PD5: Detector Integration / Machine Detector Interface T. Markiewicz/SLAC 15 May 2014 SiD Meeting / AWLC Fermilab Summary.

Slides:



Advertisements
Similar presentations
Kitakami IR Access Discussions T. Markiewicz/SLAC 13 May 2014 SiD Meeting / AWLC Fermilab.
Advertisements

SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
Ideas and Speculations for the Headon Extraction Line L. Keller Oct. 19, Give up the 3.5 m Separation between the Charged Dump and the Incoming.
Global Design Effort Goals and Introduction Andrei Seryi, SLAC, September 17, 2007.
Summary of wg2a (BDS and IR) Deepa Angal-Kalinin, Shigeru Kuroda, Andrei Seryi October 21, 2005.
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
November 07, 2006 Global Design Effort 1 Beam Delivery System updates BDS Area leaders Deepa Angal-Kalinin, Hitoshi Yamamoto, Andrei Seryi Valencia GDE.
Philip Burrows MDI session, LCWS06 Bangalore, 10/3/06 SiD MDI Issues Philip Burrows John Adams Institute Oxford University Thanks to: Marty Breidenbach,
SID Engineering Marco Oriunno (SLAC), Jan CLIC Workshop, CERN Toward the TDR.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
1 Alternative assembly option of ILD Y.Sugimoto 2010/10/18 ILD Integration
Experimental hall in Japanese mountain site Y. Sugimoto 1.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
ILC CFS AD&I Daresbury Lab Summary J.Osborne / V.Kuchler / A.Enomoto.
Global Design Effort - CFS SiD Collaboration Meeting - SLAC 1 VERTICAL ACCESS ILC IR LAYOUT for SiD and ILD CONVENTIONAL FACILITIES AND SITING.
CLIC main detector solenoid and anti-solenoid impact B. Dalena, A. Bartalesi, R. Appleby, H. Gerwig, D. Swoboda, M. Modena, D. Schulte, R. Tomás.
LCWS14 - Belgrade October 6-10, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, M Miyahara, J Osborne.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
LINEAR COLLIDER COLLABORATION Designing the world’s next great particle accelerator Detector Hall Configuration Overview New baseline (Hybrid A’) proposed.
Beam Commissioning Marco Oriunno (SLAC), May 14, 2014 ALCW 2014, Fermilab Engineering Issues.
Si D in 14mrad/14mrad/z=0 ILC T. Markiewicz/SLAC SiD Advisory Group 14 August 2006.
Report from ILC CFS and Cryogenics Workshop
ILC Beam Delivery System / MDI Issues for LCC-phase (~
MDI DBD Editors Report Tom Markiewicz/SLAC SiD Collaboration Meeting, SLAC 22 August 2012.
A. Hervé - 17 Oct CLIC-Workshop CLIC Workshop: 17 Oct. 07 Interaction Region Engineering at ILC Push-Pull Option A. Hervé/CERN.
Philip Burrows Snowmass 2005: SiD Concept Plenary, 15/8/05 SiD and MDI issues Philip Burrows Queen Mary, University of London Thanks to: Toshiaki Tauchi,
Interaction Region & IR integration EDR Planning Tom Markiewicz/SLAC SLAC BDS Kick-Off-Meeting 13 October 2007.
BDS: 1 October 13, 2007 BDS KOM EDR planning discussion Andrei Seryi October 13, 2007.
Strategy of detector solenoid construction Yasuhiro Sugimoto KEK 1.
1 O. Napoly ECFA-DESY Amsterdam, April 2003 Machine – Detector Interface : what is new since the TDR ? O. Napoly CEA/Saclay.
ILC D RAFT P ROJECT S CHEDULE K LYCLUSTER 500GeV K Foraz & M Gastal ILC Mechanical & Electrical Review and CFS Baseline Technical Review Many thanks to.
Global Design Effort Working Group C Conventional Facilities Parallel Session IRENG07 V. Kuchler, A. Enomoto, J. Osborne September 19, 2007.
ILC-GDE Meeting Beijing Feb Effect of MDI Design on BDS Collimation Depth Frank Jackson ASTeC Daresbury Laboratory Cockcroft Institute.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Construction Schedule for Baseline and Hybrid A’ Configuration 1 5 th September, 2014 J-POWER MDI-CFS Meeting - Ichinoseki City, JAPAN.
Philip Burrows MDI Panel Meeting 15/08/06 Philip Burrows John Adams Institute Oxford University SiD and IR/MDI Issues.
COMPENSATION OF DETECTOR SOLENOID FIELD WITH L*=4.1M Glen White, SLAC April 20, 2015 ALCW2015, KEK, Japan.
ILD and SiD in Japanese site (from discussions in SiD/ILD E/D Interface Working Meeting) Yasuhiro Sugimoto, Marco Oriunno 2011/12/15 SiD
Global Design Effort Progress and Plans of the Beam Delivery Systems and Machine Detector Interface WG Daniel Schulte (CERN), Brett Parker (BNL), Andrei.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
Experimental hall in Japanese mountain site 2011/11/30 Yasuhiro CFS Webex meeting 1.
BDS/MDI Deepa Angal-Kalinin Andrei Seryi AD&I Meeting, DESY, May 29, 2009.
1 O. Napoly ECFA-DESY Amsterdam, April 2003 Machine – Detector Interface : what is new since the TDR ? O. Napoly CEA/Saclay.
BDS Status Update Glen White, SLAC July ADI Fuze Meeting.
AWLC14 - FERMILAB May 12-16, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, A Enomoto, J Osborne.
Accelerator WG 5 summary Interaction region, ATF2 and MDI Deepa Angal-Kalinin, Lau Gatignon, Andrei Seryi, Rogelio Tomas IWLC
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
ILC BDS Commissioning Glen White, SLAC AWLC 2014, Fermilab May 14 th 2014.
Octobre LAL Orsay Report from the IRENG07 workshop at SLAC W. Lohmann, DESY from Septembre 17 – 21, ~ 100 participants - plenary and parallel sessions.
Baseline BDS Design Updates Glen White, SLAC Sept. 4, 2014 Ichinoseki, MDI/CFS Meeting.
1 Update of detector hall in mountain regions Y.Sugimoto in Granada.
Experimental Hall in Mountain Regions
Detector Hall Design and Cost Information CONVENTIONAL FACILITIES
Updated Design of Detector Hall
Introduction and Meeting Objectives
Yasuhiro Sugimoto 2012/2/1 ILD integration meeting
Marco Oriunno (SLAC), March 12, 2014 MDI WG
Experimental hall design in Japanese site
Accelerator and Experiment Interface Session: LS2, LS3
Hybrid Access Optional Study
Detector hall in mountain regions
CLIC-ILC BDS & MDI work.
ILC CFS AD&I Daresbury Lab Summary
MACHINE DETECTOR INTERFACE WORKING GROUP STATUS
Detector hall in mountain regions
Interaction Region Design Options e+e- Factories Workshop
Kitakami IR Access Discussions
A 12-min Introduction to The ILC Machine Detector Interface and SiD
IR/MDI requirements for the EIC
Crab Crossing Named #1 common technical risk (p. 6 of the report)
Presentation transcript:

