HEAnet's relocation: Moving the Network and Services Brian Nisbet Network Operations Team BN227-RIPE.

Slides:



Advertisements
Similar presentations
9/11 - Respond and Recover: A Case Study Joy Heath-Porter Sidley Austin Brown & Wood LLP LawNet 2002 August 21, 2002.
Advertisements

Infrastrukturë Backbone ALBANIAN NATIONAL FIBER OPTIC NETWORK.
TAB Data Center Renovation Project Planning for Transition of Summer 2013 February 21, 2013 TAB Atrium.
Networking Phone Systems Cabling and Wiring Server and Desktop Support Server and Network Virtualization Switches Routers and Hubs Hardware and Software.
Shift Move to ACR Shifts are taken solo since Aug. 1, 2010 – The shifter stays alone without anyone nearby from the late night though the.
IPv4 to IPv6 Migration strategies. What is IPv4  Second revision in development of internet protocol  First version to be widely implied.  Connection.
Annie Griffith Infrastructure Programme Manager 12 th July 07 Gemini Oracle Software Upgrade (OSU) Project.
RHP 12 Learning Collaborative.  Learning Collaborative Event Summary  Facebook page  RHP 12 Webpage  Update on Cohorts  Upcoming Webinar in June.
NETS Network Upgrade!.  304 Telecommunication Outlets (TO's) each with 4-copper and 4-fiber connections were installed.  255,000 Feet of CAT6A copper.
Mynydd Isa Branch Closure Roseneath Medical Practice is due to move into new custom built premises in early The Practice wishes to ensure that all.
Moving the “Brains” of the district MOVING THE ENTIRE DATACENTER OF LAKE MILLS SCHOOL DISTRICT Chris Czerniak, CETL
© University of Reading IT Services 21 May 2015 Exchange Update The past & the future.
6/3/20151 MARS... and the YEAR 2000 Management Administrative and Reporting System Commonwealth of Kentucky.
Gemini issues Ritchard Hewitt Gas Codes Development Manager.
September 2014 Lesson Learned Summary. September 2014 LLs 2 Three NERC lessons learned (LL) were published in September 2014 LL Redundant Network.
Six Sigma Academy N Scottsdale Rd Suite 250 Scottsdale, AZ Phone: (480) Phone: (480) Between NOW and 1/24 take a little time.
Services Tailored Around You® Business Contingency Planning Overview July 2013.
CBPA Computer Lab Redesign Development of the Career and Placement Center Ted Strickland Department of Computer Information Systems March 21, 2005 DRAFT.
Evitherm MTR 07 Sept 04 Phill Giles Thermal Technology Consulting (TTC) Evitherm project mid-term review Work Package 2 Phill Giles Thermal Technology.
Current Job Components Information Technology Department Network Systems Administration Telecommunications Database Design and Administration.
BUSINESS AS USUAL. NO MATTER WHAT.. Business Continuity Is About The Future. BUSINESS AS USUAL. NO MATTER WHAT. The future of your family. The future.
IT Update Trey Felton ERCOT IT Service Delivery February 2012 ERCOT Public.
Objectives: Develop a solution to either enhance or replace the FasTrak tool Scope/Why is this important?: Increase the transparency for issues that are.
HEAnet Major Developments Update 10 th Nov 2005 John Boland, Chief Executive.
Welcome To Business Summary DiveIn Incorporated is a small company that specializes in the sales of swimming pools supplies to homeowners by mail order.
Background Info - The state of the campus telecommunications infrastructure in December 2001.
Webster Visualize Webster Financial Team Visual Scrumware Joe Andrusyszyn Mark Bryant Brian Hannan Robert Songer.
LIANZA Sept Getting it together for libraries : Designing a collaborative learning centre Karen Kealy, Manager, Planning and Projects Information.
VP2 CLIENT DESIGNED SOLUTIONS Lee Chant. 2 DELIVERY - A CHANGING LANDSCAPE Customer buying profile has changed Desire to outsource piece’s of work Desire.
Delivering Advanced Connectivity to Ireland’s IoTs Owen Byrne 09/11/06.
Operations in HEAnet Brian Nisbet NOC Manager. Operational Overview 30+ Technical Staff. – 75% of whom participate in NOC Duty. 60+ Clients. Expanding.
UKNOF 3 How to integrate 13 networks into one and live to tell the tale Cogent Communications st Street NW Washington DC USA
Objectives: Develop a solution to either enhance or replace the FasTrak tool Scope/Why is this important?: Increase the transparency for issues that are.
1 Presentation to Technical Services Step 1 - Walk-through of new premises Step 2 – This presentation will focus on next steps to relocate staff and departmental.
Myles Fenton January 2008 Monash Internet service 2008.
Objectives: Develop a solution to either enhance or replace the FasTrak tool Scope/Why is this important?: Increase the transparency for issues that are.
Campus Network upgrade and Wi-Fi Rollout REVIEW AND PHASE 3 PROJECT MANAGER TASKS.
Substation L1/ Booster Substation Y-BE2 Update #3 August 15,2012.
Request for Service (RFS) Process and Metrics Update June 24, 2008.
Asia Pacific CUCM Relocation July, Executive Summary Business Problem: We currently have five servers located in Japan serving IP Telephony call.
How to Build a NOC. Identify Customers –Who are your customers? Understand Customer Expectations –What are your user expectations? –SLA’s? Support Service.
Outage Scheduler Transition Plan Kenneth Ragsdale NATF.
All Experimenters’ Meeting January 26, Accelerator Operation Summary Calendar Week # 03 NuMI Weekly Integrated Intensity 2.74 E18 protons Beam.
Objectives: Upgrade Siebel to a supported application Upgrade Oracle database to current version Deliver all existing user functionality with no degradation.
A new national network Andrew Mackarel Andrea Tognola Dave Wilson.
Intro to Exam System Dr Mike Spann May 3 rd 2011.
Network Move & Upgrade 2008 Les Cottrell SLAC for SCCS core services group Presented at the OU Admin Group Meeting August 21,
NT1210 Introduction to Networking
FIBER OPTIC INTERNET Tierzero has been serving businesses in Southern California since 1997.
Defra Childcare Services Bidders Day Foss House, York Nursery Site Presented by: Defra HR, Procurement & Estates Date: Monday 20 th January 2014.
AHVLA Weybridge Nursery Site Introductions AHVLA HR and Defra HR Teams will be leading the technical side of the procurement process and will answer questions.
HEAnet’s Optical Backbone & Schools Connectivity Brian Nisbet Network UKNOF 29, Belfast.
Campus wide Ticketing Tool for UC Berkeley
Documentation & Troubleshooting Guide
Fire in Vattenfall Customer Service Nordics Headquarter in Umeå
7 Factors Event Planners Should Never Forget About To Ask
Customer Overview Pack – September 2018
Business Contingency Planning
Xoserve IX Refresh Update
Customer Overview Pack – September 2018
Xoserve IX Refresh Customer Update 12/02/2019.
Customer Overview Pack – July 2018
Customer Overview Pack – July 2018
Xoserve IX Refresh Customer Update 03/01/2019.
Xoserve IX Refresh Customer Update 04/04/2019.
TAG Agenda – April 6th 2006 Minutes from last TAG meeting – 13.45
Xoserve IX Refresh Customer Update 05/03/2019.
Trillo Apparel Company Revised Delivery Plan
Xoserve IX Refresh Customer Update 04/04/2019.
Xoserve IX Refresh Customer Update 01/05/2019.
Presentation transcript:

HEAnet's relocation: Moving the Network and Services Brian Nisbet Network Operations Team BN227-RIPE

Moving, Step-by-Step Planning Informing Moving –Services –Schools –Office –Network Cleaning-Up

Planning Move announced in early 2006, to be completed by July Five month timeframe to move all equipment and personnel out of Brooklawn House. Company-wide activity. Aim to minimise cost and disruption to all users of the network and services.

External Dependencies Two Landlords. Two groups of Building Contractors. One firm of Furniture Movers. Two providers of Co-lo services. Four Telecommunications Companies. A large number of very patient Clients.

Spreading the Word Clients had priority… …but detailed information was slow to come. Important dates were difficult to pin down from a long way off. Some important events were at short notice due to availability of people/equipment. Continued attempts to give as much warning and flexibility as possible.

Services Move HEAnet services supported by: –> 70 servers –6 switches –2 routers Client co-location equipment requirements amount to 10 racks Moved from Brooklawn House, Ballsbridge to ServeCentric, Blanchardstown Move commenced planning in January 2006 Tendering & ordering commenced in February 2006, completed in May Move of equipment commenced mid May 2006, ended July Project commenced and completed on schedule, within budget!

Schools Services Move Schools services moving from Brooklawn House to Servcentric. Ten servers and some networking equipment. And the solution – more than forty pieces of equipment and over one kilometre of cat5! No actual interruption to IP connectivity to individual schools.

Exodus 1 st Floor, 5 George’s Dock, IFSC, Dublin 1. New office was built from scratch, completely different requirements to old tenants. Fewer offices, much bigger comms room. Slow dismantling of Brooklawn House, prior to a one weekend move of furniture, fixtures and people.

Exodus Left work in Ballsbridge on Friday 21 st July, went to work in the IFSC on Monday 24 th July. Office fully recabled and connected to the outside world (phone & data) by Sunday evening. Full onsite NOC operations resumed by 09:00 on Monday morning. Everything fully back to normal by Tuesday.

Client/Network Moves (1) Aim to remove the Brooklawn House (BH) PoP from the network and move all clients to other PoPs with minimal downtime. Not everything was possible within the timeline. All clients moved by 8 th September, some remaining work to do due to provider capacity issues. Expected to be resolved by the end of Longest outage – 48 hours. Shortest outage – 1 minute.

Client/Network Moves (2) Stage 1: Create full access PoP in Citywest. Stage 2: Set-up temporary HEA PoP. Stage 3: Migrate BH clients to either Citywest or DCU on a per Telco/per technology basis. Stage 4: Client moves out of temporary HEA PoP and final moves/reconnects of any remaining circuits.

Stage 1 – Access PoP for Citywest Temporary equipment taken from testlab and put back into production. Freed-up production equipment moved to Citywest. Circuit migration started from BH -> CWT.

Step 2 – Temporary HEA PoP Layer2 PoP only. Space allocated by the HEA. Two sets of fibre cuts and rack moves. One evening’s work in both cases. Unexpected fibre runs, both into and within BH. PoP connected to the backbone via Bluenet circuit. Not a viable long-term solution, planned to be in use until late 2006.

Stage 3 – Client Migration Citywest PoP Technologies – SDH & Ethernet Clients – DIAS, DIT, EPA, HEA, HETAC, HRB, ICHEC, IUA, ITB, ITnet, NCAD, NCI, NUIM, RCSI, TippInst, UCD. DCU PoP Technologies – Serial Clients – CDVEC Crumlin, CDVEC Killester, CDVEC Liberties CDVEC Whitehall, NQAI, NUI, RIA. Largest single move was six clients.

Stage 4 – Final Steps Current clients using the HEA PoP should be migrated out by end of Notification that capacity issues have been solved and lead time of twenty days. Chasing final circuit reconnects with Telcos. Final audits of all network monitoring and documentation.

Questions? (Comments, Queries…)