NB Cell Changes Kick-off meeting ORE Garching 10/10/2006 A.Tanga.

Slides:



Advertisements
Similar presentations
Laying a new pipeline A pictorial story. Where it begins: a proving slot The proving slots are small trenches dug at regular intervals so that it can.
Advertisements

1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
LCW Upgrades - Final Booster RF Cavity LCW Isolation Valve Replacement. – 8 valves and unions previously replaced – An additional 10 valves and unions.
IBL IST G&S Integration Ned Spencer, UCSC July 15, /15/11IBL IST G&S Integration1.
Best Practices for Remote Assembly and Maintenance Keith Kershaw, Sources, Targets and Interactions Group Thanks to: Alessandro Tesini and Jim Palmer of.
31/03/11FV 1 CEDAR from flammable gas safety point of view.
"AIR COOLER" Heat Exchanger
Collaboration meeting, RAL, 4 th – 7th November 2009 Andrew Moss ASTeC Collaboration meeting, RAL, 10 th – 13 th november 2009 MICE RF Amplifier Status.
PEP-II Ramp Down to a Minimum Maintenance State J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
MICE RF Module Safety Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting February 12, 2005.
Managed by UT-Battelle for the Department of Energy Review of NFMCC Studies 1 and 2: Target Support Facilities V.B. Graves Meeting on High Power Targets.
Review of the mechanical design of the final focusing region of the HIF Point Design T. Brown ARIES Project Meeting January 8, 2003.
Absorber Design Details Mary Anne Cummings MICE MEETING Columbia June 13, 2003.
Herriman City Municipal Water PowerPoint Presentation March 10, 2011.
The Home Inspection Book: A Guide for Professionals By Marcia Darvin Spada Copyright, Thomson/South-Western, 2003, Revised, 2006.
Remote manipulations / diagnostics in radioactive areas and handling of radioactive material Workshop, Geneva, Switzerland 6 th May 2013 THE REPLACEMENT.
IDS-NF Mercury System Overview Van Graves IDS-NF 5 th Plenary Meeting April 9, 2010.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT Ed Freeman Engineering Manager 1.
Floating Head Heat Exchanger
2 Technical seminar - 5 th June 2014 Vincent Roger - TE-MSC-TF.
“Fix Tube Sheet” Heat Exchanger
AdV VAC design meeting Cascina, 19 July Agenda first discussion about vacuum design of central area - and pickoff chamber design in particular -
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT 1 Agenda Kick Off Meeting of the contract EFDA-ENEA 05/ Task TW5-SEA 4.2 “Update Failure Mode and Effect.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
128 May 2013 CENF Near Far Integration For the Safety Folder + Environmental impact Study Simple process: Identify Safety issues >> description >> risk.
Special assignment, OFES, USA 1 ITER, Cadarache, January 26, 2007 Clement Wong, General Atomics, USA Valery Chuyanov, Chang Shuk Kim, at this time the.
Maintenance and Accelerator Support RHIC run10. Last Wednesday: Nice recovery Nice recovery Good work all especially: Good work all especially: HP, RF,
STF status, April 2011 H. Hayano March 11, 2011: 14:46 Earthquake, AC power down. 16:00~18:00 visual check of STF infrastructure, no severe.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
Vincent MASSAUT 10/10/ EFDA Task TW6-TSS-SEA 2.1 Occupational Radiation Exposure - ALARA in ITER: further refinement Kick off meeting Garching, 10/10/2006.
VENTILATION PRINCIPLE FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 28/7/2009 Already presented by C. Martel/ J Inigo Golfin on15 th October 2008 CLIC WORKSHOP.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Program ingineer: Kovtunov Vasily Simulators of facilities and systems for Leningrad NPP personnel training.
3.4.3 Student Book © 2004 Propane Education & Research CouncilPage Bulk Plant Emergency Shutdown Equipment and Periodic Examination Methods One.
