Meeting the Need for Reliable Electricity Post-SONGS 1 Mohsen Nazemi P.E. Deputy Executive Officer South Coast Air Quality Management District California.

Slides:



Advertisements
Similar presentations
Overview of Draft Report by Statewide Advisory Committee on Cooling Water Intake Structures Inter-Agency Working Group SACCWIS Meeting March 27, 2014.
Advertisements

EPA’S DRAFT GUIDELINES TO STATES FOR THE DEVELOPMENT OF STATE 111(d) PLANS MIDWESTERN POWER SECTOR COLLABORATIVE JUNE 17, 2014 FRANZ LITZ PROGRAM CONSULTANT.
EPA’s Clean Power Plan Proposed Rules for Reducing GHG Emissions from Power Plants Presentation to ACPAC June 16,
Procuring Our Way to Compliance IEP 27 th Annual Meeting September 23, 2008 Fong Wan, PG&E.
Regulatory Update November 13, 2013 Mohsen Nazemi, P.E. Deputy Executive Officer South Coast Air Quality Management District.
Update on EPA Activities MOPC July 15-16, Current Known Impacts –Retirements –De-ratings –Outage Impact Studies Proposed Clean Power Plan 2 Topics.
The Massachusetts Approach to Power Plant Clean-up Policy Making and Standards Setting to Reach Clean Air Sonia Hamel Massachusetts Executive Office of.
1 Katy R. Forney Energy Sector Technical Authority Air Permits Section EPA Region 4 PSD and Title V Greenhouse Gas Tailoring Rule 14 th Annual Power Generation.
What options do states have? What is Georgia planning to do? What are some of the other states doing? What are the possible implications to permit fees?
EPA Rulemakings to Set GHG Emission Standards for Power Plants National Hydropower Association Webinar Kyle Danish February 14, 2014.
Air Protection Branch 1. 2 Air Quality Activities Support the Mission of the Air Protection Branch Monitor and Report Air Quality Data Analysis and Planning.
“From Plant to Plug” A Legal and Policy Critique of 111(d) Conference of Western Attorneys General July 22, 2014 Karl R. Moor Senior Vice President &
Clean Air Act Section 111(d) Indiana Energy Association September 11, 2014 Thomas W. Easterly, P.E., BCEE Commissioner IN Department of Environmental Management.
Katrina Pielli U.S. Environmental Protection Agency CHP Partnership
Texas Lignite Industry. Texas Lignite  Because >95% of lignite mining operations in Texas are in support of electric generation…..whatever impacts the.
Energy Storage R Energy Storage Procurement & Policy Options Arthur O’Donnell/Aloke Gupta/Elizaveta Malashenko Energy Division Grid Planning.
Bay Area Emission Reduction Strategies June 4, 2008 Jean Roggenkamp Deputy Air Pollution Control Officer Bay Area Air Quality Management District.
Air Quality Beyond Ozone and PM2.5 Sheila Holman North Carolina Division of Air Quality 6 th Annual Unifour Air Quality Conference June 15, 2012.
1 PSD - Case #1 Case #1: –A simple cycle natural gas power plant with PTE NOx of 300 tpy and GHGs of 150,000 tpy CO2e receives a PSD permit addressing.
The Intersection of Energy Reliability Objective and Other Environmental Policies and Programs, and the Role of Markets Barry Wallerstein, D.Env Executive.
1 Southern California Water Dialogue April 23, 2008 Jon Costantino Climate Change Planning Manager California Air Resources Board AB 32 California Global.
Laura Doll Deputy Executive Director, CPUC October 18, 2006 Platt’s CA Power Market Forum C ALIFORNIA P UBLIC U TILITIES C OMMISSION Fulfilling Resource.
Energy Action Plan “Report Card” and the AB32 “Umbrella” CFEE ROUNDTABLE CONFERENCE ON ENERGY Julie Fitch California Public Utilities Commission Director.
The Impact of Renewable Energy, Distributed Generation, Storage & Energy Efficiency on the Grid Southern California Energy Summit Governor Angelina Galiteva.
SOUTHERN CALIFORNIA EDISON SM Local Capacity Requirements (LCR) RFO for New Resources and Other SCE Solicitations Stu Hemphill September 26, 2013.
Mississippi Air Update Mississippi Dept. of Environmental Quality September 12, 2012.
Bill Harnett March 30, 2010 WESTAR Spring Meeting.
SCAQMD Air Quality Permitting for Emerging Technologies Jay Chen, P.E. South Coast Air Quality Management District November 4, 2009 Southern California.
GHG BACT Analysis Case Study Russell City Energy Center May 2010 Donald Neal Vice President, EHS.
Stationary and Area Source Committee Update OTC Committee Meeting September 13, 2012 Washington, D.C. Hall of the States 1.
1 EPA’s Climate Change Strategy Robert J. Meyers Principal Deputy Assistant Administrator U.S. EPA, Office of Air and Radiation December 3, 2007.
Washington State: Climate Initiative