PD5: Detector Integration / Machine Detector Interface T. Markiewicz/SLAC 15 May 2014 SiD Meeting / AWLC Fermilab Summary

2 Outline Parallel sessions were held with combinations of the CFS and BDS groups Updates to the IR Access design shown by Harrison & Yamamoto on Monday New information that may affect detector assembly & ideas for next iterations of IR access design Session to discuss commissioning scenarios & working decision Tidbits from just-beginning BDS/AD&I discussions & presentations that touch the MDI & may be discussion points at the next LCWS

3 Photo of Assembly area & IR access tunnel mouth for the baseline Horizontal Tunnel only option PHOTO DELETED AS REQUESTED BY CONFERENCE ORGANIZERS

4 Photo of Split Level Assembly area for Hybrid Access: SiD on lower pad that feeds tunnel mouth ILD on upper pad over 18m shaft PHOTO DELETED AS REQUESTED BY CONFERENCE ORGANIZERS

5 Elevation & Plan Views of Hybrid Tunnel/Shaft Access

6 CMS-sized hall provided for ILD with a small side-space for the few times SiD may use the 18m shaft & gantry rather than the tunnel

7 SPS N-area hall is basis for SiD Assembly Hall Tunnel mouth directly outside hall

8 Plan View of Underground IR Hall Note Tunnel Access & Enlarged Assembly Area on SiD Side Tunnel Entrance

9 Heavy Equipment Transport in Japan Advice to keep delivered loads < 80T will require both SiD and ILD to rethink their assembly model A study of the exact routes, with bridges in tunnels, connecting the Kitakami site to the nearest port & railway depot are in progress.

10 SiD request to study alternate variant Parallel hall at same grade with second 6-8m access shaft over SiD “garage” Tunnel grade increased & diameter reduced for “excavation only”

11 BDS Commissioning Three possible engineering options: 1.w/ Detector 2.w/o Detector, only QF1 3.w/o Detector, QD0 and QF1 Support wall Shield wall with embedded: QD0+movers+cryo+power Specialized instrumentation, readout, … Working decision to plan to commission w/ a detector Revisit if detectors completion much later than accelerator Will not plan for blocks, block storage, spare QD0s, separate cryo- system, etc.

12 BDS Errata1: Common L* Strongly desired BDS Group & AD&I management plan to insist on a common L* for ILD and SiD Example: Okugi-san finds, after tuning for 3.51m L* cannot find a solution for 4.5m L* better than:

13 BDS Errata2: “SB2009” IP Parameter Study has consequences in the extraction line Studies of the small sig_x IP parameter set to recover luminosity after N_b reduced x2 are beginning 3kW 63kW17kW Example: Power on last extraction line collimator before dump window 2007 RDR 2013 TDR

14 BDS Errata3: Large L* Studies have begun Multi-parameter problem: collimation depth, synchrotron radiation backgrounds, tunability, tolerances, etc. need study

15 BDS Errata4: Suggestion from Brett Parker that QD0 design can be optimized for lower diameter package Design work on eRHIC IR leads Brett to think, that with design work, it will be possible to increase the radius of the “bucking winding” and have the extraction line shoot the gap between main windings and the bucking winding resulting in a more compact package. If possible, could possibly: Reduce crossing angle: - DID less important - Crab cavity less critical Reduce L* Current design: “Bucking Winding” null fringe field on axis of extraction line and vice- versa Hope for a conclusion by time of the Belgrade meeting