2015/10/261 Present members : KEK: J.Urakawa, T.Omori, T.Suwada, T.Kamitani, BINP, Novosibirsk :Pavel Logachev (BINP), V.M.Strakhovenko, --- Hiroshima:

Slides:



Advertisements
Similar presentations
A Capture Section Design for the CLIC Positron Source A. VIVOLI* Thanks to: L. RINOLFI (CERN) R. CHEHAB (IPNL & LAL / IN2P3-CNRS) O. DADOUN, P. LEPERCQ,
Advertisements

Overview of 300 Hz Conventional e + Source for ILC Truly Conventional Collaboration ANL, IHEP, Hiroshima U, U of Tokyo, KEK, DESY, U of Hamburg NIM A672.
Status of the experiment at KEKB for the hybrid targets Junji Urakawa instead of T.Takahashi KEK Positron Workshop Durham 28 October 2009 First test of.
Status of Undulator-based Positron Source Baseline Design Leo Jenner, but based largely on a talk given by Jim Clarke to Positron DESY-Zeuthen,
1 st October 2008 Réunion sur la contribution exceptionnelle de la FrancePositron generation L. Rinolfi (CERN) Contribution exceptionnelle de la France.
Conventional Source for ILC (300Hz Linac scheme and the cost) Junji Urakawa, KEK LCWS2012 Contents : 0. Short review of 300Hz conventional positron source.
Performance Studies on the Undulator Based ILC Positron Source Wei Gai ANL For ILC positron collaboration BAW II January 20, 2011,
16 th June 2008 POSIPOL 2008L. Rinolfi / CERN CLIC e + sources status L. Rinolfi with contributions from F. Antoniou, H. Braun, A. Latina, Y. Papaphilippou,
R.Chehab/Posipol2008/Hiroshima, june POSITRON SOURCES USING CHANNELING FOR ILC & CLIC R.Chehab, X.Artru, M.Chevallier, IPNL/IN2P3/CNRS, Universite.
Undulator Based ILC Positron Source Studies Wei Gai Argonne National Laboratory CCAST ILC Accelerator Workshop Beijing, Nov 5 – 7, 2007.
ILC e+ 源の現状 2 29-June-2015, ADI-J meeting T. Omori.
Status of Hybrid target R&D at KEK-LINAC T.Takahashi Hiroshima University LCWS/ILC10 Beijing Collaborators: V. Strakhovenko O. Dadoun, R. Chehab, A.Variola,
1 st October Linear Collider workshop The CLIC/ILC common work plan progress J. Clarke and L. Rinolfi.
1 Present members : KEK: J.Urakawa, T.Omori, T.Suwada, T.Kamitani, --- BINP, Novosibirsk :Pavel Logachev (BINP), V.M.Strakhovenko, --- Hiroshima: T.Takahashi,
1 Positron Target R&D at KEK Plan and Status AD&I Meeting 2009/8/27 KEK Hybrid Target Test at KEKB Linac Liquid Lead Target Test at ATF Linac Window Test.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
ASIA ILC R&D seminar Kympok National University, Taegu, Korea October 2008 R&D status of ILC Positron Source KURIKI Masao (Hiroshima/KEK) ‏ 구리기.
E + ソースの現状 大森 GDE 活動報告会 2008 年 6 月 23 日 シカゴ GDE meeting に向けて 大森 GDE 活動報告会 2008 年 10 月 6 日 かなりの数のスライドが、栗木さんが先ごろ大邱 "2nd Asia ILC R&D Seminar, Sep 29-30,
A.Variola Motivations…from D.Hitlin Talk The polarized positron source.
15 th October CLIC workshop The CLIC/ILC common issues for the sources Jim Clarke and Louis Rinolfi.
Global Design Effort 1 Sources Parallel Session Summary Jim Clarke STFC Daresbury Laboratory.
20 April 2009 AAP Review Global Design Effort 1 The Positron Source Jim Clarke STFC Daresbury Laboratory.
A Report from PosiPol2015 to AD&I meeting (10 Sep. 2015) Masao KURIKI (Hiroshima University)
ILC/CLIC e + generation working group Jim Clarke, STFC Daresbury Laboratory and Louis Rinolfi, CERN.
2nd ECFA LHeC Workshop; 1-3 September 2009, Divonne L. Rinolfi Possible e - and e + sources for LHeC 1 Thanks to O. Brüning, A. Vivoli and F. Zimmermann.
Hybrid Target R&D at KEK-LINAC T.Takahashi Hiroshima University 25 Septemer 2012 LCWS2012, Arlington, TX Collaborators: V. Strakhovenko O. Dadoun, R. Chehab,
2016/1/271 Present members : KEK: J.Urakawa, T.Omori, T.Suwada, T.Kamitani, BINP, Novosibirsk :Pavel Logachev (BINP), V.M.Strakhovenko, Hiroshima: T.Takahashi,
Status of Hybrid target R&D at KEK-LINAC T.Takahashi Hiroshima University March 2011 ALPG11 Eugene Collaborators: V. Strakhovenko O. Dadoun, R. Chehab,
