Instituto de Astrofísica de Canarias 1 Artemio Herrero 1 Fast Conclusions Artemio Herrero.

Slides:



Advertisements
Similar presentations
Conference xxx - August 2003 Fabrizio Gagliardi EDG Project Leader and EGEE designated Project Director Position paper Delivery of industrial-strength.
Advertisements

Trustworthy: to have belief or confidence in the honesty, goodness, skill or safety of a person, organization or thing.
Research Proposal Requirements and Networking Workshop ESTEC, Noordwijk, 13 September 2004.
Technology Management and Policy / RdN ROLE AND NATURE OF TECHNOLOGY POLICY MANAGEMENT IN ENGINEERING SCHOOLS  Dr. Richard de Neufville  Professor of.
November 2004 The Research Infrastructures in FP7 DG RTD – Directorate ‘Structuring ERA’
The evolution of European security research and innovation programmes: changing purposes and rationales Jean-Marc Suchier ETTIS R&I strategies and policy.
Extremely Large Telescopes and Surveys Mark Dickinson, NOAO.
OPTICON Board Meeting, Porto, OPTICON WP4 Interferometry Status Report D. Mourard presented by A. Chelli.
SUGGESTIONS From White Papers received as of 10/06/14.
NGAO System Design Review Response Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max for NGAO Team SSC Meeting June 18, 2008.
LGS AO Operations Transition: Introduction to Meeting April 15, 2005.
The Path to NGAO Core Science Requirements Claire Max and Liz McGrath NGAO Team Meeting September 11-12, 2008.
AHEAD Meeting, Roma 9-10 February 2009 NA4: Co-ordination of Earth-based observations to support and complement space missions José M. Torrejón (UA)
AHEAD system design facility (SYSDEF) LACK of flight opportunities is our MAJOR problem.
Future of Astronomy Astronomy 315 Professor Lee Carkner Lecture 25.
Planning for the Virtual Observatory Tara Murphy … with input from other Aus-VO members …
Providing Access for US Astronomers to the Next Generation of Large Ground Based OIR Telescopes 1.Scientific Potential 2.Current Design Efforts 3.Complementarity.
DATA PRESERVATION IN ALICE FEDERICO CARMINATI. MOTIVATION ALICE is a 150 M CHF investment by a large scientific community The ALICE data is unique and.
1 The Thirty-Meter Telescope (TMT) Richard Ellis, Steele Professor and California Institute of Technology TMT Board member Michael Bolte, Director, University.
Telescopes. Close your eyes. Create a picture in your mind of a telescope. Think about: What does a telescope look like?
Our Mission The OPTICON Integrated Infrastructure Initiative brings together all of Western Europe's owners and operators of large observatories and data.
Keck Observatory and The System: Astro2010 Activities Mike Bolte, Shri Kulkarni, Taft Armandroff Keck Strategic Planning Discussions September 18, 2009.
Issues in international collaboration in large astronomical projects Richard Schilizzi Chair, IAU Working Group on Future Large Scale Facilities.
Enabling a GSMT for the US Community: AURA’s Proposal to the NSF Stephen E. Strom 04 June, 2004 Tucson, AZ National Optical Astronomy Observatory Tucson.
E. Solano Centro de Astrobiología (INTA-CSIC) I.P. Observatorio Virtual Español El Observatorio Virtual: una infraestructura básica para la investigación.
©Ian Sommerville 1995 Software Engineering, 5th edition. Chapter 31 Slide 1 Process Improvement u Understanding, Modelling and Improving the Software Process.
Future of Astronomy Astronomy 315 Professor Lee Carkner Lecture 23.
1 New Frontiers with LSST: leveraging world facilities Tony Tyson Director, LSST Project University of California, Davis Science with the 8-10 m telescopes.
AAAC Meeting February, New GSMT Role NSF has asked that AURA/NOAO act as NSF’s "Program Manager" for the GSMT Technology development effort at a.
Computing for ILC experiment Computing Research Center, KEK Hiroyuki Matsunaga.
Panel Discussion Part I Methodology Ideas from adult MR brain segmentation are used in neonatal MR brain segmentation. However, additional challenges.
ESPON Seminar 15 November 2006 in Espoo, Finland Review of the ESPON 2006 and lessons learned for the ESPON 2013 Programme Thiemo W. Eser, ESPON Managing.
