SESAME STORAGE RING RF-SYSTEM SESAME-TAC meeting Nov.2012 SESAME SR RF System – Darweesh FOUDEH.

Slides:



Advertisements
Similar presentations
Status and Future of BESSY RF BESSY II operating since 1999 Willy Wien Laboratory groundbreaking 9/2004 HoBiCaT Testfacility for sc cavities Commissioning.
Advertisements

EMMA RF System Summary RF Requirements (S Berg): Aperture: –Aperture 34.7 mm (min) –Dispersion effects may increase by 3 – 4 mm Frequency: –Frequency range.
SESAME Storage Ring RF-System
13 th ESLS RF meeting, DESY, 30/09 – 01/10/2009J. Jacob: Status of the RF Upgrade at the ESRF1 13 th ESLS RF Meeting 2009 DESY, 30 th September – 1 st.
X-ray Booster IR Linac Harmonic RF RF Systems for NSLS-II J. Rose, A. Blednykh, N. Towne With help from many others at BNL and other institutions.
SESAME SESAME RF SYSTEM Arash Kaftoosian.
Potential improvements of the PS 10 MHz cavities driving amplifier G. Favia Acknowledgments: V. Desquiens, F. Di Lorenzo S. Energico, M. Morvillo, C.
Beam loading compensation 300Hz positron generation (Hardware Upgrade ??? Due to present Budget problem) LCWS2013 at Tokyo Uni., Nov KEK, Junji.
ANNEX. WP 1.04, Michael Ebert2MAC PETRA-III Review Meeting, DESY,29th November 2006 Sandblasted Center Conductor of a Cavity Input Coupler R a =
RF Distribution Alternatives R.A.Yogi & FREIA group Uppsala University.
Preliminary design of SPPC RF system Jianping DAI 2015/09/11 The CEPC-SppC Study Group Meeting, Sept. 11~12, IHEP.
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
Anders Sunesson RF Group ESS Accelerator Division
CWRF 2012 – High Power RF - May 7 th -11 th Brookhaven National Laboratory - USA 1 Status of the RF Activity at ESRF G.Gautier J.Jacob M.Langlois V.Serrière.
Cavities Auto Recovery with Beam RF&Linac Section - ALBA Accelerators Division Francis Perez Angela Salom.
Digital Phase Control System for SSRF LINAC C.X. Yin, D.K. Liu, L.Y. Yu SINAP, China
Solid State RF High Power Amplifier Developments at SOLEIL Ti RUAN, on behalf of SOLEIL RF Group CWRF10 CELLS-ALBA Barcelona Spain May
STATUS OF THE SOLEIL RF SYSTEM
Jørgen S. Nielsen Institute for Storage Ring Facilities (ISA) Aarhus University Denmark 1 ESLS-RF 14 (29-30/9 2010), ASTRID and ASTRID2 new LLRF.
February 2010 ALBA Synchrotron Light Source Francis Perez.
Renovation of the 200 MHz RF system LLRF issues. Cavities redistribution 26 October th LIU-SPS Coordination Meeting 2  2011 : 4 cavities 2 x 4.
14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez.
1Matthias LiepeAugust 2, 2007 Future Options Matthias Liepe.
R.SREEDHARAN  SOLEIL main parameters  Booster and storage ring low level RF system  New digital Booster LLRF system under development  Digital LLRF.
704 MHz warm cavity November 4, 2015 A.Zaltsman: SRF & warm RF components for LEReC1  A single cell 704 MHz warm cavity is used to correct the beam energy.
RF 1/33 ALBA RF system why, how and other questions Francis Perez.
Other Utilities of ALBA LLRF