EPA’s Proposed Clean Power Plan House Committee on Natural Resources and Environment February 12, 2015 Tegan B. Treadaway Assistant Secretary Office of.
THE MIX: FACTS, FIGURES, AND THE FUTURE INDEPENDENT ENERGY PRODUCERS ANNUAL MEETING SEPTEMBER 26, 2013 William A. Monsen MRW & Associates Oakland, California.
Greenhouse Gas (GHG) Permit Training Other Aspects of PSD Title V Permitting.
California Energy Commission IEPR Lead Commissioner Workshop University of California, Irvine August 17,
Indiana Energy Conference EPA Clean Power Plan—111(d) November 13, 2014 Thomas W. Easterly, P.E., BCEE, Commissioner IN Department of Environmental Management.
CPUC Role in AB 32 Implementation LIOB – 2 nd June, 2010 San Diego, CA.
CLEAN POWER PLAN PROPOSAL Reducing Carbon Pollution From Existing Power Plants Kerry Drake,Associate Director Air Division, US EPA, Region 9 California.
2014 Program Priorities January 23, Outline Major 2014 Goals 2013 Accomplishments Major 2014 Activities Partnerships 2.
June 26, Background of Federal GHG Regulation Supreme Court determines greenhouse gases (GHGs) are “air pollutants” under the Clean Air Act U.S.
1. Stationary and Area Sources Committee Recommendations OTC Annual Meeting 2010 Baltimore, MD 2.
California Public Utilities Commission CPUC Climate Change Activities Paul Clanon Executive Director August 28, 2007 Presentation to the Senate Energy,
1 Sunrise Powerlink Project Update Orange County Business Council March 10, 2009.
Update on EPA’s Greenhouse Gas Rulemakings Norman W. Fichthorn Hunton & Williams LLP 2010 American Public Power Association Energy and Air Quality Task.
California Public Utilities Commission Why a Load-Based Emissions Cap for California? Julie Fitch CPUC Director of Strategic Planning April 19, 2007 Presentation.
California Energy Commission Draft 2015 Integrated Energy Policy Report October 20, 2015 Presented by Heather Raitt Assistant Executive Director for Policy.
FINAL CLEAN POWER PLAN Before the Virginia Energy Efficiency Council Virginia Department of Environmental Quality November 12, 2015.
Southern California Edison The San Onofre Nuclear Generating Station April 14, 2011.
1 California Energy Commission April 27, 2015 Valerie Winn Chief, State Agency Relations Contingency Planning and Diablo Canyon Power Plant.
Governor’s Clean Energy GREEN TEAM Annual Statewide Air Quality Conference May 10, 2001.
Clean Air Act Section 111 WESTAR Meeting Presented by Lisa Conner U.S. Environmental Protection Agency Office of Air and Radiation November 6, 2013.
Air Credits in the South Coast Air Basin 1 Mohsen Nazemi P.E. Deputy Executive Officer South Coast Air Quality Management District Southern California.
Proposed Carbon Pollution Standard For New Power Plants Presented by Kevin Culligan Office of Air Quality Planning And Standards Office of Air and Radiation.
Nonattainment New Source Review (NA NSR) Program Raj Rao US Environmental Protection Agency Office of Air Quality Planning and Standards ,
1 Proposed Final Opinion on GHG Strategies in the Energy Sectors Key Findings and Recommendations October 16, 2008.
2015 IEPR Lead Commissioner Workshop Southern California Reliability University of California, Irvine August 17, 2015 Tom Doughty Director, State Regulatory.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Perspective on Contingency Mitigation Options Presented by John Annicchiarico, Senior Engineer August 17, 2015.
South Coast AQMD’s Regulatory Updates California Desert Air Working Group 2012 Conference November 7-8, 2012 La Quinta, CA 1 Mohsen Nazemi, P.E. Deputy.
SB350 IRP Overview April 18, 2016 Tanya DeRivi Southern California Public Power Authority Scott Tomashefsky Northern California Power Agency CEC IRP Workshop.
© 2015 Haynes and Boone, LLP Overview of the EPA Clean Power Plan Suzanne Beaudette Murray February 19, 2016 Tulane Environmental Law Summit.
Clean Power Plan Kyra Moore Director, Air Pollution Control Program Prepared for: Midwest Energy Policy Conference October 6, 2015.
Overview of SB 350 California Public Utilities Commission Melicia Charles, Energy Division February 23,
Energy: Challenges with Becoming More Sustainable © 2011San Diego Gas & Electric Company. All copyright and trademark rights reserved. Robb Anderson Director.
Clean Air Act Litigation Update State Air Director Meeting May 2015
Mike Jaske California Energy Commission
NSPS Rulemakings for Greenhouse Gas Emissions
EPA Regulation of Greenhouse Gases: The View from Washington Troutman Sanders LLP/Trinity Consultants July 20, 2010 PRESENTED BY Peter Glaser Troutman.
GHG Permitting: Regulatory Update
Presentation transcript:

Meeting the Need for Reliable Electricity Post-SONGS 1 Mohsen Nazemi P.E. Deputy Executive Officer South Coast Air Quality Management District California Desert Air Working Group 2014 Conference Pala, California October 8 & 9, 2014

What is South Coast Air Quality Management District? Local Air Pollution Control Agency in Southern California (All of Orange & Non-Desert Portions of LA, Riverside & San Bernardino Counties) Population of 16.4 million (about half of State’s population) Worst air quality in the nation (Ozone & PM 2.5) Receives and Processes about 9,000 permit applications annually Regulates over 27,000 stationary sources 2

SCAQMD’s Role/ Responsibility in Permitting Power Generation Local Air Quality Permitting Agency Primary Permitting Authority for Power Generation for less than 50 Megawatts (MW) Co-Permitting Authority for thermal Power Generation projects of 50MW or greater CEC has Primary Licensing and CEQA Lead Agency Authority/ Responsibility (AFC Process) SCAQMD has Authority/ Responsibility to issue Federal Permits (Title V/ PSD Permits) Small Distributed Generation – Exempt from Permits/ Must meet CARB Certification 3

San Onofre Nuclear Generating Stations (SONGS) Shutdown 4 Since Jan. 2012, SCE has shutdown both SONGS Units 2 & 3 due to leaks in radioactive steam tubes Total of 2,200 MW lost – Shortfalls in South Orange County & San Diego SCE announced permanent shutdown of SONGS on June 7, 2013

Actions Post SONGS Shutdown Retirement of SONGS on June 7, 2013 Governor’s Office called upon energy agencies, utilities and others to develop a plan Multi-agency review of options to assure reliability Preliminary Reliability Plan for LA Basin and San Diego developed by multi-agency team was reviewed in September 2013 and updated in August 2014 at CEC workshops held at UCLA, as part of IEPR proceeding CPUC and CAISO made policy decisions in March 2014 that partially implements the “Preliminary Reliability Plan” SCAQMD is proposing to implement contingency measures 5

CPUC’s Long Term Procurement Plan (LTPP) The LTPP authorizes new infrastructure to maintain system reliability Looks forward 10 years to identify system and local needs Considers alternative futures (renewable portfolio, demand and supply, and transmission scenarios) 6

CPUC’s 2012 LTPP Track 1 – D authorized SCE to procure electrical capacity in the West LA Basin & Moorpark sub-areas to meet long term local capacity requirements Track 4 – D authorized additional procurement for SCE and SDG&E to meet local capacity needs as a result of the retirement of SONGS 7

CPUC Procurement Authorization and Requirements for SCE * Resource Type Track 1 LCR Resources (D ) Additional Track 4 (D ) Total Authorization Preferred Resources Minimum Requirement 150 MW400 MW550 MW Energy Storage Minimum Requirement 50 MW--50 MW Gas-fired Generation Minimum Requirement 1000 MW MW Optional Additional From Preferred Resources/Energy Storage Only Up to 400MW Additional from any Resource 200 MW100 to 300 MW300 to 500 MW Total Procurement Authorization 1400 to 1800 MW 500 to 700 MW1900 to 2500 MW Maximum Gas Fired Generation 1200 MW 300 MW1500 MW * Source: CPUC Decision Authorizing Long Term Procurement to Replace Permanent Shutdown of San Onofre Nuclear Station – March 14,

CPUC Procurement Authorization and Requirements for SDG&E* Resource Type Prior Authorizations D / D Additional Track 4 D Total Authorization Preferred Resources (including energy storage) Minimum Requirement MW Energy Storage Minimum Requirement MW Additional from any resource 300 (Pio Pico)300 to 600 MW600 to 900 MW Total Procurement Authorization 300 MW500 to 800 MW800 to 1100 MW Maximum Gas Fired Generation 300 MW600 MW900 MW * Source: CPUC Decision Authorizing Long Term Procurement to Replace Permanent Shutdown of San Onofre Nuclear Station – March 14,

