ENVIRONMENTAL IMPACT ASSESSMENT: Managing Hydropower, Mining and Infrastructure Development Impacts on Natural Capital Iain Watson Senior Environmental.

Slides:



Advertisements
Similar presentations
CLIMATE CHANGE ADAPTATION PROGRAM FOR THE PACIFIC (CLIMAP) Presented by Edy Brotoisworo, Sr, Environment Specialist Pacific Department, Asian Development.
Advertisements

Programming directions for GEF-6 Climate Change Mitigation
ADB’s Role in Strengthening Environmental Governance and Rule of Law Irum Ahsan Legal Counsel, Asian Development Bank 30 August 2013 Thimphu, Bhutan.
Jong Inn Kim Principal Energy Specialist Energy, Transport, and Water Division, Asian Development Bank ROUNDTABLE APEC Energy Trade and Investment Cairns,
Roundtable for ASEAN Chief Justices and Senior Judiciary on Environmental Law and Enforcement Session 6: ASEAN Environmental Law Challenge No. 4: Planning.
TEEB Training Session 1: Integrating ecosystem services values into decision making.
GREATER MEKONG SUBREGION CORE ENVIRONMENT PROGRAM Component 2: Biodiversity Landscape Conservation and Livelihoods Development Activity Progress and Component.
EU Environmental policy priorities for the period till 2010 Based on the 6 th Environment Action Programme By Nikos Sakkas, LEI Crete, 2002.
Project Financing & Meeting International Social & Environmental Standards in Africa John Miragliotta, Sustainability Pty Ltd
Basic Considerations  outlines the process by which the Government of Kenya will develop its national strategy for participating in an evolving international.
GEF and the Conventions The Global Environment Facility: Is the financial mechanism for the Stockholm Convention on Persistent Organic Pollutants Is the.
1 GREEN GROWTH FOR SUSTAINABL DEVELOPMENT in CAMBODIA 2 nd GREEN MEKONG FORUM Bangkok, Thailand, 21 Oct 2013 Prepared by: DANH Serey, Deputy Secretary-General.
GREATER MEKONG SUBREGION CORE ENVIRONMENT PROGRAM Component 3: Climate resilience and low carbon strategies developed Activity Progress and Component Strategy.
1 CEER How to balance the public’s concerns and critical infrastructure construction Matti Vainio, Deputy HoU DG ENV – C.5, European Commission.
Fermilab Environmental Management System (EMS)
AN INTRODUCTION TO STRATEGIC ENVIRONMENTAL ASSESSMENT
Greening Regional Economic Cooperation in Support of Biodiversity Conservation Outcomes Future Directions for the GMS Mme Keobang A Keola, WREA, Lao PDR.
Training Resource Manual on Integrated Assessment Session UNEP-UNCTAD CBTF Policy Responses and Follow-up Session 4.
Jeneen R. Garcia Reference Group Meeting Bangkok, Thailand September 27, 2010.
Integrated adaptation approach to climate change: Enhancing social and natural climate resilience in the Mekong Geoffrey Blate & Dang Thuy Trang WWF Greater.
System of Environmental-Economic Accounting SEEA Implementation Guide and Diagnostic Tool Alessandra Alfieri UNSD.
UNFCCC Workshops on Synergies and Cooperation with other Conventions Espoo, Finland, 2-4 July 2003 Biological Diversity Perspectives David Cooper, CBD.
GREATER MEKONG SUBREGION CORE ENVIRONMENT PROGRAM Component 1: Environmental Planning Systems, Methods and Safeguards Improved Activity Progress and Component.
Land as a Resource State of play 5 March Land as a Resource: at the crossroad of objectives 1 and 2 of 7 th Environmental Action Programme (EAP)
Environmental Impact Assessment (EIA): Overview
Harnessing the Power of Environmental Data for Decision-Making IABIN Phase II.
Knowledge on HIA IN CAMBODIA Constructing a Caring and Sharing Community Roles of HIA 4-6 October 2012 Bangkok.
Center for International Climate and Environmental Research-Oslo: Research Priorities and Interest in China Lin Gan SINCIERE Member Workshop October 19,
What is environmental law?. Why we love green tape Environmental laws are an essential element in achieving ecologically sustainable outcomes. These laws:
Partnership for Urban South Hampshire Sustainable Growth.
UNDP-GEF Adaptation 0 0 Impact of National Communications on Process of Integrating Climate Change into National Development Policies UNFCCC Workshop on.
UNEP Training Resource ManualTopic 1 Slide 1 Aims and objectives of EIA F modify and improve design F ensure efficient resource use F enhance social aspects.
