ATLAS Preparations for LHC Phase-I Upgrade G. Darbo – INFN / Genova ATLAS Week, 8 July 2009 o ATLAS Preparations for LHC Phase-I Upgrade ATLAS Week CERN,

Slides:



Advertisements
Similar presentations
3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June 2009 o IBL per Marzio G. Darbo - INFN / Genova Agenda page:
Advertisements

Status of the ATLAS MM project
Plot Approval Yat Long Chan (CUHK) Igor Mandic (Ljubljana) Charlie Young (SLAC)
IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March 2010 o IBL interim-MoU Annexes Pixel Extended Institution Board CERN, March 1 st, 2010 NCP.
Update on ATLAS IBL G. Darbo – INFN / Genova LHCC, 22 September 2009 o Update on ATLAS insertable B-layer LHCC Upgrade session CERN, September, 22 nd 2009.
Consolidation and Upgrade of the LHC Experimental Vacuum Sectors
HFT Geometry Considerations F.Videbæk BNL. Introduction This presentation is meant to be a living document, updated as more and better information becomes.
ATLAS detector upgrades ATLAS off to a good start – the detector is performing very well. This talk is about the changes needed in ATLAS during the next.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
ATLAS POH.P, G.D12/5/2009 IBL Update H. Pernegger, G. Darbo (PO 12/5/09) Organization and WG coordinator Schedule Decision Items Organization Tools & Meetings.
IBL Slides G. Darbo – INFN / Genova CSN1, 22 November 2010 o IBL Spare Slides Commissione I – 22 Nov 2010 G. Darbo - INFN / Genova.
Towards a TDR for the IBL G. Darbo - INFN / Genova AW, 24 February 2009 o Towards a TDR for the IBL ATLAS Upgrade Week CERN, 24 February 2009 Session:
1 VI Single-wall Beam Pipe tests M.OlceseJ.Thadome (with the help of beam pipe group and Michel Bosteels’ cooling group) TMB July 18th 2002.
T. Kawamoto1 Small Wheel upgrade project Muon week, upgrade meeting T. Kawamoto.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
IBL MoU G. Darbo – INFN / Genova 24 April 2010 o IBL MoU ATLAS Upgrade Week DESY, April 24 th 2010 M. Nordberg, M. Nessi, C. Gößling, H. Pernegger Presented.
IBL Project Status G. Darbo – INFN / Genova AW, 9 October 2009 o Insertable B-layer Project Status ATLAS Week Barcelona, October, G. Darbo - INFN.
IBL MoU G. Darbo – INFN / Genova 17 April 2010 o IBL MoU Contribution prepared for Marzio’s talk at April RRB G. Darbo - INFN / Genova.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
CERN, Main challenges for the ATLAS upgrade project in the coming year.
1 H. Pernegger/CERNIBL cooling review 15/5/2012 IBL Cooling Requirements H. Pernegger.
SCT Week 2 Oct 2002N.P. Hessey NIKHEF1 Status ATLAS SCT 2002 NIKHEF Contributions to ATLAS: Magnets – discussed by Frank Trigger DCS Muon MDT and alignment.
Update on ATLAS IBL G. Darbo – INFN / Genova LHCC, 22 September 2009 o Update on ATLAS insertable B-layer LHCC Upgrade session CERN, September, 22 nd 2009.
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
G. Carboni – Muon Meeting – April 2002 Muon Meeting LHC schedule is now official (Council Committee) First protons (Pilot run) delayed to
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
ATLAS FP TRACKER PLANS Steve Watts School of Physics and Astronomy University of Manchester Well defined design in the FP420 Design Report Based on the.
Communications G. Darbo – INFN / Genova IBL MB#15, 5 October 2009 o Bump Bonding Selex / INFN Roma, October, 30 th 2009 G. Darbo - INFN / Genova.
B-layer integration with beam-pipe and services ATLAS B-layer upgrade E. Anderssen A. Catinaccio.
ATLAS micromegas activities (MAMMA)
