Processing Lab 3 – Header issues and trace editing Bryce Hutchinson Objectives: Fixing elevation issues Define an LMO function Pick first breaks Kill traces.

Slides:



Advertisements
Similar presentations
The essentials managers need to know about Excel
Advertisements

Tutorial 3 Refractor assignment, Analysis, Modeling and Statics
Mouse Tutorial for Win XP In this tutorial you will learn to: Move the mouse Click and double click Make selections Manage windows Use menus Click the.
KompoZer. This is what KompoZer will look like with a blank document open. As you can see, there are a lot of icons for beginning users. But don't be.
Microsoft Office XP Microsoft Excel
 Use the Left and Right arrow keys or the Page Up and Page Down keys to move between the pages. You can also click on the pages to move forward.  To.
Overview Lesson 1. Objectives Step-by-Step: Start Excel 1.Click the Start menu, and then click All Programs. 2.On the list of programs, click Microsoft.
Presented by: Benefits Systems Support. Getting Started ê Open Powerpoint, create a blank presentation. ê Select a style for your first slide from the.
Loading Excel Double click the Excel icon on the desktop (if you have this) OR Click on Start All Programs Microsoft Office Microsoft Office Excel 2003.
EXCEL Spreadsheet Basics
Using Excel to Understand Your Data Clayton County Public Schools Department of Research, Evaluation and Assessment Assistant Principal In-Service.
Microsoft Word 2010 Lesson 1: Introduction to Word.
Word Processing First Steps
Chapter 10—Creating Presentations
Windows XP Basics OVERVIEW Next.
Introduction to Excel 2007 Part 2: Bar Graphs and Histograms February 5, 2008.
Introduction to Windows File Management
Getting Started with Layout Compiled by Ryan Johnson May 1, 2002  Open Orcad Capture under Engineering Software  Under FILE, choose NEW, PROJECT  The.
Microsoft Windows Vista Chapter 6 Customizing Your Computer Using the Control Panel.
XP New Perspectives on Microsoft Office Excel 2003, Second Edition- Tutorial 11 1 Microsoft Office Excel 2003 Tutorial 11 – Importing Data Into Excel.
ABC’s of PowerPoint (Office 2007) Part 1: Basic Vocabulary Part 2: Cursors Part 3: Insert Your Text Part 4: Insert Your Pictures Part 5: Basic Tools &
Inventory Throughout this slide show there will be hyperlinks (highlighted in blue) follow the hyperlinks to navigate to the specified Topic or Figure.
Review of last session The Weebly Dashboard The Weebly Dashboard Controls your account and your sites Controls your account and your sites From here you.
Google Earth How to create a Google Earth Tour and place it in your Wiki.
Adobe Forms THE FORM ELEMENT PANEL. Creating a form using the Adobe FormsCentral is a quick and easy way to distribute a variety of forms including surveys.
Using Excel To help with data. Excel is a spreadsheet program that can interface with Word, or PowerPoint A spreadsheet program has cells (little blocks)
Building and managing class pages on our new Web site School Wires Training.
1 iSee Player Tutorial Using the Forest Biomass Accumulation Model as an Example ( Tutorial Developed by: (
Microsoft Excel By: Dr. K.V. Vishwanath Professor, Dept. of C.S.E,
Microsoft PowerPoint Getting Started Guide Prepared for Towson University Dr. Jeff M. Kenton Amy Chase Martin 2007.
Download Dropbox Download should start immediately Save download file:
World Cities PowerPoint Tutorial Mrs. Bushman. Take Flight In iMovie Choose Your Path Movies in PowerPointAction Buttons.
IC 3 BASICS, Internet and Computing Core Certification Key Applications Lesson 10 Creating and Formatting an Excel Worksheet.
How to use the internet The internet is a wide ranging network that thousands of people use everyday. It is a useful tool in modern society that once one.