CWRF 2008, Geneva, March Alessandro Fabris on behalf of the Elettra RF Group Sincrotrone Trieste, Trieste, Italy. Elettra RF System Upgrade:
J. Jacob: RF Operation, Cav's and SSA's at ESRF
Jan Low Energy 10 Hz Operation in DRFS (Fukuda) (Fukuda) 1 Low Energy 10Hz Operation in DRFS S. Fukuda KEK.
Digital LLRF: ALBA and Max-IV cases RF&Linac Section - ALBA Accelerators Division Angela Salom.
Managed by UT-Battelle for the Department of Energy Vector Control Algorithm for Efficient Fan-out RF Power Distribution Yoon W. Kang SNS/ORNL Fifth CW.
CW and High Average Power Workshop BNL The Diamond Storage Ring IOT based High Power Amplifier Morten Jensen on behalf of the SR RF Group.
Stefan Wilke, DESY MHF-e 1 12th ESLS RF Meeting 1 st October, 2008 at DIAMOND Overview and Status of Assembling and Commissioning the RF-System at PETRA.
BARC-IIFC collaboration meet RF Solid-state Power Amplifiers at 325 MHz RFSS, TPD, BARC.
650 MHz Solid State RF Power development at RRCAT
ALBA RF System Paco Sanchez - 13th ESLS RF - DESY, 30 September Paco Sanchez, RF Group, CELLS (Consortium for the Exploitation of the Synchrotron.
ALBA RF Systems Francis Perez.
TIARA Workshop on RF Power Generation Uppsala, June 2013
LFB, LLRF, TFB Alessandro Drago Annecy, March 2010.
IIFC Meeting February 24-25, 2015, RRCAT P. R. Hannurkar, Akhilesh Jain, M. R. Lad RF Systems Division 650 MHz RF Power 1.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
Linac RF System Design Options Y. Kang RAD/SNS/NScD/ORNL Project – X Collaboration Meeting April , 2011.
K. TAVAKOLI Upgrade of the superconducting RF cavities at soleil K. Tavakoli SOLEIL Synchrotron, France.
High Power RF Systems for 2-8 GeV Fast Cycling Synchrotron PROJECT X (ICD-2) John Reid September 11, 2009.
A CW Linac scheme for CLIC drive beam acceleration. Hao Zha, Alexej Grudiev 07/06/2016.
Operation Status of the RF Systems and Taiwan Photon Source
Status of the ELETTRA RF Plants
Report Technical Director Storage-Ring-Installation Completed
Areal RF Station A. Vardanyan
Report Technical Director Storage-Ring-Installation Completed
PETRA III at DESY Hamburg/Germany
Solid State Amplifier Development at PSI
Status of High Power Solid State Amplifiers
SOLEIL EXPERIENCE WITH HIGH POWER SOLID STATE AMPLIFIERS
Developments of High CW RF Power Solid State Amplifiers at SOLEIL
Cavity-beam interaction and Longitudinal beam dynamics for CEPC DR&APDR 宫殿君
An overview the ASTRID2 storage ring and its RF system
Machine Operation and Progresses in SSRF
CEPC RF Power Sources System
Status of RF at HZB: BESSY II, MLS, bERLinPro and BESSY VSR
Status and New Developments of ALBA RF Systems
Status of the ASTRID2 RF systems
Passive harmonic cavities for bunch shortening
Status and New Developments of ALBA RF Systems
CEPC SRF Parameters (100 km Main Ring)
Parameters Changed in New MEIC Design
RF Parameters for New 2.2 km MEIC Design
SOLEIL Long Term SSPA Operational Experience
RF Parameters for New 2.2 km MEIC Design
Presentation transcript:

SESAME STORAGE RING RF-SYSTEM SESAME-TAC meeting Nov.2012 SESAME SR RF System – Darweesh FOUDEH

SESAME SR MAIN PARAMETERS ParameterValue Energy2.5 GeV Circumference m RF frequency MHz Radiation loss/turn605 KeV Beam current (maximum)400 mA Beam power loss (bare machine) 242 kW Harmonic number222 Momentum compaction factor Total RF voltage (maximum)2.4 MV Over voltage factor4 Number of cavities4 Energy acceptance1.45 % Synchrotron frequency37 KHz Synchronous phase165.5 º SESAME-TAC meeting Nov.2012 SESAME SR RF System – Darweesh FOUDEH

ParameterBoosterStorage ring RF frequency MHz Harmonic number64222 Circumference38.4 m m Revolution freq MHz2.25 MHz RF wavelength0.600 m Coincidence freq KHz SESAME RF Layout and Main Parameters SESAME-TAC meeting Nov.2012 SESAME SR RF System – Darweesh FOUDEH

SESAME SR RF SYSTEM GENERAL LAYOUT  So far, the above analog LLRF has been suggested for the Storage Ring  As a strong alternative, adopting a digital LLRF for the Storage Ring RF system is being studied.  A proposal for establishing a collaboration between ALAB & SESAME to build the SESAME DLLRF SESAME-TAC meeting Nov.2012 SESAME SR RF System – Darweesh FOUDEH

Main Oscillator 500 MHz Local Oscillator 20 MHz ADC FPGA DSP/PID DAC IQ modulator Amp 520 MHz 500 MHz (Cavity Signal) IF 20 MHz Digital Clock (80 MHz) I´I´ Q´Q´ Cavity Cavity Tuning Stepper Motor 500 MHz (Forward Signal) 500 MHz 520 MHz Digital IQ Demodulation Proposed Digital LLRF System SESAME-TAC meeting Nov.2012 SESAME SR RF System – Darweesh FOUDEH

 Advantages Flexible and Reconfigurable via Software. Many sophisticated algorithms can be implemented via software. Remotely controlled and multi-user operation. DLLRF has built-in diagnostics, low down-time (MTBF), and high resolution is achievable.  Disadvantages  Long group delay.  More sensitive to radiation.  Needs good programming skills to develop software programs. Digital LLRF SESAME-TAC meeting Nov.2012 SESAME SR RF System – Darweesh FOUDEH

SESAME SR RF Power Amplifier  SESAME has adapted the SSA technology instead of vacuum tubes due to: absence of high biasing voltages. longer life times. stable gain with aging. easier and quicker maintenance and no machine interruption. possibility of reduced power operation in case of failure.  SOLEIL design for 500MHz module had been adapted as the main block for building the amplifier tower based on the LDMOS BLF578XR transistors from NXP Semiconductors.  The –XR version showed lower performance compared to prior one, so it was dumped and will not be used to drive the RF module. BLF578XR BW MHz PLPL 225MHz P.Oper & P L 1200W; 1400 Gain D%D% :124dB : SESAME-TAC meeting Nov.2012 SESAME SR RF System – Darweesh FOUDEH

SESAME SSA main block showing: Power transistor with the surrounding circuit. 2KW circulator on the output with ( ) MHz BW. 350W dummy load. SESAME-TAC meeting Nov.2012 SESAME SR RF System – Darweesh FOUDEH

SESAME SSA main module tests. Two colleagues from the RF group had visited SOLEIL to do all required tests. Phase1 tests were based on testing each module by itself, two groups of the module were identified, one is using the BLF578 x 8 and the other is using BLF578XR x 6. Phase2 tests were made for the whole group test as one amplifier. Phase3 tests were made by combining the two groups. The desired output level for each module was for both groups. BLF578 Module Dissipated Power W S 11 dB Gain dB %%  % Phase Shift  BLF578XR Module Dissipated Power W S 11 dB Gain dB %%  % Phase Shift  SESAME-TAC meeting Nov.2012 SESAME SR RF System – Darweesh FOUDEH

Gain vs. Pout for each module BLF578: 16.3 dB. BLF578XR: 15.4 dB. SESAME-TAC meeting Nov.2012 SESAME SR RF System – Darweesh FOUDEH

Efficiency vs. Pout BLF578: 63%. BLF578XR: 55%. SESAME-TAC meeting Nov.2012 SESAME SR RF System – Darweesh FOUDEH

Module BLF578#1 gain tests with respect to V DS voltage SESAME-TAC meeting Nov.2012 SESAME SR RF System – Darweesh FOUDEH

Module BLF578#1 efficiency tests with respect to V DS voltage SESAME-TAC meeting Nov.2012 SESAME SR RF System – Darweesh FOUDEH