Our Mission The OPTICON Integrated Infrastructure Initiative brings together all of Western Europe's owners and operators of large observatories and data.
Spitzer Space Telescope Lisa Storrie-Lombardi Spitzer Science Center, Manager & Asst. Director for Community Affairs Implementing Portals of the Universe:
A new start for the Lisbon Strategy Knowledge and innovation for growth.
1 Enabling technologies and constraints for software sharing in large astronomy projects G.Chiozzi – ESO, Germany A.Bridger – UK Astronomy Technology Centre,
OPTICON is funded by the European Commission under Contract no RII3-CT Site Characterization of the Canarian Observatories: Different activities.
From Technology Transfer to Technology Sharing and Alliances for Mutual Advantage Jatinder (Jeet) N. D. Gupta Eminent Scholar of Management of Technology.
October 2011 David Toback, Texas A&M University Research Topics Seminar 1 David Toback Texas A&M University Mitchell Institute for Fundamental Physics.
European small and medium sized telescopes Paul Murdin Particle Physics & Astronomy Research Council.
Report from Subaru Advisory Committee The main issues of the current SAC: ・ Extensive (strategic) program of Subaru telescope ・ International collaborations.
© Mujtaba, 2007 Workforce Diversity Management Dr. Bahaudin G. Mujtaba.
ATTRACT – From Open Science to Open Innovation Information Sharing Meeting Brussels, June 19, 2014 Markus Nordberg (CERN) Development and Innovation Unit.
BESAC Dec Outline of the Report I. A Confluence of Scientific Opportunities: Why Invest Now in Theory and Computation in the Basic Energy Sciences?
“From the Ground Up: Balancing the NSF Astronomy Program” Senior Review Major Recommendations November 2006 Implications for GSMT.
Bob Jones Technical Director CERN - August 2003 EGEE is proposed as a project to be funded by the European Union under contract IST
Australia’s Path to a Giant Telescope Matthew Colless MNRF Symposium 7 June 2003.
A global approach to ELT instrument developments J.-G. Cuby for the French ELT WG.
What the Data Products Program Offers Users Todd Boroson Dick Shaw Presentation to NOAO Users Committee October 23, 2003.
A Detector Upgrade for LDSS3 Mike Gladders Jacob Bean (on the phone) with Andreas Seifart, Josh Frieman, John Carlstrom.
EVOLUTIONARY THEORY AS A TEACHING TOOL IN UNDERGRADUATE SCIENCE COURSES FOR ELEMENTARY EDUCATION MAJORS: SCIENTIFIC INQUIRY VERSUS INTELLIGNET DESIGN “THEORY”
Future of Astronomy Astronomy 315 Professor Lee Carkner Lecture 25.
Why is the VLT very efficient? Fernando Comerón On behalf of Francesca Primas and Martino Romaniello.
CISB444 - Strategic Information Systems Planning Chapter 3 : Developing an IS/IT Strategy: Establishing Effective Processes Part I.
1 Framework Programme 7 Overview. 2 The Programmes within FP7 IDEAS European Research Counsel ERC PEOPLE Marie Curie Measures Initial Training Life-long.
EGEE is a project funded by the European Union under contract IST EGEE Summary NA2 Partners April
FIRST LIGHT A selection of future facilities relevant to the formation and evolution of galaxies Wavelength Sensitivity Spatial resolution.
Faculty meeting - 13 Dec 2006 The Hubble Legacy Archive Harald Kuntschner & ST-ECF staff 13 December 2006.
Nature of Science. Purpose of Science ► Science is the pursuit of explanations of the natural world.
GSMT SWG Meeting November, New GSMT Role NSF has asked that AURA/NOAO act as NSF’s "Program Manager" for the GSMT Technology development effort.
Science Method. 1.3 The Scientific Method At the end of this section, you should be able to answer the following questions: What are the inquiry skills.
© 2006 Open Grid Forum Geoffrey Fox Board Review April OGF eScience Function.
Experience from H2020 Proposals (a personal assessment)
STRATEGIC ACADEMIC UNIT “PEOPLE & TECHNOLOGIES”
Community Science Updates
EIROforum is a partnership between eight of Europe’s largest intergovernmental scientific organisations Previously.
CONSIDERATIONS ON METHOD
Scientific Potential Current Design Efforts Complementarity with JWST
Program Discontinuance versus Program Discontinuance
Making it Work for the Bottom of the Pyramid
Presentation transcript:

