON) Roger Richards (SHE Manager, Cranfield University)
Transformation of a National Laboratory: ISMS Component Beth Streeper ISMS Program Manager Integrated Safety Management Workshop 2007 Brookhaven National.
ORDER ENVIRONMENTAL PROTECTION PROGRAM WORKSHOP OVERVIEW OF ORDER Larry Stirling
APPROACH TO A FULLY INTEGRATED PERFORMANCE ASSURANCE SYSTEM Integrated Safety Management Summit Knoxville, TN August 24-27, 2009 Presented by: Gary Grant.
Qualification & Training of Work Planners Steven K. Little Work Control Department Manager.
The Challenge of Getting What You Asked For Integrated Safety Management Summit Knoxville TN August 24-27, 2009 Presented By: Patrice McEahern HNF
Safety Culture Improvement Doug Fleming Update to CAC January 26, 2012.
River Corridor Closure Project 1 Safety Teamwork Disciplined Operations Integrity River Corridor Closure Project Safety Teamwork Disciplined Operations.
February 26 – March 1, 2012 ♦ Phoenix, Arizona Session # 90 Long–Term Stewardship at DOE’s Hanford Site Abstract #12575 Authors & Affiliation : Rick Moren:
Implementing Program Management Standards at Duke Energy.
DoD Lead Agent: Office of the Assistant Secretary of the Army (Installations and Environment) Department of Defense Voluntary Protection Programs Center.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
American Recovery & Reinvestment Act Office of Environmental Management Presentation to Regulators March 6, 2009 Cynthia V. Anderson, EM Recovery Act Program.
1 Getting to Green at the Department of Energy Progress on OMB’s Environmental Sustainability Scorecard Andy Lawrence Director, Office of Nuclear Safety,
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,
Overview – Guide to Developing Safety Improvement Plan
Overview – Guide to Developing Safety Improvement Plan
The Federal Oversight and Contractor Assurance System Directives Safety Culture Improvement Panel Meeting September 7, 2016 Patricia.
Logistics Solutions for the Warfighter
Charles Simpson Washington River Protection Solutions May 2018
Trending Requirements and Results
Presentation transcript:

River Corridor Closure Project 1 Safety Teamwork Disciplined Operations Integrity River Corridor Closure Project Safety Teamwork Disciplined Operations Integrity U.S. Department of Energy Richland Operations Office DOE Integrated Safety Management (ISM) Workshop November 29, 2007 Richland, Washington

River Corridor Closure Project U.S. Department of Energy Richland Operations Office Initiatives to Strengthen Worker Involvement, Feedback, and Safety Culture Ray Skwarek Director, SH&Q

River Corridor Closure Project 3 Safety Teamwork Disciplined Operations Integrity Environmental Restoration Disposal Facility (ERDF) Former Fuel Production and Laboratories (300 Area) 400 Area Hanford Site Boundary (586 sq. miles) Reactor Areas (100 Area) B/C KE/KW N D/DR H F Demolition of 486 facilities Project Scope Place three reactors into safe storage condition Remediation and closure of 370 waste sites Waste treatment, transportation and disposal (4 million tons of waste) Risk assessment and long-term stewardship

River Corridor Closure Project 4 Safety Teamwork Disciplined Operations Integrity How It Works Demolish Facilities Remediate Waste Sites Remove Surplus Facilities Cocoon Reactors Burial Ground Excavation Transport contaminated soil and debris to disposal facility Treat waste if required, then dispose Environmental Restoration Disposal Facility E _b

River Corridor Closure Project 5 Safety Teamwork Disciplined Operations Integrity WCH ISMS Implementation WCH ISMS Strategic Plan 4/07 DOE Phase II Verification Review 11/07 Review included Safety Culture elements as described in DOE M

River Corridor Closure Project 6 Safety Teamwork Disciplined Operations Integrity DOE M Identifies four supplemental safety culture elements: - Individual Attitude and Responsibility for Safety -Operational Excellence -Oversight for Performance Assurance -Organizational Learning for Performance Improvement

River Corridor Closure Project 7 Safety Teamwork Disciplined Operations Integrity Individual Attitude and Responsibility for Safety WCH Guiding Principles -Safety -Disciplined Operations -Team Work -Integrity -Integrated Work Control Process -Reinforce “Time Out” Process -Management Walkthroughs -Local Safety Improvement Teams (LSIT)

River Corridor Closure Project 8 Safety Teamwork Disciplined Operations Integrity Local Safety Improvement Teams (LSIT) 13 LSITs –A team at each jobsite Team Makeup: -Site Safety Reps -Craft / Union Reps -HAMTC Reps -Local Management Team -Stewards Monthly meetings with LSIT chairs and senior WCH management LSIT logbooks contain all safety improvement opportunities Open Logbook items discussed at each POD For CY 2007, 432 LSIT items identified, 412 closed on an average of 10 days

River Corridor Closure Project 9 Safety Teamwork Disciplined Operations Integrity LSIT Driven Improvements

River Corridor Closure Project 10 Safety Teamwork Disciplined Operations Integrity Operational Excellence CONOPS Manual and Tailored Approach Conduct of Operations Coaches Management presence in the field Strengthening Requirements Flowdown Training – ISMS, CONOPS, Safety Culture, Assessments Operational Training Program

River Corridor Closure Project 11 Safety Teamwork Disciplined Operations Integrity Operational Training Program Remediation work is highly dependent on procedural controls and people The Operational Training (drill) Program provides assurance that our procedures are workable and our people are proficient in their use Implemented via: –Practical exercises – Low impact refresher exercises for functional groups with coaching and mentoring –Complex drills – Focus on coordination, integration, and interaction of all project personnel and functions Minimal administrative burden by design Since Program initiation in April, 2007, 66 exercises/drills have been conducted; current rate is 6-8 per week Benefits: -Combats complacency / ‘can’t happen here’ attitude -Enhanced teaming -Procedure awareness and compliance -Exercise command and control -Reveals latent procedure and organizational weaknesses Integrating with formal EP Drill Program

River Corridor Closure Project 12 Safety Teamwork Disciplined Operations Integrity Oversight for Performance Assurance Enhanced training for all personnel performing assessments Grading & feedback provided for all assessments conducted FY08 RCC Project-wide integrated assessment schedule Established 30 Key Performance Indicators, reviewed monthly by WCH Senior Management First comprehensive performance analysis to be conducted in December New web-based Corrective Action Management system to roll out in January

River Corridor Closure Project 13 Safety Teamwork Disciplined Operations Integrity Organizational Learning for Performance Improvement Making progress in Key Areas: –CONOPS –Quality –Rigor in Requirements Implementation –Safety Culture Additional focus on Feedback and Lessons Learned

River Corridor Closure Project 14 Safety Teamwork Disciplined Operations Integrity Achievements and Progress Achieved 1.6 million hours without a lost or restricted workday No recordable injuries in the past 6 months Favorable trends in most other ESH&QA metrics Favorable DOE ISMS Phase II Validation Review in November Management Walkthrough program identified as a noteworthy practice by DOE Improved Environment for open communications