IBL - Opening G. Darbo - INFN / Genova AW, 25 February 2009 o IBL Introduction & Project Organization ATLAS Upgrade Week CERN, 25 February 2009 Session:
October RRB G. Darbo & H. Pernegger RRB – October 2010 o October RRB Slides for Marzio’s RRB talk CERN, October, 11 th 2010 G. Darbo & H. Pernegger.
Local Supports to IDR Discussion ATLAS Upgrade Week November 2014.
IBL Kick-off Meeting – Summary & Issues G. Darbo – INFN / Genova UPO, 21 July 2009 o IBL kick off meeting summary and issues ATLAS Upgrade Project Office.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
3D sensors for tracking detectors: present and future applications C. Gemme (INFN Genova) Vertex 2013, Lake Starnberg, Germany, September 2013 Outline:
15/09/20111 ATLAS IBL sensor qualification Jens Weingarten for the ATLAS IBL Collaboration (2 nd Institute Of Physics, Georg-August-Universität Göttingen)
The LHCb Vertex Locator Lars Eklund LHCb VELO Group of the LHCb Collaboration CERN (Geneva), EPFL (Lausanne), NIKHEF (Amsterdam), University of Glasgow,
IBL – UniGe involvements UniGe Team : G. Barbier, F. Cadoux, A. Clark, S. Débieux, D. Ferrère, C. Husi, G. Iacobucci, M. Weber Other member (KEK): Y. Takubo.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
ATLAS Upgrade Plans ATLAS Hardware – Challenges and Opportunities Norwegian CERN “Town Meeting” Bergen
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
IBL TDR G. Darbo / INFN Genova ATLAS CB – October 2010 o TDR of Insertable B-layer ATLAS CB, October 8 th 2010 G. Darbo / INFN - Genova Indico agenda page:
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
TDAQ and L1Calo and Chamonix (Personal Impressions) 3 Mar2010 Norman Gee.
ATLAS Italia – IBL G. Darbo – INFN / Genova CERN, 2 March 2011 o IBL ATLAS Italia / Referee CERN, March 2 nd 2010 G. Darbo – C. Meroni INFN / GE – MI Agenda:
Atlas Upgrade week - November 15 th, 2011M. Raymond – CERN/PH-ADO-PO 1 Introduction Many activities are planned to be performed during the shut down
The ATLAS IBL Project – 5 th Trento Workshop G. Darbo – INFN / Genova Manchester, February 2010 o The ATLAS IBL Project The 5 th "Trento" Workshop.
Upgrade Intro 10 Jan 2010 Norman Gee. N. Gee – Upgrade Introduction 2 LHC Peak Luminosity Lumi curve from F.Zimmermann : Nov Upgrade Week ? ?
Introduction to L1Calo Upgrade L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
The ATLAS Insertable B-Layer Detector (IBL) F. Hügging on behalf of the ATLAS IBL collaboration Pixel th International Workshop on Semiconductor.
20/07/ Marzio Nessi Agenda For NIKHEF plans for the ATLAS Upgrade. NIKHEF ATLAS upgrade plans and organization DL/NH Potential.
Upgrade plans for ATLAS. Nigel Hessey (Nikhef) is overall ATLAS upgrade coordinator.
ATLAS Pixel Upgrade G. Darbo - INFN / Genova LHCC- CERN 1/76/2008 o Pixel/B-layer Developments LHCC Upgrade Session CERN, 1 / 7 / 2008 G. Darbo - INFN.
Straw man layout for ATLAS ID for SLHC
IBL Technical Aspects H. Pernegger / CERN.
TC activities.
FBK / INFN Roma, November , 17th 2009 G. Darbo - INFN / Genova
Technical Design for the Mu3e Detector
Project definition and organization milestones & work-plan
P. Morettini Towards Pixel TDR PM - ITk Italia - Introduction 8/2/2017.
SVT – SuperB Workshop – SLAC 6-9 Oct 2009
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
Upgrade Strategy for the Experimental Vacuum Systems
Francesco Forti University and INFN, Pisa
Communications Share Point Collaborative WS:
CO2 cooling requirements for the IBL
Update on ATLAS insertable B-layer
Presentation transcript:

ATLAS Preparations for LHC Phase-I Upgrade G. Darbo – INFN / Genova ATLAS Week, 8 July 2009 o ATLAS Preparations for LHC Phase-I Upgrade ATLAS Week CERN, July 6 th G. Darbo - INFN / Genova Indico AGENDA page:

ATLAS Preparations for LHC Phase-I Upgrade G. Darbo – INFN / Genova ATLAS Week, 8 July IBL Status Project formally started: Project Leader endorsed by CB (Feb 2009) IBL Management Board IBL Kick-off meeting – July 8 th – Interested Institutes leaders invited To converge towards a MoU for the IBL project IBL General Meeting June 25 th & 26 th 42 talks – 2 full day technical discussion Whole project covered including software TDR editor K. Einsweiller is the TDR editor, with Mar Capeans looking at the technical implementation of the document. EB Minutes – 3 April 2009

ATLAS Preparations for LHC Phase-I Upgrade G. Darbo – INFN / Genova ATLAS Week, 8 July IBL Project & Organization The IBL (Insertable B-Layer) is an ATLAS Upgrade project: It will deliver a fourth pixel layer, including a new beam-pipe, to the Inner Detector When delivered, it will become a part of the Pixel Detector and of the Inner Detector and the organization will be “absorbed” into the Pixel & ID The organization structure has: IBL MB: Management Board to execute the project IBL IB: Institute Board, which starts today as an extension of the existing Pixel IB and will be chaired by C, Goessling. Module WG IBL MB (Management Board) IBL MB (Management Board) Stave WG Stave WG I&I WG I&I WG Off-det WG Off-det WG IBL IB (Institute Board) IBL IB (Institute Board) Pixel Institutes in IBL Pixel Institutes in IBL New Institutes in IBL New Institutes in IBL ATLAS UPO ATLAS UPO ATLAS UPGRADE IBL IBL PL IBL TC

ATLAS Preparations for LHC Phase-I Upgrade G. Darbo – INFN / Genova ATLAS Week, 8 July Management Board (MB) Module WG (2 coordinators) FE-I4 Sensors Bump-Bonding Modules Test & QC Irradiation Module WG (2 coordinators) FE-I4 Sensors Bump-Bonding Modules Test & QC Irradiation Stave WG (1 Phys + 1 Eng.) Staves Cooling Design & Stave Thermal Management HDI Internal Services Loaded Stave Test & QC Stave WG (1 Phys + 1 Eng.) Staves Cooling Design & Stave Thermal Management HDI Internal Services Loaded Stave Test & QC IBL Integr.-Install. (2 Eng.) Stave Integration Global Sup. Beam Pipe (BP) Ext.services inst. IBL+BP Installation Cooling Plant Test & QC IBL Integr.-Install. (2 Eng.) Stave Integration Global Sup. Beam Pipe (BP) Ext.services inst. IBL+BP Installation Cooling Plant Test & QC Off-detector (1 Phys + 1 E.Eng.) Power DCS ROD Opto-link Ext.serv.design/proc. Test Beam System Test Off-detector (1 Phys + 1 E.Eng.) Power DCS ROD Opto-link Ext.serv.design/proc. Test Beam System Test IBL Management Board Membership: IBL PL + IBL TC 2 coordinators from each WG Plus “extra” members IBL Management Board Membership: IBL PL + IBL TC 2 coordinators from each WG Plus “extra” members Ad-interim membership IBL Project Leader: G. Darbo IBL Technical Coordinator: H. Pernegger “Module” WG (2 Physicists): F. Hügging & M. Garcia- Sciveres “Stave” WG (1 Phy. + 1 M.E.): O. Rohne + D. Giugni “IBL Assembly & Installation” WG (2 M.E. initially, a Phy. Later): N. Hartman + R. Vuillermet “Off-detector” WG (1 Phy. + 1 E.E.): T. Flick + S. Débieux “Extra” members: Ex officio: Upgrade Coordinator (N. Hessey), PO Chair (M. Nessi), Pixel PL (B. Di Girolamo), ID PL (P. Wells), Pixel Chair (C. Gößling) Offline “liaison” Pixel Off-line coordinator: A. Andreazza TDR editor (temporary): K. Einsweiler

ATLAS Preparations for LHC Phase-I Upgrade G. Darbo – INFN / Genova ATLAS Week, 8 July Ref: N. Hartman: Predominant Stave Layouts Several layouts under study: 14 staves at R min =~3.2 cm Single and double staves – One or two (redundant) cooling channels Inverted Sensor Biturbine

