I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force Renewable Energy Challenges -an Air Force view 1 Ken Gray Energy Rates.

Slides:



Advertisements
Similar presentations
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force 1 Enhanced Use Lease Components, Terms and Conditions Mr. Allan Curlee.
Advertisements

Proposed Federal Renewable Electricity Standard (RES) April 20, 2009.
Renewable Resources Development Report California Energy Commission Business Meeting November 19, 2003 Ann Peterson Project Manager Technology Systems.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e AF Facility Energy Perspective 1 David J. Bek, P.E. Energy Director AFCEC/CN.
FIFTH ANNUAL FEDERAL ENERGY WORKSHOP & DEFENSE ENERGY PARTNERSHIP FORUM | PAGE 2 Peter Y. Flynn, September 16, 2014 Utilizing ESPC to Develop Renewable.
Promoting Renewable Energy Development on Closed MA Landfills Sarah Weinstein, Massachusetts Department of Environmental Protection, AEHS Foundation, UMass.
 PACE & RECAP: Financing Renewable Energy Michelle Hickey, ISEA Program Coordinator Illinois Solar Energy Association 1.
2011 ADC WINTER FORUM | PAGE 1 Navy Use of § 2922 Authority CAPT Clayton Mitchell NAVFAC Energy Office.
2011 ADC WINTER FORUM | PAGE 1 Developing Renewable Energy Projects on DoD Land Mr. Alan D. King Assistant Secretary of the Army for Installations, Energy.
Does owning a solar array make you a utility?...and other questions A presentation to the Kentucky Environmental Quality Commission Andrew Melnykovych.
Nellis AFB, NV ‘Solar Power System’ Photovoltaic Power Project Mr. Steve Dumont August 2007 ACC/A7OE.
1.  What is a Renewable Energy Credit (REC)?  What are they used for?  Who uses them?  How is REC ownership tracked?  What is the Renewable Portfolio.
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
Community Energy Opportunities Jon Bell Business Development Manager Mosscliff Environmental Ltd.
University of Pittsburgh School of Law 2013 Energy Law & Policy Institute October 14, 2012 Citizens for Pennsylvania’s Future (PennFuture). A statewide.
1 Invenergy. 2 Invenergy Introduction Developer, owner and operator of power generation projects. Focused on the development of renewable energy and natural.
United States Air Force I n t e g r i t y - S e r v i c e - E x c e l l e n c e Moody Water and Wastewater Plant Initiative Lt Col Patrick Albritton, 23.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force 1 “To BRAC or Not to BRAC” What happens if there is not a BRAC? ADC.
Engineering Technology Division
AZ APA Conference September 29, 2011 Solving a Solar Land Use Issue Bruce Plenk, City of Tucson Solar Energy Coordinator.
Our mission ead and execute environmental programs and provide expertise that enables Army training, operations, acquisition and sustainable military communities.
DESC Small Business Forum Newport, RI Installation Energy September 10, 2009.
By Madison Sorel Wind current spins rotor of a turbine Rotor drives shaft of generator Generator produces electricity Electricity is distributed to Citizens.
1 Utility Ownership of Wind Power: Why it makes sense now American Wind Energy Association May 17, 2005 Eric Markell Senior Vice President Energy Resources.
Terra-Gen Power, LLC California Renewables Portfolio Standards: Challenges and Opportunities CCPUC Annual Meeting October 5, 2009.
Results of Geothermal Power Survey of Electric G&T Cooperatives Robert Putnam, CH2M HILL Bob Gibson, NRECA Steve Lindenberg, Lindenberg Consulting.
North Eastham Wind Feasibility Study Results Brian Eastman Eastham Energy Committee Kristen Burke Massachusetts Technology Collaborative Ric O’Connell.
Washington State Energy Facility Site Evaluation Council Region 10 Regional Response Team Northwest Area Committee Seattle, WA February 12, 2014 EFSEC.
Presentation to San Diego Sierra Club Richard Caputo 12 Nov 07 Renewable Energy Parks.
Developing and Integrated Energy Conservation and Renewable Strategy Renewable Energy Leadership Summit June 7, 2005 Lenox, MA.
Phoenix Convention Center Phoenix, Arizona Implementing Renewables Through Your Utility Innovation Track 10 Partnering with Your Utility To Do Large-Scale.
NW Regional -- Washington n n Washington’s residents, businesses and industries spend $10 billion on their energy costs each year. n n Washington’s long-term.