InDesign CS3 Lesson 4 ( Only pages ) Importing and Editing Text.
Basic iPad Operations By Anjie Carpenter. Part I: Navigating the iPad.
Photo Story 3 Importing Pictures. When you create a new Photo Story, the first thing that you will do is import pictures. You can import pictures from.
Office Management Tools II Ms Saima Gul. Office Management Tools II Ms Saima Gul.
Page 1 Non-Payroll Cost Transfer Enhancements Last update January 24, 2008 What are the some of the new enhancements of the Non-Payroll Cost Transfer?
Processing Lab 1 – Loading the data into Vista Bryce Hutchinson Objectives: 1.to make sure everyone has an valid user ID in the CIF lab 2.To make sure.
Hi, Learning Skills Students! This is Slide 1 of your Power Point Instruction for this class. After reading each slide, make sure you: 1.Follow the instructions.
RIGHT Mouse Button Formatting Cut Copy Paste Save LEFT Mouse Button MAIN BUTTON Single clicks Double clicks Drag Highlight.
WS09-1 VND101, Workshop 09 MSC.visualNastran 4D Exercise Workbook Belted Cylinder.
GISMO/GEBndPlan Overview Geographic Information System Mapping Object.
Velocity Picking Bryce Hutchinson Sumit Verma Objectives : 1. Be able to understand semblance, supergather, CVS 2. Recognize under corrected, over corrected,
Processing Lab 2 – Geometry Bryce Hutchinson Objectives: Add a dictionary Gain a better understanding of header issues Display geometry correctly Visualize.
 To begin you first need to sign up to Weebly by going to or alternatively and we will create an account.
Refraction Statics Bryce Hutchinson Sumit Verma. 3D Statics display 1. Click this button on the right side of the statics window to open a 3D statics.
Course 5: Building 2D Stratigraphic Modeling Relationships.
Entering Your Traverse Data In MineSight ©Feb 2009 Dr. B. C. Paul Note – the following presentation includes screen shots an operating suggestions for.
Learning PowerPoint Presenting your ideas as a slide show… …on the computer!
Getting Started with Word & Saving Guided Lesson.
Overview Lesson 1 Miami Beach Senior High School Academy of Information Technology 1.
PowerPoint: Animation Randy Graff HSC IT Center Training
JDS5 Training Guide. On Start Up you will see this screen click the OK button Click OK.
Introduction to Drafting and Design In order to begin our drawing we have to set the drawing limits or the paper size.
 Columns  Rows  Cells  Ranges  Cell addresses  Column headers  Row headers  Formulas  Spreadsheet.
Bryce Hutchinson & Sumit Verma
To view this in “presentation” mode, go to Slide Show  View Show (the toolbar at the top of the page) Use the “Enter” key to advance to the next slide.
Photoshop Actions Lights, Camera, Actions in Photoshop.
Data QC and filtering Bryce HutchinsonSumit Verma Objective: Consider the frequency range of different seismic features Look for low frequency and high.
Microsoft Excel ( XP-2003). Return to Table of Contents Table of Contents 1_ Introduction to ExcelIntroduction to Excel 2_ Overview of the Excel.
Access Module Implementing a Database with Microsoft Access A Great Module on Your CD.
You’ll Make a spreadsheet which will be like a Mad Libs Game. These Are The Directions.
How to Create a Power Point Presentation. Topics that will be covered: 1) Getting Started 2) Common Features 3) Working with Text 4) Working with Graphics.
Levitra 20 mg Getting started with Firefox New to Firefox? Well you’ve come to the right place. This article covers all the basics and will get you up.
Getting Started with Microsoft Word
Microsoft Excel.
Excel 2010 Screen Symbols.
Microsoft Excel All editions of Microsoft office.
Presentation transcript:

