Page 1 BaBar IFR Mechanical, Schedule Cost Review Outbriefing (1) Excellent job on preparing and presenting review Overall, the Committee feels that the.

Slides:



Advertisements
Similar presentations
Planning & Scheduling Systems: From Design to Fabrication.
Advertisements

Project Management Process. Project Complexity means that: a team of people are needed to supply expertise the work needs to be broken into manageable.
Richard M. Boyce FAC Review – Accelerator Installation October 29-31, Installation – Accelerator Systems Installation Planning.
Mark Reichanadter LCLS FAC April 20-21, 2006 Meeting of the LCLS Facilities Advisory Committee LCLS Project Management M.
Systems Engineering Management
May 4, 2004Bill Wisniewski1 Installation Review. May 4, 2004Bill Wisniewski2 Charge ( W. Althouse, G. Bowden, W. Innes(chair), J.Weisend, (D. Nelson))
October 22, 2003H.J. Krebs1 LST Mechanical Design Review Mechanical Installation Preparation H. James Krebs October 21, 2003.
Development and Quality Plans
Defining the Activities. Documents  Goal Statement defines why helps manage expectations  Statement of Work what gets delivered defines scope  Software.
Project Management and Scheduling
Chapter 9. Intro  What is Project Management?  Project Manager  Project Failures & Successes Managing Projects  PMBOK  SDLC Core Process 1 – Project.
@ Industrial Engineering by Bopaya Bidanda David I. Cleland.
13. The Stewardship Advisory. It is a quarterly event in which the Stewardship and Finance Committee and the Visitation Committees of all the district.
Managing a Training Program Why train? Who will attend the training? What are the learning objectives? Strategies? Coverage? How will the training program.
Server Virtualization: Navy Network Operations Centers
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Staffing and Training.
From Research Prototype to Production
After Lesson 6 next is Lesson 13 to fit topic on Software Development SOFTWARE PROJECT MANAGEMENT.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
1 Project Management Introduction. 2 Chap 1 What is the impact? 1994: 16% of IT projects completed “On-Time” 2004 : 29% of IT projects “On- Time” 53%
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
OFFICE OF SCIENCE 1 3. Cost Estimate Gines, Fisher 2.Are the estimated cost and proposed schedule ranges realistic, consistent with the technical and budgetary.
Effective Project Management: Traditional, Agile, Extreme Presented by (facilitator name) Managing Complexity in the Face of Uncertainty Ch08: How to Close.
Project monitoring and Control
Chapter 11. Intro  What is Project Management?  Project Manager  Project Failures & Successes Managing Projects  PMBOK  SDLC Core Process 1 – Project.
Project Life Cycle.
BSBPMG501A Manage Project Integrative Processes 4.4 Monitor and Control Project Work The process of tracking, reviewing and regulating the progress made.
Managing CMMI® as a Project
Robotics & Engineering Design Projective Management Chin-Sung Lin Eleanor Roosevelt High School.
OFFICE OF SCIENCE 2.3 Infrastructure and Installation Sims, Edwards 1.Does the conceptual design and planned implementation satisfy the performance specifications.
LST SAFETY INSTALLATION READINESS REVIEW 5/5/2004 FRANK O’NEILL (SLAC)
3 1 Project Success Factors u Project management important for success of system development project u 2000 Standish Group Study l Only 28% of system development.
Atlas CAP Closeout Thanks to all the presenters for excellent and frank presentations Thanks to all the presenters for excellent and frank presentations.
Page 1 May 10, 2011 IT for the 12 GeV Era 2011 Review Review Closing Summary.
November 15, 2003Bill Wisniewski1 Introduction Brief Status of LST project QA Review Mechanical, Schedule and Cost Review.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
Critical Design Review (CDR)
1 US Cost & Schedule Summary W. R. Edwards US Project Manager CD-2/3a Review January 8, 2008 BNL.
Ergonomics Risk Management: Strategies and Interventions at Workplace Level Back to Basics Conference June 13 th 2014 Frank Power Inspector (Projects Manager)
Continual Service Improvement Methods & Techniques.
1 MICE CM27 Engineering integration Andy Nichols, STFC 9 th July, 2010.
Switch off your Mobiles Phones or Change Profile to Silent Mode.
IT-301 Project Management I: Unit 4: Cost Management.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
PRIIA 305 Technical Subcommittee Systems Engineering Processes for Passenger Equipment Acquisition and Life Cycle Support Presented at: NGEC Executive.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Project Management The much neglected art of running a project to a successful completion 15/07/2016(C) Management Expert Academy1.
Director’s Progress Review Closeout Meeting
Accelerator Readiness Review October 31, 2006
Project Management The Roles and Responsibilities of a Project Manager
Fundamentals of Information Systems, Sixth Edition
Introduction BaBar Components The Problem IFR Upgrade: 2004 & 2005
Systems Analysis and Design in a Changing World, 4th Edition
Activity Planning.
LCLS Linac Technical Design Review Charge
Defining the Activities
BSA 376 Competitive Success/snaptutorial.com
BSA 376 Education for Service/snaptutorial.com
HCIS 410 PAPER Lessons in Excellence - - hcis410paper.com.
BSA 376 Teaching Effectively-- snaptutorial.com
BaBar IFR Upgrade Mark Convery SLAC 7 Jun 06.
Director’s Progress Review Closeout Meeting
IS&T Project Reviews September 9, 2004.
MENTORING PROGRAM ICON QLD | 2018 APPLICATION PACK
Limited Streamer Tube Project Summary
VIDEO REMOTE INTERPRETING
Preliminary Project Execution Plan
NGEC Executive Board Meeting
Presentation transcript:

Page 1 BaBar IFR Mechanical, Schedule Cost Review Outbriefing (1) Excellent job on preparing and presenting review Overall, the Committee feels that the project is on track and there are no technical show-stoppers Risks for 2004 installation are resolved Some risks for 2005 installation remain, but there is adequate time to resolve them and to incorporate lessons from 2004

Page 2 BaBar IFR Mechanical, Schedule Cost Review Outbriefing (2) Adequacy of engineering studies? —Overall, the engineering studies are at an appropriate state of development, and are moving in the right direction Status of the design of tooling, platforms, and LSTs? —The design of the tooling and platforms appears to be in very good shape for this stage of the project. The mechanical design of the LSTs is mature and sound Integration of gas, cables, HV systems? —Good drawings of proposed routings exist, but integration of those routings with other detector systems appears risky. Safety considerations? —Safety attention so far has been good. More formal safety planning is required in the immediate future, to ensure that adequate resources and training will be available when the shutdown begins —Small work areas, multiple shifts, aggressive schedule, increase risk of accident »Continuous presence of safety officers on all three shifts is required »Safety staffing must consider overload

Page 3 BaBar IFR Mechanical, Schedule Cost Review Outbriefing (3) Installation plan? —Installation planning is extremely well-done, detailed, complete —Very success-oriented! No float! Risky! —2004 schedule of 2.5 months, is extremely optimistic —Risks and choices (e.g., number of sextants vs. schedule duration, frequency/impact of tours) should be discussed with SLAC management, so that management is aware and can participate in tradeoffs —Good effort in identifying risk-mitigation approaches. Continue looking for such opportunities »Prototyping/mockups of equipment and procedures =Consider mockup of full z and full x together WBS and costs? —Very well-developed and detailed WBS and cost estimate —Costs seem appropriate —Top-level budget summary is not clear to us

Page 4 BaBar IFR Mechanical, Schedule Cost Review Outbriefing (4) Other Recommendations —Project leaders should place more emphasis on technical and programmatic coordination across the entire (LST + installation) project »System managers should take full ownership of the project »One schedule, including all activities, is needed »Must be mindful of the need for coordination of LST systems with other detector systems »Integration of testing and QC into the project »Continue coordination with the rest of SLAC on downtime activities. Start assembling complete downtime task list soon —Review cable tray loading with relevant SLAC experts (P. Anthony)

Page 5 BaBar IFR Mechanical, Schedule Cost Review Outbriefing (5) Other Recommendations —RPC removal technique appears risky, and would benefit from more consideration, with an eye toward more determinism —Design concept for the temporary EMC support is a good start. It is very important to work out the procedural details and then perform a stepwise mechanical analysis of each intermediate state to confirm that the load can be transferred in a deterministic and controlled manner without risking any of the detector hardware. —Encourage photo-documentation during both installations —Consider holding Production Readiness Review for LST manufacturing