22 th October 2010 IWLC Sources working group J. Clarke, T. Omori, L. Rinolfi, A. Variola Summary of Sources working group WG1 with contributions from.
Status of Hybrid target R&D at KEK-LINAC T.Takahashi Hiroshima University April KILC12 大邱廣域市 Collaborators: V. Strakhovenko O. Dadoun, R. Chehab,
Status of the Compton Experiment at the ATF TILC09 18-April-2009 T.Takahashi Hiroshima University for collaborators.
Capture and Transport Simulations of Positrons in a Compton Scheme Positron Source A. VIVOLI*, A. VARIOLA (LAL / IN2P3-CNRS), R. CHEHAB (IPNL & LAL / IN2P3-CNRS)
27 th May 2009 CLIC ACE meetingL. Rinolfi CLIC Main Beam generation Baseline configuration only L. Rinolfi for the CLIC Injector complex team.
Positron Sources for Linear Colliders* Wei Gai JPOS 2009, Jefferson Lab, March 26, 2009 * Acknowledgement of contributions from the ILC and CLIC e+ collaborations.
T.Takahashi Hiroshima /11/5 Tohru Takahashi Hiroshima University 高橋 徹 広島大学.
POSIPOL Berlin ILC/CLIC e + generation working group Wei Gai, ANL Louis Rinolfi, CERN Thanks to Omori-san for the coordination of the Webex meetings.
November 20, 2008 A. Brachmann Slide 1 Sources Session Summary LCWS 2008 A. Brachmann, J. Clarke.
Conventional source developments (300Hz Linac scheme and the cost, Part-II) Junji Urakawa, KEK PosiPol-2012 at DESY Zeuthen Contents : 0. Short review.
A_RD_6: Study and optimization of the power deposition density in new positron targets Masanori Satoh (Accelerator Laboratory, KEK) On behalf of collaborators:
ILC Positron Production and Capturing Studies: Update Wei Gai, Wanming Liu and Kwang-Je Kim Posipol Workshop, Orsay, France May 23-25, 2007 Work performed.
Positron Source for Linear Collider Wanming Liu 2013 DOE Review.
28 th August 2011 POSIPOL Workshop – IHEP-Beijing- ChinaL. Rinolfi Louis Rinolfi CLIC e + status.
Status of Hybrid target R&D at KEK-LINAC T.Takahashi Hiroshima University 06 Se0temer 2012 POSIPOL2012 DESY Zeutzen Collaborators: V. Strakhovenko O. Dadoun,
R.Chehab/FCPPL2010/Lyon1 AN HYBRID POSITRON SOURCE FOR ILC -Collaboration IN2P3-IHEP, with BINP, KEK, Hiroshima-U, CERN- X.Artru, R.Chehab, M.Chevallier.
ROBERT CHEHAB (IPNL/IN2P3/CNRS AND UNIVERSITE LYON 1) ON BEHALF OF ILC_IHEP_IPNL_POSITRON SOURCE GROUP ON BEHALF OF POSITRONS FOR LINEAR COLLIDERS: AN.
A.Variola LCWS07 DESY-Hambourg Posipol A.Variola LCWS07 DESY-Hambourg Some Posipol 2007 numbers ~ 55 inscriptions 3 days workshop 8 sponsors Different.
R.Chehab/crystalcollim/Roma1 INTENSE PRODUCTION OF e+e- PAIRS WITH RADIATION FROM CRYSTALS Robert CHEHAB IPNL/IN2P3/CNRS and Université Lyon 1.
1 Positron Source Configuration Masao KURIKI ILC AG meeting at KEK, 2006 Jan. Positron Source Configuration KURIKI Masao and John Sheppard  BCD Description.
Research on a new crystal-assisted positron source for the ILC
Part II of Summary for WG D/C
LHeC Sources Rinolfi CERN Thanks to:
POSIPOL 2016 at LAL/Paris, Sept Peter Sievers-CERN
Positron production rate vs incident electron beam energy for a tungsten target
Preliminary result of FCC positron source simulation Pavel MARTYSHKIN
Test of Hybrid Target at KEKB LINAC
AN HYBRID POSITRON SOURCE USING CHANNELING FOR ILC
CLIC e+ status Louis Rinolfi.
CLIC Main Beam Sources and their transfer lines
REVIEW OF POSITRON SOURCE R&D FOR LINEAR COLLIDERS
CLIC Undulator Option for Polarised Positrons
ILC/CLIC e+ generation working group
Research on a new crystal-assisted positron source for the ILC
ILC RDR baseline schematic (2007 IHEP meeting)
Summary for the Sources working group
CEPC Injector positron source
Lithium lens and window tests
with contributions from
A POSITRON SOURCE USING CHANNELING IN CRYSTALS FOR LINEAR COLLIDERS
CEPC Injector positron source
Presentation transcript:

2015/10/261 Present members : KEK: J.Urakawa, T.Omori, T.Suwada, T.Kamitani, BINP, Novosibirsk :Pavel Logachev (BINP), V.M.Strakhovenko, --- Hiroshima: T.Takahashi, M.Kuriki, --- IPNL: X.Artru, R.Chehab, M.Chevallier, --- LAL: A.Variola, O.Dadoun, --- CERN: L. Rinolfi, A. Vivoli, F. Zimmermann, --- Osaka University: S. Kashiwagi, G. Isoyama, --- Beam test plans at KEK ( window, liquid lead, hybrid target, undulator )

2015/10/262 New target system:Liquid Lead Target System (90% Pb, 10% (mass)Sn alloy, 300ºC) Window Candidates : BN, BC, Be, --- KEKB Beam Dump Setup BINP requested the windows test with KEKB beam. However, we kek decide this test is pending. Maybe, we do not do this. Window Issues : Broken by acoustic shock wave or thermal effects (temperature rise)

2015/10/ BN disks for windows Test samples after 1000 h exposition in liquid lead alloy at 300ºC (no any damage of brazing joint). Window thickness 4mm

2015/10/264 Liquid lead target test At ATF Linac End Liquid lead 300 ℃ 4.5m 10.3m 2.0m We kek decided to do the beam experiment with BINP prototype liquid lead target. Bend QQ

2015/10/265  function tuning range : 0.1m to 10m Bunch structure : 1 to 20 bunches/train Bunch charge : 0.5 to 2.0 x electrons/bunch Beam energy : 1.3GeV Repetition rate : 0.7 to 6.25Hz Usual normalized emittance : 10  mmmrad Beam size : 0.2 to 2.0mm Energy density on target to 48 x GeV/mm 2 Power deposit on target to 300 x GeV/mm 2 s Acceptable beam rep. rate? Beam Parameters What is meaningful beam experiments for ILC liquid target? This is under discussion.

2015/10/266 Scheme of the prototype of liquid lead positron production target. Driving motor Rotating vacuum feedthrough Vacuum pump Vacuum tank of the system Cog-wheel pump Liquid lead transport tubes Target head Earliest arrival of this will be Nov. at KEK. Need BINP quick contribution.

2015/10/267 7 Cog-wheel pump test bench is in continuous run (20000 h) with liquid lead jet. 90% Pb, 10% Sn alloy at 300ºC. Liquid lead jet in vacuum

2015/10/268 PosiPol ( x10 12 GeV/mm, 40kW) in the case of Undulator scheme ( x10 12 GeV/mm, 290kW) in the case of 1msec ILC like beam, (2 x10 12 GeV/mm 2, 2 kW) in the case of new scheme. (0.7 x10 12 GeV/mm 2, 30kW) in the case of X-band LC with three targets Need the data for Titanium Alloy. [???]

2015/10/269 Hybrid Target Test at KEKB Linac end

2015/10/2610 At Beam Switchyard at the KEKB Injector Linac e Beam Thin crystal bend gamma Thick target Positron detector

2015/10/2611 Beam Switchyard at the KEKB Injector Linac Experimental Hall Beam Line/e+ Production 2m ~5m e- beam Beam Dump To KEKB To 2.5GeV PF Linac Beam Switching Yard

2015/10/2612 Experimental Studies at KEKB Linac e+ momentum acceptance  P/P~2.4% (FWHM) Geometrical acceptance  ~1msr at Pe+=20MeV/c. e+ targets tested Tungsten crystal (W c ), Diamond, Si, etc. Beam charge ~0.1/bunch 4, 8 GeV e- 8 GeV e- Target configuration for Wc Target configuration for Diamond, Si

2015/10/2613 Experimental Studies at KEKB-Linac end

2015/10/2614 Advanced positron capture device 1. BINP Flux Concentrator magnet (FC) This is ongoing with the collaboration of KEKB and BINP. However, this FC can accept 1  sec beam pulse, not 1msec. Peak field ~7T 2. BINP Liquid Lithium Lens Need a design work for ILC positron beam by BINP. Just need the design, Hardware R&D is impossible at present.

2015/10/2615 Prototype of FC

2015/10/ m 11.8m 2.0m Bend 5.0m for undulator test Undulator test with beam at ATF Linac end

2015/10/2617 R&D Schedule not yet decided. 1. BINP starts the manufacturing of windows (BN, BC and Be) for test at KEKB ring in However, this plan is pending. 2. Systematic experimental studies on Liquid 90%Pb+10%Sn target system with BN window and the hybrid target system will start from late We are still discussing what kind of measurements are necessary for ILC target system and detail schedule. 3. Beam test with UK 4m long undulator at ATF Linac end This is under discussion. We need careful beam quality measurement at the end of ATF Linac.