Processing Lab 3 – Header issues and trace editing Bryce Hutchinson Objectives: Fixing elevation issues Define an LMO function Pick first breaks Kill traces Construct a flow Create a notch filter

Reopening your project First of all, if you are on a different computer than last week, you will likely have to fix the licensing issue again. You will know if this is a problem if Vista says DEMO at the top. If it does not say DEMO, move on to the next slide! 1. Click license, then from the drop down menu choose “Options Soft/Hard Key” 2. A window opens up displaying some licensing options. Check the box that says “RLM Reprise Soft Key”. Click OK.

Elevation 1. Let’s go back to the Geometry window, by clicking the geometry icon. As you’ve heard numerous times, geometry is critical to good seismic processing. 2. Press Load to load the geometry from the headers that we created in the last lab. 3. Click OK

Elevation 1. Right click in the geometry window then click display bins to turn off the bin display. 2. Click the calculator button on the left side of the window. 3. In the Calculation window that appears, check Fold File and Offset File. Click OK 4. Right click in the window, under Display Mode select Shot/Recv Elevations. If you want to you can click receiver elevations instead. The displays do not vary much.

Elevation 1. Now you’re looking at a color fill display showing the elevation of each shot. Notice the color bar ranges from 0-99ft. So does it make sense for there to be areas of 0 elevation surrounded by areas of 99ft of elevation? Or to have such a steep dropoff at the Northwest portion of the dataset? No! We’ve got another issue to fix! Alright!

Elevation 1. Exit out of the geometry window. Click Discard. 2. Click the Header icon next to your input dataset. This will bring up the Header View/Edit window, where we can view values from the data in a spreadsheet format. If there are any columns displayed initially in the Seismic Header View/Edit window we need to remove them. 3. Right Click on the header title 4. Click Remove ALL Columns

Elevation Let’s add some columns now to evaluate the elevation. 1. Click the drop down window. 2. Scroll down until you find ELEV_SHOT. Click this input 3. Click the green plus sign to add ELEV_SHOT to the display. 4. Repeat this step for ELEV_REC Scroll through the elevations some and you will see that the majority of values range from ft. However, some are single digits. Seems fishy to me. 5. Click the Header Function Icon and a new set of icons appears along the left side of the window. 6. Click the Define Header Mapping for Header Transfer icon and a new window opens.

Elevation Add ELEV_SHOT and ELEV_REC to this window in a similar way to the previous 1. Choose the input from the dropdown list. 2. Click the green plus sign to add the data to the Header list. 3. Click the white box between Header Name and Comments in the Elev_Rec 4. Click Condition 5. Change the parameter to ELEV_REC 6. Set the Condition to Less Than 7. Set the Value to Click OK 20

Elevation 1. Click Constant 2. Enter 100 into Constant Value 3. Click Add Constant 4. Click OK 5. Click the white box between Header Name and Comments 6. Repeat the process from the previous slide to adjust ELEV_SHOT. 1. Click the floppy disk icon to save your Header mapping to a file. Name it something like Elevation 2. Exit the window – if you are prompted to save one more time, then save.

Elevation 1. Click Apply Scroll through the data now and you’ll see that all of the values now fall into a more reasonable range. Return to the geometry window to view the results. 2. In the geometry window, turn on the color display just as you did before, by right clicking in the window and under Display Mode click Shot/Recv Elevations

Killing Traces Exit out of the geometry window to return to the Project Data List window. 1. Click the icon with three wiggles on it to display the seismic traces. Right away, you can see a few bad traces. There could have been an issue with the geophone recording the trace. Initially the data has no sort order. Let’s sort the data by shot. 2. Click the sort order icon 3. Click shot order

Killing Traces 1. Click the Pick Data Trace Kills icon and a new list of icons appears. 2. In the Kill Trace toolbar, click the Pick Data Trace Kills icon 3. Click and drag in the rows displaying shot and channel number just above the traces to zoom in on traces. I have highlighted this area in red to help you see what I’m talking about.

Killing Traces 1. Once you are zoomed in, simply click the traces to kill them. A red line is now displayed instead of the traces you killed. 2. Zoom out by double clicking in the shot and channel row. I have highlighted this area in red to help you see what I’m talking about. Note: you do not have to be zoomed in to kill traces. We’ve just found it is easier to select individual traces when you are zoomed in. Note 2: If you kill a trace on accident just click the area where the trace was again to restore it.