Instituto de Astrofísica de Canarias 1 Artemio Herrero 1 Fast Conclusions Artemio Herrero

Instituto de Astrofísica de Canarias 2 Artemio Herrero First conclusions Wine and cheese is a fine thing! GTC is operating, bravo! 2

Instituto de Astrofísica de Canarias 3 Artemio Herrero 3 Question 1(1) What should be the role of the 8-10m telescopes in the era of the ELTs and the JWST? –What should be the scientific strategy?  Do they have to nurture the ELTs and the JWST? –Dedicate a significant amount of observing time to preparatory programs  Do they have to collect as many results as possible? –Dedicate as much observing time as possible to own, self- contained programs  Do they have to try to benefit from the ELTs and the JWST? –Try to exploit your advantages to keep competitive: optimize your system efficiency and reliability, multiply your instrumental capabilities or specialize, take adva

Instituto de Astrofísica de Canarias 4 Artemio Herrero Question 1 (2) A variety of opinions: –W. Smith:  Small(er) telescopes play an important role in the era of 8-10m telescopes  choose one of the possible organization models according to your conditions (8-10m telescopes provide examples of succesful strategies in all cases) –T. Armandroff: a mixture of all three, according to scientific merit –B. Leibundgut: ELTs haven’t started yet. Do your own science now and do it as good as you can.  Top level science uses all available resources (including KELT, Phil Charles)  8-10m telescopes as workhorses for the ELTs (when they are ready) –T. Henning: ELTs will need time, it’s not only about telescope construction, it’s also about instruments 4

Instituto de Astrofísica de Canarias 5 Artemio Herrero Question 1 (3) –J.R. Roy: “8-10m telescopes have a 10 year window of scientific freeway ahead” –P. Charles: push 8-10m telescopes capabilities to their limits and the next questions will have to be answered with the ELT 5

Instituto de Astrofísica de Canarias 6 Artemio Herrero Conclusion 1 do your best science now, and in a natural way projects will take the way of the ELTs when these become available (or are close to) 6

Instituto de Astrofísica de Canarias 7 Artemio Herrero Science topics (1) B. Leibundgut: we are seen the Golden Age of Astrophysics –Full wavelength coverage possible, large archives available, other communities (astroparticles) joining us, public interest… 7 Golden Age

Instituto de Astrofísica de Canarias 8 Artemio Herrero Science topics (2) Planets and planetary/stellar disks have dominated the presentations (M. Greenhouse: interest shifting from discovery to formation) –Instrumentally, the counterpart is the large interest on AO shown by all observatories (which is applied in many other interesting problems)  Major efforts all around the world  One of the main drivers for TMT –Jerry Nelson insisted in the importance of angular resolution and Taft presented evidence LGS beating NGS  In some cases (VLT, LBT, Keck) interferometry offers one step further 8

Instituto de Astrofísica de Canarias 9 Artemio Herrero Science topics (3) But many other: galaxy formation and evolution, dark M&E, GRBs and SN, BH, reionization epoch… –Science cases are very similar through different documents  Small differences in details between space/ground based –Reflects in common interests:  Multiplexing – multiwavelength capabilities, efficiency… –Also: interesting sciences cases made available by technological developments: –Time domain: high temporal resolution (SALT, LSST) –LBT combination of spectroscopy and interferometry –Microshutter array in NIRSpec –Traffic jam at L2… 9

Instituto de Astrofísica de Canarias 10 Artemio Herrero Conclusion 2 We have seen interesting and important science cases covering all areas of astrophysics. It’s very difficult to predict which will be the main drivers in ten years Be prepared for the unexpected (T. Henning, not only in science) 10

Instituto de Astrofísica de Canarias 11 Artemio Herrero Data archives & mining Large CCDs are having a very important impact on Astronomy (W. Smith and T. Tyson, comparison of glass vs CCD growth) Data handling may be a problem when we reach the dimensions of the LSST or SASIR  Data processing on real time  Billions of galaxies, thousands of transient alerts per night Archives becoming more and more important (W. Smith)  Observatories are doing real efforts to build up archives  W. Smith: 0,5 Pb currently in the US, increasing at 250 Tb/yr (LSST: 3Tb/hour)  P.Charles: data should be processed and science-ready  A. Giménez: VO and data mining importance 11

Instituto de Astrofísica de Canarias 12 Artemio Herrero Conclusion 3 Important resources and efforts will go in the immediate future into data handling and archives, and related software and infrastructure When planning our telescopes we have now to pay attention not only to instruments, but also to archives and data handling 12

Instituto de Astrofísica de Canarias 13 Artemio Herrero 13 Question 3 Shall the 8-10m telescope communities develop joint scientific projects? –Dedicating a fraction of observing time in more than one telescope to a given project, either ELT or JWST orientated, or not –Having meetings (on a regular basis?) to discuss such projects In particular, should there be an instrumentation collaboration policy? –Shall the telescopes develop common instrumentation projects? –Shall this matter be discussed within the “8-10 m telescopes collaboration forum”?