ATLAS Preparations for LHC Phase-I Upgrade G. Darbo – INFN / Genova ATLAS Week, 8 July R. Vuillermet The support carbon tube is fixed in 2 point of PP0 and on PP1 walls on side C and A. The structural pipe with a support system is moved out from the support carbon tube.. The new beam pipe (in any configuration with OD up to 82,5 mm) is inserted from A-side. It has 2 supports at PP0 area and 2 floating wall at PP1 on side A and C. Two global support / installation scenarios: IBL support tube (1) / no tube (2): An IBL support tube would have advantage on stiffness and simplicity/safety for IBL installation, but drawback are envelope needs (~1÷1.5 mm) and increase of radiation length Procedure studied on mock-up at bld procedure (1) animation: The beam pipe flange on A-side is to close to the B-layer envelope - Need to be cut on the aluminum section A structural pipe is inserted inside the Beam Pipe and supported at both sides. The support collar at PP0 A-side is disassembled and extracted with wires at PP1. Beam pipe is extracted from the C-side and it pulls the wire at PP1 New cable supports are inserted inside PST at PP0. A support carbon tube is pushed inside the PST along the structural pipe. Started to setup a 1:1 mock-up of Pixel/beampipe/PP1 in Bat 180 A-side C-side Installation Scenarios

ATLAS Preparations for LHC Phase-I Upgrade G. Darbo – INFN / Genova ATLAS Week, 8 July Requirements for Sensors/Electronics Requirements for IBL IBL design Peak Luminosity = 3x10 34 cm- 2 s -1 Integrated Luminosity seen by IBL = 550 fb -1 Total NIEL dose = 2.4 x ± 30% (σ pp ) ± 50% (damage factor) = 4.7 x n eq /cm 2 Total radiation dose > 200 Mrad Fit made for 2 < r < 20 cm for L=1000fb -1 Gives for 3.7 cm (550 fb -1 ):  1MeV =2.4x10 15 (1.2 MGy) Safety factors not included in the computation (pp event generator: 30%, damage factor for 1 MeV fluences: 50%) Ref. Ian Dawson - AUW

ATLAS Preparations for LHC Phase-I Upgrade G. Darbo – INFN / Genova ATLAS Week, 8 July Module Layout - Convergence Decision between Planar and 3D sensors will be done after TDR Need module prototypes with FE-I4 (second half 2010) Diamonds could be another option Common sensor baseline for engineering and system purposes 3D sensors – single chip modules Planar sensors – 2 chip modules Gap between sensors: 100µm for mechanical / high voltage requirements Maximum operating voltage: 1000 V (need more for planar?) Credits: M.Garcia-Sciveres – F. Hügging

ATLAS Preparations for LHC Phase-I Upgrade G. Darbo – INFN / Genova ATLAS Week, 8 July D Sensors Large collaboration 15 Laboratories and 3 processing facilities Thickness 230±15 m Module type single FE-I4 assembly #electrode2 per 250m Edgeactive 5m Edgesguard 200m Signal (5x10 15 ) ~12500 e - Bias (5x10 15 )~150V Wcm -2 ( 5x10 15 ) 33mW at -10 o C Lorentz angle before irr. free Efficiency (3200 e - ) 96% (0 o ) 99% (15 o ) Wafer dim.4” Expected yield ~50% Bias bump-b and pad FBK & CNM SINTEF/Stanford Credits: C. Da Via on behalh of ATLAS 3D Sensor R&D

ATLAS Preparations for LHC Phase-I Upgrade G. Darbo – INFN / Genova ATLAS Week, 8 July Planar Sensor Planar sensor R&D approved by sLHC USG 16 Institutions High dose (also for IBL) Low cost – large sLHC N-on-n & n-on-p For IBL: improve radiation hardening Slim edge (no overlap in Z) Optimize guard-ring vs. Vbias

ATLAS Preparations for LHC Phase-I Upgrade G. Darbo – INFN / Genova ATLAS Week, 8 July Planar Sensors – Slim Edge

ATLAS Preparations for LHC Phase-I Upgrade G. Darbo – INFN / Genova ATLAS Week, 8 July D & Planar – Test Beam (June ‘09) Comparison of 3D and Planar Test beam with magnetic field Planar sensors are sensitive to Lorentz angle: maximize charge at incidence angle = Lorentz angle 3D (electric field parallel to sensor surface) are not. Active edge: ~5 to ~10 µm from edge (see picture at the right) 3D FBK ToT at 15 o 3200e - planar