Killing Traces – Sorting 1. By clicking the offset sort icon you can change between viewing the Traces in sequence or as offset from the source. 2. Scroll through all of the shots and kill all the bad traces you see. 3. When you are done, click the floppy disk and save all your picks to a kill trace file.

Killing Traces It is important for you to understand what a bad trace looks like, and to get somewhat of a feel for how long the process takes. However, for the sake of consistency in processing this data set as a group we will upload a kill file that I have previously created. 1. Click the open file icon. 2. Select the.kil file you were given and click open 3. Save the kill picks to the Headers.

Defining LMO Function 1. Click the Linear Moveout (LMO) Velocity edit icon 2. A new toolbar appears, Click the linear moveout velocity edit icon 3. Click to define the line of the LMO function, double click to end. You are picking along the first breaks. In this slide, you can see about where I picked my LMO Function in green.

Defining LMO Function 2. Click the Floppy Disk icon in the LMO Pick Toolbar, and save your LMO function. 3. Click Save 4. Click the M icon to return to the main seismic toolbar. When you are happy with your choice, save it. 1. You can click the icon to display the linear moveout (LMO) function you have defined.

First Break Picking 1. Click the First Break Picking icon on the top of the seismic data screen. Clicking the First Break Icon opens up a new set of icons from which to choose. Also, the display automatically changes to a shot offset sort. However, the data will already appear this way since we were just defining an LMO.

First Break Picking 1. Click the Auto pick current record icon. First break picks are display based upon the LMO function we just defined. The auto picks are now displayed on the seismic traces, but they’re black so you can’t really see them. Let’s change the color. 2. Click the on the First break pick toolbar. 3. Go to the Display tab. 4. Pick a bright color that displays well. 5. Click OK Your first break picks will now be much easier to see.

First Break Picking 1. If the picks look good on this shot record, then click the icon and autopick all the traces. 2. This will take a few minutes to load, but once it does you can scroll through shot records at the top right to check the fit.

Constructing a flow Note: Flows are integral to processing in Vista, and have many differences. Here we will construct a simple flow to crop the data. 1. Under Job Flow, select New Flow File 2. Return to the Job Flow menu, this time select Vista Flow Command Window The Flow Command window provides a visualization list of all the options you have when creating a flow. You can drag and icon from the Flow Command Window to the Flow File Window in order to set up the flow.

Constructing a flow The majority of flows need an input and an output. 1. Click and drag an Input and an Output icon to the flow window. 2. Double click the input icon and set it [1] d_sg_stratton3d. Click OK 3. Right Click the input icon and click Data/Header SELECTIONS

Constructing a flow 1. Click the Bin spreadsheet display icon to view data from a set of bins. 2. Click the green plus icon then enter the data as it appears in screenshot. 3. Click OK 4. Back in the flow file window, double click the output icon and change the name to something like crop1. Click OK 5. Click the flow link command icon. Then click and drag from the input icon to the output icon to link these commands.

Constructing a flow 1. Right click in the flow file window and select Set All Execute ON 2. The indicators on each icon will now be green. Click GO to run the flow. 3. The resulting traces look kind of ugly at first, but trying sorting them by different bin orders and you will see a better looking image!

Creating a 60Hz notch filter 1. Open a new flow file just as you did earlier. 2. Open the Vista Flow Command Window too if it is not already open. 3. Drag and drop Input, AdjNotch, and Output to the flow command window. 8. Right click in the window and Set all to execute ON 9. Click GO 7. Draw arrows to connect the flows using the flow link icon 5. Double click the notch filter to change the parameters. 4. Set the original data file as the input 6. Name the output file 60Hz Notch Note: 60Hz noise is commonly seen in seismic data. Why is this? It just so happens that power lines produce a signal at 60Hz. Note: IF it appears the process is going to take a while to run, you can use your cropped data as the input to speed things up.

Notch comparison Left: A comparison of the original seismic data and 60Hz noise removed. Right: A comparison of the CMP cropped data and 60Hz noise removed. That’s all, hope you had a great time!