Instituto de Astrofísica de Canarias 14 Artemio Herrero Collaboration (1) Several collaborations or possible collaborations or complementarities were mentioned  Gemini and Keck (LGS contract)  Subaru-Keck-Gemini (time interchanging)  GTC with LSST, GMT and SASIR  SASIR with LSST –All with JWST and ESA missions (A. Gimenez and M. Greenhouse emphasized this) Actually, any combination is possible –However, there are risks (J.R. Roy, T. Henning)  Showed in partnership difficulties (assymetries, need clear goals, different interest…)  C. Gallart: europeans and americans do not really collaborate in the ELT effort (as f.e. with HST and JWST) 14

Instituto de Astrofísica de Canarias 15 Artemio Herrero Collaboration (2) J.M. Rodriguez Espinosa: we should compete on science and not on instruments. We should built similar instruments –P. Charles: agree, although the situation may be different for workhorse instruments and specific instruments M. Tarenghi: we should collaborate also in our relations to industry, could make a lot of savings 15

Instituto de Astrofísica de Canarias 16 Artemio Herrero Conclusion 4 There is a real interest in collaboration Collaborations are not easy to stablish. People (particularly observatory directors) should talk often to each other –I personally see regular (or semiregular) meetings to try to find new ways as very positive Collaborations will bring an increasing reward for the astronomical community We are a small community more and more left on our own with industry and the competition with other large communities: organization an collaboration are essential 16

Instituto de Astrofísica de Canarias 17 Artemio Herrero 17 Question 4 (1) Do we have all we need to efficiently use our telescopes? –People  Students from today will be young, motivated professionals when the ELTs operate –If the few big telescopes and top science projects are done more and more in service mode, how are we going to ensure the training of our young observers?

Instituto de Astrofísica de Canarias 18 Artemio Herrero Access and training (1) Queue-mode more demanded and more efficient than classical mode (J.R. Roy) We need to assure that young people are well trained –Training on 2-4m telescopes (B. Leibundgut) –Several ideas to training people (M. Iye, J.R. Roy) on larger telescopes (f.e., Visiting Queue Astronomers) –Training mainly in the lab (T. Tyson) with instrument development –M. Tarenghi: 8-10m telescopes should be test bench for new technology at ELT, as the NTT for the VLT 18

Instituto de Astrofísica de Canarias 19 Artemio Herrero Access and training (2) Projects (and papers) are carried out by a larger number of scientists –“The end of the lone astronomer” (W. Smith) In general, this is positive, but –The lack of personal contributions and the hierarchical structure may push young talented people to other scientific areas (T. Henning) –Is this related to the lack of people to work on the projects pointed out by C. Gallart? 19

Instituto de Astrofísica de Canarias 20 Artemio Herrero Conclusion 5 There is agreement on the need of training people, although there are different views on how serious is the problem and the ways to attack it (probably all ways are valid) And there is agreement in the need of attracting the young people 20

Instituto de Astrofísica de Canarias 21 Artemio Herrero 21 Question 5 Who is driving the construction of the ELTs, astronomers or engineers? How many ELTs can be expected to be built? Are we envisioning the end of the large telescope business? i.e., will there be still larger telescopes built or these will the be latest due to funding or to technology?

Instituto de Astrofísica de Canarias 22 Artemio Herrero 22 ELT Construction (1) Who is driving the construction of the ELTs, astronomers or engineers? –M. Tarenghi, quoting R. Giacconi: “Science, technology and politics are required, and in the right order. And there is only one right order: science, technology and politics.”  Question settled

Instituto de Astrofísica de Canarias 23 Artemio Herrero 23 ELT construction (2) How many ELTs can be expected to be built? 3 planned, perhaps 4 possible –15 years ago, there were no 8-10m telescopes, now there are 10 (plus LSST) –Time will make construction cheaper  This would allow complete access to the N and S hemispheres to american/japanese/european and other involved communities

Instituto de Astrofísica de Canarias 24 Artemio Herrero 24 ELT Construction (3) Are we envisioning the end of the large telescope business? –J.R. Roy: No!!  Example: OWL –Also examples: SASIR, GMT, even GTC –However, may be we need to change the way of constructing them  As radioastronomers did with ALMA  As segmented telescopes did with Keck

Instituto de Astrofísica de Canarias 25 Artemio Herrero Conclusion 6 We have no yet total guarantee that the ELTs will be built, but we should keep ambitious: ELTs do not have to be single entities, nor do they represent the end of the way. We will find, if needed, new ways to look deeper and see better 25