ATLAS Preparations for LHC Phase-I Upgrade G. Darbo – INFN / Genova ATLAS Week, 8 July Frontend Chip - FE-I4 7.6mm 8mmactive 2.8mm FE-I3 74% active 16.8mm 20.2mm ~2mm ~200 μ m FE-I4 ~89% Chartered reticule (24 x 32) IBM reticule ~19 mm New FE-I4 Pixel size = 250 x 50 µm 2 Pixels = 80 x 336 Technology = 0.13µm Power = 0.5 W/cm 2 FE-I3 Largest Chip in HEP

ATLAS Preparations for LHC Phase-I Upgrade G. Darbo – INFN / Genova ATLAS Week, 8 July FE-I4 Status Prototype blocks in MPW (MOSIS) submitted 3/2008, measurements, irradiation Design review (3/2009): “Design Technical Issues” on full scale design FE-I4 Design Collaboration Meeting - Bonn July 1 st and 2 nd 2009 Very successful to finalize technical details needed for full design integration Target date for having complete chip layout done is still September 09 The technical schedule for each circuit block delivery is being updated Many interfaces have been finalized and documentation of the details is under way Internal communication between circuit blocks data output format headers, configuration read-back, etc. Partitioning of power "planes" and power-up sequence Pinout (being updated)

ATLAS Preparations for LHC Phase-I Upgrade G. Darbo – INFN / Genova ATLAS Week, 8 July FE-I4 Pixel Cell Layout

ATLAS Preparations for LHC Phase-I Upgrade G. Darbo – INFN / Genova ATLAS Week, 8 July Cooling: CO 2 or C 3 F 8 IBL cooling P total =1.5kW Prototyping CO 2 and C 3 F 8 cooling system in cooperation with ATLAS CERN cooling groups and NIKHEF Prototype staves and cooling pipes/heater assemblies ready to start measurements on heat transfer coefficient and thermal performance of stave Pipe material plays important role in thermal gradient: figure of merit is between 16.5  C.cm 2 /W (CF) and 2.4  C.cm 2 /W (Ti), Ti therefore allows for higher sensor power before thermal run- away Choice of coolant influences pipe diameter (CO 2 : ~1.6mm, C3F8 ~3mm) and minimal evaporation temperature (C 3 F 8 min T evap =-30  C, CO2 min T evap = - 45  C) Want redundancy (2 pipes) to avoid this significant “single point failure” in case of leak/blockage of one pipe Very preliminary & conservative material breakdown for different options: Credits: D. Giugni, P. Schwemling, H. Pernegger

ATLAS Preparations for LHC Phase-I Upgrade G. Darbo – INFN / Genova ATLAS Week, 8 July When is IBL Ready to Install? Difficult answer…: In February (AUW) we have been told that the installation date was delayed by one year End of > end to 2013 Today we feel that the 2013 is optimistic Earliest starting date for Phase I is the 2013/2014 shutdown. The availability of LINAC4 (around 2014) will define the shutdown for Phase I, upgrade, when the IBL would be installed. The Upgrade Project Office (May 12 th ) suggests to use 2014/2015 as a guideline for the IBL installation date. We are now working with a schedule that foresee an installation date in 2014/2015 Need to agree with LHC machine on Phase I date -> LHCC The FE-I4 and Sensor/Module are on the critical path, and installing earlier than 2014/2015 would require some compromises in the performance.

ATLAS Preparations for LHC Phase-I Upgrade G. Darbo – INFN / Genova ATLAS Week, 8 July FEI4 drives the schedule for modules -getting the next FEI4 asap is crucial for module qualification Stave 0 plays a crucial to qualify the IBL system (mechanics, staves and off detector electronics) Service installation happens in shutdowns - need definition & procurement of services (USA15->PP2) early on to use shutdown time efficiently Commissioning as part of Pixel system Credits: H. Pernegger

ATLAS Preparations for LHC Phase-I Upgrade G. Darbo – INFN / Genova ATLAS Week, 8 July IBL Software - Migration to Athena/G4 Attilio Andreazza coordinating the activities - mailing list for IBL software development Implement IBL in the existing ATLAS software framework Detector simulation based on Geant 4 Keep up with material updates in the ID and surroundings Use existing ATLAS track reconstruction algorithms Use existing b ‐ tagging algorithms Meeting end of July to discuss progress: G4 geometry implementation (Dmitri Tsybychev) Implementation of different digitizations (Vadim Kostyukhin) Simulation of radiation damage (from current pixel community) Define benchmarks for TDR