Federal Energy Management Program Renewable Working Group Renewable Power Purchases at Federal Facilities By David McAndrew Federal Energy Management Program.
Leveraging Renewable Energy in Data Centers Ricardo Bianchini on tour 2012.
The Texas Renewable Energy Program National Governors Association Scottsdale, Arizona April 29, 2004.
Phoenix Convention Center Phoenix, Arizona ANDREA L. KINCAID DLA Energy Integrated Energy TrackIntegration of the Energy Industry.
Selecting Renewable Projects at Colorado Springs Utilities APPA Conference John Romero GM Acquisition, Engineering and Planning October, 2009.
The Future of Electric Power In Utah January 12, 2010.
1 PURCHASING ENVIRONMENTALLY PREFERABLE ELECTRICITY Governor’s Green Government Council Commonwealth of Pennsylvania Catherine Brownlee Executive Director.
2013 ADC INSTALLATION INNOVATION FORUM | PAGE 1 How to Determine to Pursue an EUL or PPA Mr. Brian Brown Chief – Air Force Strategic Asset Utilization.
The Energy Bill: Geothermal Interests July 30, 2002 Bob Lawrence and Associates, Inc Alexandria, VA.
Phoenix Convention Center Phoenix, Arizona ANDREA L. KINCAID DLA Energy Track 5 Project FinanceSession 6 Renewables Through Private Financing.
The OSB Environmental and Natural Resources Section The Promise of Development: Natural Resource Issues in a New Economy May 7-8, 2009.
Feed In Tariffs A Policy for Rapidly Expanding Renewable Energy Deployment.
2013 ADC INSTALLATION INNOVATION FORUM | PAGE 2 Energy Security Air Force Civil Engineer Center Perspective Mr Billy P. Webb, P.E. AFCEC/COSC January.
1 Accommodating Utilities in Highway Rights-of-Way Federal Agency Update IRWA/AI Conference Las Vegas, NV January 13, 2009.
Riga 4th December 2008 Renewable energy: is there a Latvian masterplan? Ieva Indriksone Riga Graduate School of Law.
September 17, 2002 Van Jamison, POWAIR and Global Environment and Technology Foundation POLLUTION PREVENTION TEMPLATES WESTAR Technical Conference Snowbird,
Jason Marks Commissioner, NM PRC May 21, 2010 New Mexico Regulatory Context Southwest Renewable Energy Transmission Conference.
Investing Our Energy In You Traverse City Light & Power Electric Generation TCL&P Study Session December 1, 2009.
Renewable & Alternative Power Senate Energy, Utilities & Communications Committee Stuart R. Hemphill Director, Renewable and Alternative Power Southern.
MGE ISSUES. 2 ENERGY 2015 MGE’s plan to meet the energy needs of our customers Solicit customer input Community Energy Conversations.
0 RPS Program and Progress Senate Energy Committee December 15, 2011.
1 Sunrise Powerlink Project Update Orange County Business Council March 10, 2009.
Solar Power Project at the Sacramento Regional Wastewater Treatment Plant August 26, 2015.
CEC Workshop -- Renewable Progress, Challenges, and Opportunities Monday, May 11 th, 2015 Tim Tutt Powering forward. Together.
C A L I F O R N I A E N E R G Y C O M M I S S I O N Integrated Energy Policy Report Workshop Landscape-Scale Environmental Evaluations for Energy Infrastructure.
E BDS Wind Energy Development Issues for Local Governments and Municipal Utilities Presented to: International City/County Managers Association.
Presented to ABA RADER Committee/Columbia Law School's Environmental Law Society Symposium INTRODUCTION TO RENEWABLE ENERGY DEVELOPMENT Becky.
Renewables Portfolio Standard Status Report California Public Utilities Commission February 26 th, 2008.
Purchasing Renewable Power/RECs in the Federal Sector Federal Environmental Symposium May 4, 2006 Chandra Shah, NREL ,
Transforming Renewable Energy at the U.S. Department of Energy OFEE Symposium East – June 2008 Anne Sprunt Crawley U.S. Department of Energy.
March 24, 2016 Kentucky Municipal Energy Agency Consideration of Renewables.
Staples: Developing an Integrated Renewable Energy Strategy.
WSSC Solar PV PPA Phase 2 Rob Taylor Energy Manager May18, 2016.
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,
Unclassified1 Competitive Acquisition of Renewable Energy & Renewable Energy Certificates Andrea L. Kincaid, Contracting Officer Electricity & Renewables.
Plainfield Renewable Energy
Base Renewable Projects Legal & Regulatory Hurdles
National Environmental Policy Act of 1969 (NEPA)
Presentation transcript:

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force Renewable Energy Challenges -an Air Force view 1 Ken Gray Energy Rates and Renewables Branch Chief Air Force Civil Engineer Support Agency 16 Feb 2011

I n t e g r i t y - S e r v i c e - E x c e l l e n c e THINK GREEN, BUILD GREEN, Air Force Renewable Program In FY10, 6.4 % of all electricity from Renewable sources 33 MW of on base generation, operating currently 26 MW on base generation, under contract and construction currently Over 100 MW in development and discussion Utilizing geothermal, solar, wind, hydropower, landfill gas Major efforts to add Biomass Waste to Energy and Woody Biomass 2

I n t e g r i t y - S e r v i c e - E x c e l l e n c e THINK GREEN, BUILD GREEN, Legal Hurdles 40 USC 591 –Comply with State Law (use jurisdictional provider) National Environmental Policy Act State Law Renewable Portfolio Standards ( RPS) 3

I n t e g r i t y - S e r v i c e - E x c e l l e n c e THINK GREEN, BUILD GREEN, Planning Hurdles Mission Impact Reviews Greatest land use value decisions Real estate instrument decisions Reuse concepts for land parcels Transmission location Utility Connection agreements 4

I n t e g r i t y - S e r v i c e - E x c e l l e n c e THINK GREEN, BUILD GREEN, Contractual Hurdles FAR Procurements Terms of payments Experience level of staff 5

I n t e g r i t y - S e r v i c e - E x c e l l e n c e THINK GREEN, BUILD GREEN, Davis Monthan PV Array Case Study Initial effort to build Waste to Energy at DM met resistance and was unsuccessful Reopened discussion with Tucson Electric Power (TEP) on a solar array TEP declined to participate and provide requested renewable power May 08- began acquisition planning Jul 08- issued RFP Jan 09- Cancelled RFP Dec 09 – Environmental Assessment Completed Jan 10 – RFP Reissued Apr 10 – Received proposals Sep 10- Awarded to Sun Edison 6

I n t e g r i t y - S e r v i c e - E x c e l l e n c e THINK GREEN, BUILD GREEN, Davis Monthan PV Array Case Study 7

I n t e g r i t y - S e r v i c e - E x c e l l e n c e THINK GREEN, BUILD GREEN, Davis Monthan PV Array Case Study Sun Edison will Design, construct, own, operate, maintain 14.5 MW PV array Sell power to DM AFB at $0.045/kWH with 1.5% annual esc Sell RECs to Tucson Electric Power to offset DM AFB kWH costs Davis Monthan AFB will Provide land for the array through a land use document Sign a standard utility purchase contract with Sun Edison Average savings of $500K/ year Will provide ~ 35% of base’s annual electricity needs 8

I n t e g r i t y - S e r v i c e - E x c e l l e n c e THINK GREEN, BUILD GREEN, Davis Monthan PV Array Case Study Lessons Learned Establish land ownership early REC sale issue had to be considered Air Force internal site approval/mission impact takes time NEPA Must be well coordinated at beginning Typically longest presolicitation requirement Rework and delay for additional Fish and Wildlife Study State law and regulation very critical 9

I n t e g r i t y - S e r v i c e - E x c e l l e n c e THINK GREEN, BUILD GREEN, First Air Force RE Industry Day Held 8 Dec in Irving TX Very productive and successful in starting discussion Additional Requests for Information (RFIs) out to gain Industry Inputs and Ideas Review and consideration of Industry Inputs and Ideas Next planned focus meeting at AF Energy Forum in DC, May/June 10