Gain & Efficiency vs. combined power of the BLF578 modules SESAME-TAC meeting Nov.2012 SESAME SR RF System – Darweesh FOUDEH

G & η vs. output power : combined output power of 6LF BLF578XR SESAME-TAC meeting Nov.2012 SESAME SR RF System – Darweesh FOUDEH

SESAME-TAC meeting Nov.2012 SESAME SR RF System – Darweesh FOUDEH Module Degradation Test Two groups of 8-Modules each were prepared. First group was tested with 650W to give a total output of 5.2KW for 1000h. Second group was tested with 725W to give a total output of 5.8KW for 1000h. The results of tests showed stable performance after 1000h. After the 1000h test is finished each module will be tested individually to check all its parameters in details.

DC-DC converter 300V–to- 50V RF Module RF tower power supply implemented in SOLEIL RF tower power supply will be implemented in SESAME; 220ACV-to-50VDC/2KW. SESAME-TAC meeting Nov.2012 SESAME SR RF System – Darweesh FOUDEH

4.8KW 24W 0.6W 600W 120W 3W 38.4KW KW 600W 120W3W 24W 0.6W 38.4KW 2-Way Combiner 76.8KW SESAME 75KW tower Solid State Amplifier architecture All RF modules have 16dB output. SESAME-TAC meeting Nov.2012 SESAME SR RF System – Darweesh FOUDEH

SESAME RF PLANT LAYOUT SESAME-TAC meeting Nov.2012 SESAME SR RF System – Darweesh FOUDEH

SOLEIL Storage Ring RF Solid State Amplifiers (SSA) SESAME-TAC meeting Nov.2012 SESAME SR RF System – Darweesh FOUDEH

SESAME-SOLEIL Collaboration Two RF cavities had been received by SOLEIL from Elettra by the end of May2012. One of them has the HOM shifter while the other doesn’t. By visual inspection the cavities look in good shape but its cooling pipes need re-welding. Max. RF power through its input coupler is 60KW. Testing RF plant will be built consist of: 1.RF Cavity. 2.75KW amplifier. 3.Waveguides. 4.Cooling rack for cavity. 5.Shielding room for cavity operation. SESAME-TAC meeting Nov.2012 SESAME SR RF System – Darweesh FOUDEH

Due to input coupler power limitations the two Elettra cavity will be used mainly for the phase1 commissioning of the SR. Max. stored current will be around 25mA. To operate the SR at 2.5GeV/400mA with extra 100KeV due to ID’s and 4 OVF would require each cavity to be able to handle 150KW. Other options are under investigation, i.e.:  EU cavity.  PEP2 cavity.  KEK damped cavity.  Elettra cavity with the new I/P coupler design. SESAME-TAC meeting Nov.2012 SESAME SR RF System – Darweesh FOUDEH SR Power Requirements

SESAME SR RF Cavities T w ± 0.1°C Power coupler  L cav Plung er Phase1: 2Elettra cavities with 60KW.max I/P Coupler Phase2: Chosen cavities should be capable to compensate the energy losses of about SESAME-TAC meeting Nov.2012 SESAME SR RF System – Darweesh FOUDEH

SESAME-TAC meeting Nov.2012 SESAME SR RF System – Darweesh FOUDEH KEK damped cavity used in the PF-ring.

Local Control Unit (LCU) Donated by Soleil From BESSY I Purchased by EU fund donation Ready System: SESAME Booster RF Plant and Local Control SESAME-TAC meeting Nov.2012 SESAME SR RF System – Darweesh FOUDEH

The new 2kW Solid-State amplifier as replacement for the old klystron used in BESSY I Booster LLRF (from BESSY I) tested in the RF lab Booster 2KW RF Cavity (BESSY1) SESAME Booster RF Plant SESAME-TAC meeting Nov.2012 SESAME SR RF System – Darweesh FOUDEH

Thank You SESAME-TAC meeting Nov.2012 SESAME SR RF System – Darweesh FOUDEH