ATLAS Preparations for LHC Phase-I Upgrade G. Darbo – INFN / Genova ATLAS Week, 8 July sLHC Phase I Work has started within Level-1 to revisit the performance of current L1 algorithms at and extend to 3x10 34 Understand the benefits of topological information Hardware changes necessary to propagate/use the topological info L1Calo and L1Muon to understand together how L1Calo info can be propagated to L1Muon for muon isolation purposes the max latency available to work within FTK is a hardware track reconstruction system It would work on L1A events and produce tracks in the whole InDet (not RoIs) within 10s of µs to be used by L2 (tracking performance similar to L2) Work has been hampered by difficulty in producing sizable simulation datasets at Asked to explore How FTK deals with 3x10 34 (needs simulation) How FTK can incorporate the IBL How the FTK compares with expanding the L2 farm Planning to submit a TDR by end 2009

ATLAS Preparations for LHC Phase-I Upgrade G. Darbo – INFN / Genova ATLAS Week, 8 July sLHC Phase I Muon detector has large uncertainty (factor 5) on cavern background: Possible performance degradation in the very forward region 2.0<  <2.7 (CSC region) Original Muon Spectrometer Design with 2 layers of CSC (8 precision measurements) but currently only one layer installed. Study the possibility to reinforce the CSC region by inserting a thin (50 mm) detectors to provide more measuring points and possibly pad read-out Current Options: TGC MicroMegas ThinTubes MDT

ATLAS Preparations for LHC Phase-I Upgrade G. Darbo – INFN / Genova ATLAS Week, 8 July BACKUP SLIDES

ATLAS Preparations for LHC Phase-I Upgrade G. Darbo – INFN / Genova ATLAS Week, 8 July New Beam Pipe From Ray’s presentation to PO 10/6 Need beam pipe ready for integration in SR1 1 year before IBL installation Beam pipe production ARO long (2 years at manufacturer + 8mo for preparation at Cern ??? - To be verified) 2009: Aim to have full technical drawing of beam pipe by end of this year (flanges,..) Important: Need to make official request to Beam Pipe group now Start market survey 25mm radius compatible with aperture and mechanics Open question to validate this number larger TAS, smaller VI Machine induced background Impedance requirement & Vacuum

ATLAS Preparations for LHC Phase-I Upgrade G. Darbo – INFN / Genova ATLAS Week, 8 July IBL kick-off Meeting – Draft Agenda 9:00 – Introduction – G.Darbo (20 min) What is IBL project – first project in the upgrade phase I – deliver a 4th layer for the pixel detector – model of resources Scope of the meeting 9:30 – Technical Presentation of IBL project - H. Pernegger (30 min) Where exists a technical baseline Where are open technical options and what are the planned steps for a convergence Where technical solutions have not discussed or are very little developed Manpower figure 10:15 Coffee Break 10:45 Project Cost – G. Darbo (20 min) 11:15 Round table – “Wishes and Interest of Institutes” – Chair C. Gößling 12:45 Lunch 14:15 Sharing of Work – “Interactive Session” G.Darbo, C. Gößling Fill online a table with work sharing – “the big picture” Keep note of inputs from round table 16:45 Coffee Break 17:15 Memorandum of Understanding – M.Nordberg What should be inside – look at ATLAS construction MoU How to map “the big picture” into the MoU 18:00 End of the meeting

ATLAS Preparations for LHC Phase-I Upgrade G. Darbo – INFN / Genova ATLAS Week, 8 July MB & WG Operation IBL organization is starting up: Management Board (IBL MB) Weekly meeting on Monday – closed meeting – issues tracking The 4 Working groups (WG) cover the whole project: WG1 – Module WG2 – Stave WG3 – Integration & Installation WG4 – Off-detector Mailing lists – open subscription to ATLAS active members IBL General: WG1: (alias WG2: (alias (it was the WG3: (alias WG4: (alias To subscribe:

ATLAS Preparations for LHC Phase-I Upgrade G. Darbo – INFN / Genova ATLAS Week, 8 July Collaborative Workspace

ATLAS Preparations for LHC Phase-I Upgrade G. Darbo – INFN / Genova ATLAS Week, 8 July IBL Cost Total cost 9.6 MCH: Use this cost to “shape the project” – revise when better understanding of the design (TDR) Funding Model: M&O-A, M&O-B, New project money