Other Requirements / Actions OTC policy was adopted by SWRCB in May 2010 with compliance dates linked to known replacement projects January 2013, SONGS units shutdown Summer 2012, HB Units 3-4 brought back Summer 2013, HB Units 3-4 converted to synchronous condensers and ISO/utilities begin installation of reactive power equipment at selected substations 10

Once-Through-Cooling Generating Units 11 OperatorFacilityUnits Total MW OTC Replacement Date AESAlamitosBoilers 1-61, AESHuntington Beach 1 Boilers AESRedondo BeachBoilers 5-81, NRGEl Segundo 2 Boilers LADWPHaynes 3 Boilers 1,2,5,6 Turbines 9,10 1, LADWPHarborTurbines 1, LADWPScattergood 4 Boilers Total 7,646 1 Huntington Beach Boilers 3 & 4 (450MW) shutdown Nov El Segundo Boiler 3 (135MW) shutdown July 2013 State Water Resources Control Board Policy 3 Haynes Boilers 5&6 (573 MW) shutdown June Scattergood Boilers 3 (460 MW) shutdown Dec 2015

SCAQMD’s Major Source Thresholds & Offset Requirements 12 Pollutant Offset Requirement Major Source PTE Threshold (tons/yr) SCAQMD Offset PTE Threshold (tons/yr) VOC ERCs*/ Offsets Required104 NOx RTCs**/ Offsets Required104 SOx ERCs/ Offsets Required1004 CO* Attainment, No Offsets Required5029 PM10 ERCs/ Offsets Required704 PM2.5 ERCs/ Offsets Required100 *Emission Reduction Credits **Reclaim Trading Credits

PM10 ERC Supply & Cost 2000 – 2014* * Thru May

Rule Electrical Generating Facility Fee For Use Of Offset Exemption Rule 1304(a)(2) exempts electric utility boiler replacements from offsets, however SCAQMD still has to provide offsets from SCAQMD’s Internal Bank Rule adopted on September 6, 2013 to require fees for use of this exemption & SCAQMD offsets Governing Board directed staff to work with stakeholders to develop guidelines for use of funds  “...priority will be placed on the use of the funds to improve air quality consistent with the AQMP in the impacted, surrounding communities” 14

Rule Overview Rule applicable to Repowering of electric utility boiler units at Existing power plants Provides PM10, NOx, SOx and VOC Offsets to repowering projects for a fee Current lack of PM10, SOx and NOx ERCs in the open market 15

Proposed Guidelines for Use of Rule Mitigation Fees Impacted Surrounding Communities consistent with AQMP with Emphasis on: Preferred Resources Energy Efficiency Demand Response Energy Storage Renewables Meeting AQMP Reduction Needs Near Zero- or Zero-Emission Vehicles & Charging Infrastructure 16

Proposed Rule Purpose Implement the “Contingency Measure” in the Governor’s Multi-agency’s “Preliminary Reliability Plan” Promote preferred resources CPUC Loading Order CARB AB32 Scoping Plan SCAQMD Energy Policy Facilitate grid reliability Assist in implementation of attainment strategy 17

Proposed Rule Overview Require a Fee for SOx/PM10 Offsets obtained from SCAQMD offset accounts for New Greenfield Electrical Generating Facility Not mandatory to obtain offsets from SCAQMD accounts Fee proceeds to be invested in air pollution improvement strategies consistent with the Air Quality Management Plan and/or local impacts 18

Use of Proposed Rule Fees Impacted Surrounding Communities, consistent with AQMP with Emphasis on: Preferred Resources Energy Efficiency Demand Response Energy Storage Renewables Low- or Zero-Emission Vehicles & Charging Infrastructure Consistent with Proposed Rule Guidelines 19

PSD/T-V GHG Tailoring Rule PSD Permitting New projects with emissions of >100,000 tpy of CO 2 e Modifications at an existing Major source with increase of >75,000 tpy of CO 2 e Title V Permitting All new and existing sources with PTE >100,000 tpy CO 2 e Modifications at an existing Major source with increase of >75,000 tpy of CO 2 e 20

GHG Tailoring Rule – Actions Completed to Date Step 1 Established GHG applicability criteria for “anyway sources” “Anyway sources” must address GHG emissions increases of 75,000 tons per year (tpy) CO 2 e or more Went into effect on January 2, 2011 Step 2 Retains “anyway sources” applicability criteria and established GHG applicability criteria for large air emissions sources PSD Permits for New facilities with GHG emissions of at least 100,000 tons per year (tpy) CO 2 e and existing facilities with at least 100,000 tpy CO 2 e making changes that would increase GHG emissions by at least 75,000 tpy CO 2 e Title V Permits for New and existing sources with GHG emissions above 100,000 tpy CO 2 e Went into effect on July 1,

