Replacement of existing rock groynes and other in river restoration works to improve rapids and habitats in the River Wye at Symonds Yat.

Slides:



Advertisements
Similar presentations
Wetland Types, Functions, and DCM’s GIS Wetland Data
Advertisements

Land Resources. Why good management is important Food Water Leisure Reduce impact of high population (eg pollution, global climate change)
Bewdley Flood Alleviation Scheme. Bewdley, November 2000.
Planning for fish bearing waters between Glen Canyon Dam and Lake Mead.
Community and Enterprise Resources Hamilton High Parks Restoring an ancient treescape 31/10/2014.
Public Land for the Taking A Disturbing Tale. Outline What is native prairie and what remains? Of what value native prairie? Stewardship of native prairie.
CERP Guidance Memorandum
Ramsar Convention on Wetlands ( Ramsar Convention on Wetlands ( Convention on Wetlands “The conservation and wise use of.
Rivanna Water & Sewer Authority Community Water Supply Mitigation Plan Public Meeting November 2, 2006.
Draft River Basin Management Plan Workshop Freshwater Pearl Mussel December 2008.
Effects of Human Involvement in the River Ecosystem Jonathan Sexton.
Ecosystem Restoration continued. Terminology - Resistance-Inertia – resistance to change within a system (e.g. How much impact needed (threshold) to.
Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research Program Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research.
CEEWEB Academy III Strengthening civil participation in the implementation of EU nature conservation directives through the experiences gained by the 10.
City of New Braunfels Edwards Aquifer and the Habitat Conservation Plan HCP Implementing Committee May 29,
Knowledge on HIA IN CAMBODIA Constructing a Caring and Sharing Community Roles of HIA 4-6 October 2012 Bangkok.
The Field Office Technical Guide and Other Technical Resources CNMP Core Curriculum Section 2 — Conservation Planning.
Jan 2005 Kissimmee Basin Projects Jan Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management.
T&E Species, Special Sites and HCVF! Sarah Crow ATFS Webinar Series May 16, 2013.
Measuring Habitat and Biodiversity Outcomes Sara Vickerman and Frank Casey September 26, 2013 Defenders of Wildlife.
River Basin Management Plans & Strategic Environmental Assessment & Appropriate Assessment Ray Spain Local Authorities Workshop, 3 rd December 2008.
ESA Conservation Master Plan Background Westminster Ponds/Pond Mills ESA October 2, 2014 Linda McDougall Ecologist ext
Patterns in Communities & Succession. Species Richness Species richness: number of species in a community Species evenness: relative abundance of species.
Blind Pass Project Update Bayous Preservation Assoc. February 9, 2011.
Christchurch, New Zealand's second largest city Went overnight from this.
Desktop Analysis Used To: Identify areas that meet certain criteria (e.g. contig forest 50 acres+, id gaps as well, or set lower value in urban area) Identify.
Seite Hier steht ein thematisches Foto European Workshop on HMWBs, March 2009, Brussels Final designation of HWMBs in Austria for WBs.
Vulnerability and adaptive capacity of biodiversity in Wales Dr Clive Walmsley Countryside Council for Wales.
Natura EU ambitions for a coherent ecological network State of Play and Challenges Saskia Richartz Institute for European Environmental Policy.
Review of the implementation in England of the Habitats and Wild Birds Directives Nature Directors 23 May 2012 Robin Mortimer, Defra.
Conservation Describe the management of grassland and woodland habitats to maintain or increase biodiversity, as illustrated by mowing, grazing, scrub.
Case Study – Preparation of an EMP Integrated Ecosystem Management of Sunshine-Moon River Basin (SMRB) Project.
Ecological Succession. Questions for Today: What is Ecological Succession and what are the two types of succession? What is Ecological Succession and.
Rivanna Water & Sewer Authority Community Water Supply Mitigation Plan Public Meeting November 2, 2006.
Corby Weir Investigation Project. Corby Weir Investigations and significant events Background and History - Weir construction and Purpose Concerns raised.
Roseau River Flood Damage Reduction Project Roseau, Minnesota.
September 25, Who is Brushy Creek Regional Utility Authority? Local government corporation formed by Cedar Park, Leander and Round Rock to access,
Severn Estuary Forum Flood Risk and the Severn Barrage 19 th September 2009 Nick Lyness Wessex Flood &Coast Erosion Risk Manager.
European Commission, DG Environment, Nature Unit
A Pivotal Moment for Leaders Across the Gulf Coast States and Connected Communities Throughout the Country.
Wageningen International Sava Stakeholder Meeting Bardaca Ecological network, land use and biodiversity River Basin Management and Biodioversity Ecological.
Ecological Assessment of Symonds Yat Rapids Eric Palmer Cresswell Associates.
The Mekong River Commission: Challenges, Mission, and Strategies.
 The Living Murray. What is The Living Murray?  The Living Murray is one of Australia’s most significant river restoration programs. It aims to improve.
Southern North Sea Marine Protected Areas – Proposed Fisheries Management Measures.
Update to Proposition 1E – Early Implementation Project (EIP) Application and Local Share Reclamation Board Sub-Committee Meeting September 11, 2007.
1 Calcasieu River & Pass, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting February 2, 2005 Project Manager Mireya Laigast, Civil Engineer,
Draft Supplemental Environmental Impact Statement for the Upper Las Vegas Wash Conservation Transfer Area Nevada BLM Southern Nevada District Office.
GOOD NEIGHBOR AGREEMENTS (AUTHORITY) MARCH 31, 2016.
Peter Greenslade The New Forest Team Natural England.
COLUMBIA RIVER SALMON CUMULATIVE IMPACTS EXAMPLE.
Wetland Restoration Planning considerations New Forest Consultative Panel – 3 Sept 2015.
permitting.
CONSERVATION AND RESOURSE PROTECTION GRANT PROGRAM NEVADA DIVISION OF STATE LANDS Question 1.
Source: Stream Corridor Restoration Manual WATERSHED MANAGEMENT.
Our goal for today To gather broad, values-based input to inform future decisions about fish passage at Mactaquac Generating Station. Your feedback today.
In situ conservation.
How Humans Influence Ecosystem
Protection of species and habitats
Principles and rationale for SAC/SPA designation and management
The Habitats Directive and the Water Framework Directive
GIS Applications in the Water Management Sector
DG Environment, Nature Protection Unit (D3)
The Silver Maple Forest (Belmont Uplands) & The Impact of Development
Overview of Article 6 procedures under the Habitats Directive
PROVISIONS UNDER THE HABITATS DIRECTIVE RELEVANT TO NEEI
What can you do with this knowledge?
Outcomes from consultation of list of conservation measures
Hydropower in Europe Strategic coordination group
Presentation transcript:

Replacement of existing rock groynes and other in river restoration works to improve rapids and habitats in the River Wye at Symonds Yat

Aims: Provide stability to island and reduce erosion Provide year round, stable and permanent groynes Enhance & protect the habitat for rare and protected species Improve access to the rapids for emergencies and portaging

Proposals Boulders up to 5t will be placed to form 10 new goynes The new groynes will replace 12 currently on site Island to be protected with rock at upstream end. Ancillary works with planting on the island and access steps downstream of island

Environmental Considerations Scheme developed to agree planning policy Flood risk assessment made with a negligible impact Groynes will look very similar to existing

Environmental Considerations An independent, comprehensive ecological screening assessment has been made This concluded that the proposals would have No Significant Effects on the River Wye Special Area for Conservation and on any species of animal or plant. Indeed the proposals overall were deemed likely to have a beneficial effect on the SAC qualifying features.

Environmental Considerations An archaeology investigation concluded that there would be no impact on any known item of archaeological importance Access of all plant and materials will be via the forestry tracks. The final part of the access will be along the footpath and a diversion will be in place to the adjacent path The design will maintain the navigation of the rapids in both directions.

Timescales Works proposed for September 2008 after schools go back Six week window available as all river works must be completed by 15 th October Two weeks in river works expected; stone stockpiled beforehand Low flows required and if opportunity does not present itself then works postponed until ‘09.