SAFETY AND ECONOMIC CONSIDERATIONS To ensure no overflow in treatment tank – Another pipe will be installed on the gutter To ensure continuous supply of.
REMOTE-HANDLING OVERVIEW I. Bailey Cockcroft Institute / University of Liverpool.
P16680: AATech Universal Oil and Bag System Bryce Mowers Jessica Reed Maria King Nicole Anklam Philip Couturier Samantha Orlando.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Kurt Krempetz (Director's Review - Dec. 7, 99) 1 Mechanical Infrastructure Kurt Krempetz Introduction Existing Systems New Systems Schedule Manpower Conclusions.
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
M. Gilchriese Phone Meeting December 18, M. Gilchriese 2 PP1 Region Update “Bag” gas barrier Passive insulation? Region for external beam pipe supports?
PSB H 0 -H - Injection: Sectorisation Analysis C.Pasquino, J. Hansen, P.Chiggiato 1LIU - PSB Ho-H- Injection Meeting.
October 9th, 2007 Daresbury – Positron Kick-Off Meeting Slide 1 Remote Handling Vinod K. Bharadwaj SLAC October 9th, 2007.
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
ILC-HiGrade annual meeting - 12 October 2011 ILC-HiGrade Meeting Cavity-Treatment at CEA Saclay (WP6) F. Eozénou.
D. Delikaris, TE-CRG, LSC 25th Meeting Page 2 October 18 th, 2013 LS1 Committee (LSC)- 25 th Meeting D. Delikaris, TE-CRG Cryogenics activities.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
Details on the Accelerator Installation Plan E. Sargsyan & L. Lari 20 April 2016.
Accelerator Tunnel Layout (G01) Nick Gazis Senior Mechanical Engineer Review of ESS Accelerator Conventional Facility Design.
5/15/ meeting. -21 work days to shutdown -31 calandar days to shutdown -Today is May 15 th all Jobs are supposed to be entered in the work list.
ColUSM #63 18 th September, 2015 D. Ramos, C. Mucher, L. Gentini, H. Prin, Q. Deliege, A. Bastard, J. Hrivnak.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
PSB and PS test systems status. M. Haase September 14 th Finemet Review.
October 7, 2010 HINS Test Cryostat 2 K Conversion Status October 7, 2010.
WP High Beta Cavities Delivery
Review of the International Linear Collider (ILC) Electrical and Mechanical System Design to be held at CERN on 21 March, 2012 The purpose of the Review.
Progress and Issues with VTS Upgrade
FFAG Magnets and Girders Meeting
Long Shutdown for the LHC: Vacuum Beam Pipes
Status of the cryogenic system for B180
K. Foraz on behalf of OSS members
CRITICAL design review: Nixie tube clock
Floating Head Heat Exchanger
Experimental equipment Edgar L. Black February 17, 2019
RSFs & categorisation 20 May, 2019.
Burst Disc Experiences at CEA Test Stand
Overview of the TARGET Monolith Rough Vacuum
Presentation transcript:

NB Cell Changes Kick-off meeting ORE Garching 10/10/2006 A.Tanga

Main points of NB cell Design Review in progress and next in November, new baseline in Interfaces critically important RH-maintenance considerations Definition of scenarios Need of input data/assumptions

Non RH Activities NB cell extra beams: Inspections, Leak test, pipe disconnection, (pump replacement), cable-bus bar disconnection/connection, exchange of equipment, VVPSS rupture disc inspection-exchange, valve replacement. NB cell top tubes. To be specified. NB: Remove/re-install shield, remove/re-install connections, bring in equipment for safety such as barrier, tents, disassemble the high voltage line of the DNB, revision of the scheduled maintenance of the source due to RF choice and elimination of filaments, only Cs oven re-filling. NB: Accident recovery scenario such as water leak in an injector.

Conclusions The work on NB cell integration to be finalized by year end to make the new baseline. Next year more detailed analysis. Basic activities can be defined at this stage. Interface with RH task.