U.S. Court of Appeal’s Decision On June 26, 2012, The U.S. Court of Appeals for the D.C. Circuit ruled on cases for GHG Regulations The Court of Appeals upheld four of EPA’s GHG rulemakings. Upheld EPA’s Endangerment Finding and the Tailpipe Rule on the merits, and Dismissed the petitions for review of the Triggering/Timing Rule and the Tailoring Rule on standing grounds 22

GHG Tailoring Rule – Actions Completed to Date (cont’d) Step 3 Did not lower the applicability thresholds under Steps 1 and 2; these thresholds still apply Establishes GHG PALs for GHG-only sources on a CO 2 e basis in addition to the already available mass-basis Finalized in July 2012 June 23, 2014 Supreme Court split decision (5-4) struck down the PSD & Title V permit requirements for “GHG only sources”, but withheld BACT for GHG for “Anyway PSD Sources” 23

U.S. Supreme Court Decision in Utility Air Regulatory Group vs. EPA On June 23, 2014 U.S. Supreme Court ruled in the case of UARG vs. EPA To Sum Up: “We hold that EPA exceeded its statutory authority when it interpreted the CAA to require PSD and TV permitting for stationary sources based on their GHG emissions. Specifically, EPA may not treat GHG as a pollutant for purposes of defining a “major emitting facility” (or a “modification” thereof) in the PSD context or a “major source” in the TV context. To the extent its regulations purport to do so, they are invalid.” 24

U.S. Supreme Court Decision in Utility Air Regulatory Group vs. EPA To Sum Up (continued): “EPA may, however, continue to treat GHG as a “pollutant subject to regulations under this chapter” for purposes of requiring BACT for “Anyway” sources. The judgment of the Court of Appeals is affirmed in part and reversed in part.” The “Anyway” sources account for about 83% of stationary sources GHG emissions, compared to only 3% for the “Non-Anyway” sources under Steps 2 & 3 of Tailoring Rule 25

Future Actions – Tailoring Rule – Step 4 5-Year study will be used to support a “Step 4” rule that might phase-in GHG permitting for smaller sources Determination to consideration same criteria used in Tailoring rule: 1. The time that permitting authorities need [or needed] to ramp up their resources, including developing permitting infrastructure as well as hiring and training staff 2. Sources’ abilities to meet the requirements of the PSD program and permitting authorities’ abilities to issue timely permits, including gaining experience with GHG permitting 3. Whether the EPA and the states could develop [or developed] streamlining measures Rule is due on April 30, 2016, but may not be pursued due to the Supreme Court decision 26

Step 1 Implementation Step 2 Implementation Step 3 Implementation 5-Year Study Step 4 Phase-in Rule GHG Tailoring Rule Implementation Timeline 27

EPA’s New Power Plants GHG RULE Proposed Rule - 111(b) EPA released proposed rule for GHG emissions from new electric generating units(EGUs) in Sept Applies to units built/operated after January 8, 2014 CO2 limits based solely on fuel type and size For natural gas-fired units: — 1,000 lbs CO2/MW-hr for EGUs > 850 MMBtu/hr — 1,100 lbs CO2/MW-hr for EGUs <= 850 MMBtu/hr — EGU with <33% capacity factor is exempt 28

EPA’s Existing Power Plants GHG RULE Proposed Rule - 111(d) June 2, EPA released proposed rule for GHG emissions from existing EGUs — Expected to reduce CO2 emissions 30% from 2005 levels by 2030 — Limits carbon intensity of a state’s electrical grid as a whole — Credit given for demand-side energy efficiency programs and renewable energy programs 29

Proposed Rule 111(d) Building Blocks Four building blocks to set emissions target: Make existing coal-fired EGUs more efficient — Greater use of lower-emitting EGUs — Greater use of zero and low-emitting power sources — Increase demand-side energy efficiency 1.5% annually States have flexibility to comply using any combination of measures 30

Proposed 111(d) Target EPA proposed California’s emission baseline is 698 lb CO2/MW-hr in 2012 California’s proposed target is: — 537 lb CO2/MW-hr by 2030 CARB’s Preliminary analyses suggest that California will meet the targets through existing programs 31

Proposed Rules 111(b) & 111(d) Schedule June EPA to finalize 111(b) rule June EPA to finalize 111(d) rule June States to submit compliance plans June States may choose to submit multi-state plans 32