HV connection for a Common GEM foil design Aiwu Zhang 2015-03-09.

Slides:



Advertisements
Similar presentations
LEGO CASE BY SOC. Phone building Lets build this phone First you will build you base of the phone the (key pad) Next you will build the base for the head.
Advertisements

Year 8 Design Technology 2 Point Perspective. Introduction Two point perspective is a 3D drawing with a horizon and two vanishing points. By using your.
General Information Dimensions · Structure Width: ~ 197in. (16.4’), 99in. (8.2’)/car · Slope Angle: 5 degree · Structure Height (Front): 100in. + base.
MINI BOX. STANDARD BOX MAGNUM BOX SPINDLE ASSEMBLY.
SQUARE PAD PCB DESIGN Elizabeth Starling, Jerry Collins Florida Institute of Technology High Energy Physics Lab A January 26 th, 2015.
1 Module and stave interconnect Rev. sept. 29/08.
Investigation #1 Let’s review what has happened so far in this story… A) Thirty-two people are coming to the reunion. B) Mrs. Comfort has ordered 8 square.
Nilanga Liyanage University of Virginia UVa GEM Team Dr. Kondo Gnanvo, Dr. Vladimir Nelyubin, Kiadtisak Saenboonruang, Chao Gu, Xinzhan Bai, Jie Liu, Seth.
Chamber PCB s, FEB s, Cooling, HV/LV Distribution 1)PCB designs-track widths, track to track distances … 2) Double sided and Multi layer, modular approach.
SpectraSonde Assembly. What is the SpectraSonde? Reads temperature, pressure, and humidity data from the atmosphere. The SpectraSonde doesn’t fly like.
Ch 17 communicating solutions 1.Alphabet of lines- technical lines used in multi-view drawings.
Mantle Clock. Beginning Steps Cut 2 piece 20 x 5 to make the 2 sides and top/bottom Cut 1 10 ¾ and 1- 9 from each 20 piece. This will make a side and.
The printed circuit board (PCB) design
1 SBS Spectrometer / GEP5 Conf.. 2 Tracking Requirements Requirements Tracking Technology DriftMPGDSilicon High Rate: MHz/cm 2 (Front Tracker)
Rate and Gain Measurements of the 1-m long GEM detector Aiwu Zhang EIC tracking R&D weekly meeting.
1 EECS 373 Design of Microprocessor-Based Systems Prabal Dutta University of Michigan Lecture 13: PCB Design Oct 12, 2010 Some material from Mark Brehob.
G.Bencivenni LNF/INFNMuon Meeting 21-October-2002 Status Report on triple-GEM detector M.Alfonsi 1, G. Bencivenni 1, W. Bonivento 2,A.Cardini 2,C. Deplano.
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
1 Module and stave interconnect Rev. sept. 29/08.
AnaSonde-3M Assembly. What is the AnaSonde-3M? The AnaSonde-3M reads temperature, pressure and humidity data from the atmosphere. After the AnaSonde is.
Part II: Using PCB Layout Software – Custom Component Libraries
1 Physics of Compressed Baryonic Matter 12 th CBM Collaboration Meeting R&D ON MICRO-CABLES FOR BABY SENSOR RADIATION TEST MODULE October , 2008.
Malte HildebrandtDC Status Report, Dear MEG Committee,PSI, April 14 th 2009 this is the first report concerning the drift chamber status as.
Agriscience Toolbox Plan of Procedure 1. Table Saw (equipment) Rip the bottom of the toolbox to a width of 10 inches.
1 Jim Thomas - LBL New Pad Plane Design Proposal & Specifications Jim Thomas, John Hammond, Bob Scheetz, Jon Wirth, etc., etc., and a cast of thousands.
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
ASSEMBLING THE PCB – V3.914 Hold the PCB as shown below.
— Test board for CBM01B2 baby detectors — Anton Lymanets & Johann Heuser CBM collaboration meeting GSI, 27 February 2008 Microstrip detector testing at.
Detector R&D for Muon Chamber Anand K. Dubey For VECC group.
Modular Origami Cube. Making a Cube You will need 6 squares of paper. You will need at least 3 different colors of squares (e.g., 2 red squares, 2 yellow.
Construction and first commissioning of the self-stretched gas electron multiplier (GEM) detector J. Twigger, V. Bhopatkar, J. Wortman, M. Hohlmann 77th.
Trace connecting two pads! More than 45 degree bends Traces too close together Rule of thumb: traces at least 40 mil apart.
Update on SBS Back Tracker UVa K. Gnanvo, N. Liyanage, V Nelyubin, K. Saenboonruang, Seth Saher, Nikolai Pillip (visiting from Univ. Tel Aviv, Israel)
Performance of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger,
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
1 4 PCB: LEFT TOP 115 channels, LEFT BOTTOM (115), RIGHT TOP (106), RIGHT BOTTOM (106). For LEFT TOP board 115 channels we have: 115 smd connectors (AMP.
Design Studies 20 ‘Show Off’ Project How to make a computer monitor In Google Sketchup By: Liam Jack.
Technological Design Basic Dimensioning with AutoCAD How to annotate simple drawings for use in constructing an object.
Itzhak Tserruya, July 7,  Towards HBD Proposal  Ongoing activities and plans for the next two months Itzhak Tserruya HBD meeting at BNL, September.
1 Jim Thomas - LBL Changes to the Inner Sector Strongback to accommodate a wall between the inner and outer sectors (and a 2 nd wall at the innermost edge.
LEGO Construction Tips.
F.Murtas1 LUMI GEM Bremsstrahlung Dafne Bhabha Dafne Upgrade.
Coordinate Detector: prototype design General idea about the Coordinate Detector (CDET) so far: Three independent vertical planes with 15 cm plastic shield.
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
Construction and beam test analysis of GE1/1 prototype III gaseous electron multiplier (GEM) detector V. BHOPATKAR, E. HANSEN, M. HOHLMANN, M. PHIPPS,
Yulan Li, Tsinghua Uni. TILC08, 3-6 March, 2008, Sendai, Japan Performance Study of TU-TPC Prototype Using Cosmic-ray  Tsinghua University TPC group 
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
The printed circuit board (PCB) design §PCB design is part of the design process of a product in electronics industry. §PCB is a piece of insulating plastic.
Lean Notes Page. Lean Notes What are the four things that need to get written on the reference edge ?_______ ______ ______ ______ This written information.
Results on a Large Area triple-GEM Detector at LNF 5 th RD51 Collaboration Meeting Freiburg, 25 May 2010 D. Domenici - LNF.
Tessellation Project Supplies needed: 3 x 5 index card for every 2 students Scissors Ruler One sheet of white paper One sheet of construction paper Pencil.
FNAL beam test data analysis A Hands-on session at CMS Upgrade School Aiwu Zhang Florida Institute of Technology On behalf of the CMS GEM collaboration.
MATTING. REMEMBER… Matt Board is expensive. Measure twice, cut once. Lay your matt board on something clean… on newsprint for example, NOT the floor!
T2 GEM Production in Helsinki Kari Kurvinen TOTEM T2 EDR meeting Radiation Detector Laboratory of Helsinki Institute of Physics (HIP) and Department.
MPGD TECHNOLOGIES AND PRODUCTION GEMMicromegas Resistive MSGC (NEW!) Rui De Oliveira 7/12/20111Rui De Oliveira.
WeldingRod’s Exactly Constrained 3D Printer Plate Identification and Stuffing.
A High Eta Forward Muon Trigger & Tracking detector for CMS A High Eta Forward Muon Trigger & Tracking detector for CMS Archana Sharma For CMS High Eta.
Section N4A4 Gaseous Detectors: R&D II.
Artist Portrait and Artwork
How to make alu foil packages
ob-fpc: Flexible printed circuits for the alice tracker
Start on the corner of your picture *(Not the corner of the paper)
Divide into meridian sections – Gore development
HPS Motherboard Electronic Design
The WHITE Corners Lesson 3.
Break down Lance rack Cut one of each of these for each rack
Surface Area.
(On Behalf of CMS Muon Group)
Miniature Train Smoke Stack.
Intro to Arduino Part 2 The Breadboard
Presentation transcript:

HV connection for a Common GEM foil design Aiwu Zhang

2 The foil is divided to sectors on the top, while it is not segmented on the bottom. 550 mm ~946 mm 30 degrees

Center line 1.Vias are used. red color stuff on top foil, blue color stuff on bottom foil. -> Explain on HV connection: FIT HV pads all on top foil. (6 for top HV and 6 for bottom HV). We bring these pads, using spring pins, to the drift board to make HV connection. For a triple-GEM, we cut away 8 of the pads on each foil to allow spring pins go through the foil. 3. For FIT, we use 10M SMD resistors for each sector for protection. After the resistors, we have a common HV line goes to the 6 FIT HV pads. We also have a short common HV line on the bottom, goes to the 6 FIT HV pads through vias. 4. For UVa, their protective resistors are not on the foil, and they want to be able to test each sector once the chamber is closed. So individual HV pads are arranged for UVa, those pads are connected to each sector through the vias.  A global view at the wide end FIT HV pads UVa HV pads FIT protective resistors

-> Explain on mechanically assembling a chamber: 6. The gray pads, with a 2 cm pitch, are mechanical holes on the foil. UVa can use them to close a chamber; FIT can use them to make a GEM stack for stretching. 7. For FIT, we need to have square holes in the foil, to allow us put nuts in for stretching. The square holes must be siting in the same row of those mechanical holes. (note that FIT HV pads are also in the same row.)  A global view at the wide end. 4 Center line Mechanical holes Square mechanical holes for FIT stretching

The left part Note that we have 4 horizontal sectors at lower end, the left 4 resistors are connected to those sectors. 5 Vias needed (connect red trace to blue trace)

~6.1mm 20mm 3mm 5.8mm 9.5mm 3mm Dimensions. Need to optimize, especially along the R direction. All trace width: 0.2mm Copper edge of a foil 6 1.8mm

2.5mm Dimensions. Need to optimize, especially along the R direction. 7 Just pay a little attention to that corner (will be the same at the right side of foil) 15mm

8 ref.: High Voltage Engineering - J R LUCAS, 2001 (Chapter 1) Breakdown voltages for Ar and CO2: Ar: 0.9 torr cm = 0.9* *10 atm mm = atm mm at 1 atm, it is 137/ = ~11211 V/mm -> breakdown happens at ~1100 V for a 0.1mm gap. CO2: 420/(0.51* *10)=60642V/mm -> breakdown happens at 6064V for a 0.1mm gap.

9 UVa HV pads FIT HV pads (for top) FIT HV pads (for bottom) Holes for assembling UVa HV pads (for bottom). Can be on top and connects through a via Square holes for FIT for stretching FIT resistor Common HV line A via Backup