Spatial mapping as a tool for mainstreaming biodiversity values Subregional Workshop for South America on Valuation and Incentive Measures Santiago de.
1 Inter-American Development Bank Environment and Safeguards Policy - A Strategic Overview.
TEN-T Experts Briefing, March Annual Call Award Criteria.
Forest Carbon Partnership Facility Global Dialogue on Developing a Readiness Preparation Proposal August 13-14, 2009 Structure of the R-PP template Review.
At the last Steering Team meeting… Goals (Rule-level) EPS (Measurable and Reportable) Natural Resources Human/Cultural Environment Administrative Avoid,
GEF 6 Programming Directions GEF Expanded Constituency Workshop Tbilisi, Georgia June 22-24, 2015.
Session 4 Mainstreaming Climate Change Adaptation and Biodiversity Conservation in National, Sectoral and Donor Strategies.
Kyrgyzstan priorities in environment protection B. Tolongutov, Director, State Regulation Center on Environment Protection & Ecological Safety Sector State.
Disclaimer: The views expressed in this document are those of the author, and do not necessarily reflect the views and policies of the Asian Development.
SECTION IV: GENERAL DESCRIPTION OF STEPS TAKEN OR ENVISAGED BY NON-ANNEX I PARTY TO IMPLEMENT THE CONVENTION Workshop on the Use of the Guidelines for.
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
PP 4.1: IWRM Planning Framework. 2 Module Objective and Scope Participants acquire knowledge of the Principles of Good Basin Planning and can apply the.
GEF and the Conventions The Global Environment Facility: Is the financial mechanism for the Stockholm Convention on Persistent Organic Pollutants the.
Environmental Management Plan (EMP) Required for: Full EIA based on Palestinian EIA Policy Category A projects based on World Bank Policy.
INTRODUCTION TO ENVIRONMENTAL IMPACT ASSESSMENT. EIA Procedures and Decision Making 2 Course Learning Objectives At the end of this course you should.
INTERNATIONAL EXPERIENCE AND TRENDS IN EIA FOR DEVELOPMENT PROJECTS Clive George EIA Centre and Institute for Development Policy and Management University.
Mohamed Bakarr Senior Environmental Specialist GEF Familiarization Seminar Washington, DC January 17 – 19, 2012 GEF Strategies, Activities and Accomplishment:
Guidelines for non-Annex I National Communications Implications for Assessment of Impacts of, and Adaptation to Climate Change Asia-Pacific Regional Workshop.
Implementation of critical studies necessary to promote better planning and efficient management of hydropower projects in an Int’l River Basin context.
1 Program For Results Financing OP/BP 9.00 Agi Kiss WB Safeguards Training Workshop Almaty, December 2012.
Sustainable Cities through Environmental Compliance and Enforcement Kenneth Markowitz 19 October 2015.
The Mekong River Commission: Challenges, Mission, and Strategies.
Where and how can REDD+ deliver most benefits? Lera Miles, UNEP-WCMC 7 December 2015.
MEKONG RIVER COMMISSION PROGRAMMES FOR SUSTAINABLE DEVELOPMENT.
©Michel A. Bouchard SOME IRREVERSIBLE DAMAGES 1) Loss of biological diversity and ecosystem services 2) Loss of soil ( fertile soil)
Pilot Project on implementation of SEA for regional planning in Ukraine Prof. Dr. Michael Schmidt Dmitry Palekhov Brandenburg University of Technology.
1 Overview: The Greater Mekong Subregion (GMS) Economic Cooperation Program Overview: The Greater Mekong Subregion (GMS) Economic Cooperation Program.
The Mekong River Commission: Challenges, Mission, and Strategies.
TRAP 5 th interregional meeting & Site Visits Limerick & Lough Derg, Ireland 9 th October 2013 CP3 GP6 Regional Planning Guidelines PP3 – Mid-West Regional.
Introduction to REDD+, status in Asia-Pacific, and the UN-REDD Programme Tim Boyle UN-REDD Regional Coordinator UNDP Regional Centre, Bangkok.
GCF’s Environmental and Social Safeguards
NATIONAL REDD+ SECRETARIAT
Overview Rationale Context and Linkages Objectives Commitments
CP3 GP6 Regional Planning Guidelines PP3 – Mid-West Regional Authority
Relationship between World Bank and Romanian EA requirements
Strategic Environmental Assessment (SEA)
Overview Rationale Context and Linkages Objectives Commitments
Environment Safeguards
Presentation transcript:

ENVIRONMENTAL IMPACT ASSESSMENT: Managing Hydropower, Mining and Infrastructure Development Impacts on Natural Capital Iain Watson Senior Environmental Safeguards Specialist ADB Greater Mekong Subregion Environment Operations Center

  Subregion of exceptional biodiversity – GMS is home to numerous endangered species; Mekong River Basin is among richest globally in terms of fish stocks, which are essential to people’s livelihoods   Recognizing importance of the subregion’s natural capital, the six countries of the GMS – Cambodia, China, Laos, Myanmar, Thailand and Viet Nam – entered into a regional collaboration on the environment and established the Core Environment Program (CEP)   Among key actions being taken through the CEP to safeguard natural capital is mainstreaming environment into planning and decision-making processes, in part through conduct of strategic environmental assessment (SEA) and environmental impact assessments (EIAs) Regional Context: Greater Mekong Subregion

Threats to Natural Capital Posed by Rapid Economic Development Key sectors of energy (hydropower), transport (infrastructure), and mining are experiencing massive investment, nationally and subregion-wide These sectors pose potentially significant site- specific, cumulative and trans-boundary impacts on natural capital, and people

Planning and safeguard approaches to preserving natural capital   SEA coupled with project-level EIA helps ensure that environmental and social risks are understood and addressed, and opportunities for green growth are captured within planning and decision making processes   In the GMS, SEA and related spatial planning and assessment tools have been applied to consider green growth options and integrate environmental and social considerations into economic corridor, and sector development planning   An SEA completed for Viet Nam’s current Power Development Plan is a good example of successful application, identifying potential impacts such as ecosystem fragmentation and economic and social costs associated with different development scenarios, and providing recommendations to conserve natural capital inter alia

Project-Level or Activity-Specific Environmental Impact Assessment   EIA is a structured process to anticipate, analyze and disclose environmental and social consequences of proposed projects or activities   EIA seeks to ensure that potential problems are foreseen and addressed, such that projects can proceed without causing serious environmental degradation or social harm   Overarching objectives of ADB safeguards policy statement for example is to: – – Avoid adverse impacts of projects on the environment and affected people, where possible; – – Minimize, mitigate, and/or compensate for adverse project impacts on the environment and affected people when avoidance is not possible; and – – Help borrowers/clients to strengthen their safeguard systems and develop the capacity to manage environmental and social risks

Projects are required to conduct an EIA to identify potential impacts on physical, biological, socioeconomic, physical cultural resources in the project’s area of influence For projects with potential significant impacts, EIA will examine alternatives to the project’s location, design, and technology; document the rationale for selecting the particular project location, design, and technology, and consider the ‘no project’ alternative Environmental Management Plan will be prepared to avoid, minimize and mitigate adverse impacts; if some residual impacts are likely to remain significant after mitigation, EMP will also include appropriate offset measures Projects need to monitor and report on EMP implementation, describing progress and corrective actions Environment Impact Assessment Good Practice

EIA Good Practice Relevant to Natural Capital   Biodiversity protection and sustainable natural resource management – – Requires projects to identify measures to avoid, minimize, or mitigate potentially adverse impacts and, as a last resort, propose compensatory measures/ biodiversity offsets, to achieve no net loss or a net gain of the affected biodiversity – – Sets out specific requirements on habitat/biodiversity protection and requires the borrower/client to demonstrate the sustainable management of natural resources   Pollution prevention and abatement – – Projects should apply pollution prevention and control technologies/practices consistent with those reflected in the World Bank Group’s Environmental, Health and Safety guidelines (i.e. air emissions and effluent discharges)

EIA Good Practice Relevant to Natural Capital (Cont’d)   Cumulative impact assessment – –Assessments should consider the incremental impact of the project when combined with impacts from other projects and activities already completed, recently commenced, or that will be carried out in the foreseeable future (e.g. multiple hydropower schemes in the same river basin, mining projects in a biodiversity landscape, biodiversity landscape fragmentation due to road construction)   Financial incentives and mechanisms to support investments in natural capital – –Payment for Ecosystem Services schemes, for example, where local communities are involved in managing or protecting ecosystems that provide ecosystem services, such as forest in a hydropower reservoir catchment

EIA Good Practice Relevant to Natural Capital (Cont’d)   Incorporation of climate change considerations and project carbon footprints (i.e. calculation of greenhouse gas emissions) – –ADB sourcebook on Environmental Safeguards provides for consideration of climate change impacts early in project scoping – –Climate change adaptation is increasingly reflected in climate-resilient project designs (e.g. road design and construction) – –Promote technically and financially feasible alternatives to reduce or offset project GHG emissions (e.g. enhancement of energy efficiency, increased use of renewable forms of energy, emissions recovery and/or limitation, biodiversity offsets)

Contract and Permitting   EMP requirements should be incorporated into bid documents, procurement contracts, and permits to operate; separate construction and operation phase environmental management and monitoring plans should be prepared for complex projects, specifying mitigation and monitoring commitments and responsibilities   Once construction is completed, a permit to operate may be required; in this permit, the measures to deal with residual environmental impacts and for monitoring during operation should be elaborated   Standard environmental and social obligations might additionally be attached to concession agreements of development and infrastructure projects; setting out contractually agreed/binding commitments   Enforcement should be strengthened through setting realistic fines and penalties for non-compliance, and providing opportunities to come back into compliance