Run II PMG 2/16/06 Martens/Sims 1 Run II Upgrades Status February 2006.

Slides:



Advertisements
Similar presentations
AP-0 Target Hall Experience Fermilab Anti-Proton Source P. Hurh ( ) Mechanical Support Dept. Fermilab Anti-Proton Source P. Hurh ( ) Mechanical.
Advertisements

1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Run 2 PMG 2/16/06 - McGinnis Run II PMG Stacking Rapid Response Team Report Dave McGinnis February 16, 2006.
Run II Status and Prospects - Spalding1 Run II Status and Prospects Jeff Spalding Fermilab June 14, 2004.
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on.
Tevatron BPM Upgrade Project Manager Overview Stephen Wolbers Tev BPM Technology Choice Review December 16, 2003.
F UEC - 6 Oct 06 Recent FNAL Collider Operations Ron Moore Fermilab – Tevatron Dept.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
SNuMI 1 Outline Action Items PP2 Progress [Nancy/Elaine] –Org Chart Update –FY07 Budget/Plans Discussion –FY08 Summer Shutdown –Overall cost Reduction.
Muon Campus Projects Jerry Annala Jan 23, µ AIP Scope Recycler RF system to provide needed bunch structure to future Muon Experiments Recycler RF.
Beam Transport AIP Beam Transport to Delivery Ring Instrumentation and Controls Update Brian Drendel December 15, 2014.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
Director’s Review 5/5/03 Spalding1 The Run II Upgrade Program Director’s Review May 2003 Program of upgrade projects in MI-Accumulator-Tevatron and the.
Recycler Status and Plans Shekhar Mishra MID/Beams Division Fermilab AAC Review 2/4/03 Introduction to the Recycler Ring Recycler Improvements and status.
F Antiproton Source Apertures Steve Werkema DOE Tevatron Operations Review March 22, 2006.
PIP Update Jan Agenda Summary Update – Current Activities – Updates (Ken, Pat and John) – Additional Meetings/Notes.
October 4-5, Status of ARRA funded AIPs Electron Lens Scope, Cost, and Schedule Wolfram Fischer October 4, 2010 Electron Lens.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
Ff NO A Accelerator Upgrades: Status Phil Adamson Fermilab
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Run II Operational Status and Plans Run II Meeting October 28, 2004 Dave McGinnis.
Director’s Review 5/5/03 Spalding DRAFT RLS 1 Project Planning  Documentation to DOE June 1  DOE Review ~July 22 Documents Summary Project Overview,
All Experimenters' Mtg - Aug. 04, 2003 Week in Review: 07/28/03 –08/03/03 Doug Moehs – FNAL Stores and Operations Summary Standard Plots.
S. Pordes - to part of CD 09/10/031 Introduction to some Beams Division jargon in some order…see how far we get:
ECOOL Meeting 03/26/10 1 Low-E cooler baseline decisions: 1.FNAL’s cooling section “as is” – with weak solenoids, correctors, etc. (to prevent over focusing.
AP2 Line & Debuncher Studies Status Keith Gollwitzer Antiproton Source January 9, 2006 Many people involved with providing the hardware and software that.
Proton Plan PMG 7/7/05 E Prebys 1 Proton Plan Status June Report Eric Prebys.
Tevatron BPM Upgrade Stephen Wolbers CD Accelerator Coordination Meeting August 3, 2004.
Proton Plan PMG 9/27/07 E Prebys 1 Proton Plan Status Eric Prebys.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
Tevatron BPM Upgrade Stephen Wolbers CD Accelerator Coordination Meeting September 21, 2004.
PIP Update June 17 th Agenda Summary Update – Current Activities – Updates (Alexander Valishev - Simplified Modeling of Space Charge Losses in Booster.
Recent Work Towards Increasing the AP2 & Debuncher Aperture – Keith Gollwitzer – May 9, Recent Work Towards Increasing the AP2 & Debuncher Aperture.
Fermilab Run 2 Accelerator Status and Upgrades
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Proton Plan PMG 2/23/06 E Prebys 1 Proton Plan Status January Report Eric Prebys.
SNuMI 1 Outline Action Items PP2 Progress [Nancy/Elaine] –Org Chart Update –FY07 Budget/Plans Discussion –FY08 Summer Shutdown –Overall cost Reduction.
Run II PMG 1/19/06 Pushpa Bhat 1 Run II Upgrades Status January 2006 Pushpa Bhat.
Main Injector Beam Position Monitor Upgrade: Status and Plans Rob Kutschke All Experimenters’ Meeting April 3, 2006 Beams-doc-2217-v3.
Status of the AP2 Optics Keith Gollwitzer Antiproton Source Department November 19, 2004.
Planning/Budget Stephen Wolbers CD All Hands Meeting May 7, 2004.
9/2/2003Tev BPM requirements1 Tevatron BPM and BLM requirements Mike Martens.
Proton Plan PMG 2/22/07 E Prebys 1 Proton Plan Status January Eric Prebys.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
Proton Plan Director’s Review 8/15/06 Prebys Proton Plan Summary Director’s Review August 2006 Eric Prebys.
Proton Planning Eric Prebys FNAL Accelerator Division.
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
Proton Plan PMG 5/25/06 David Harding Booster Correctors Status and CR David Harding.
F Record luminosities at the Tevatron & Future potentiality Steve Werkema Fermi National Accelerator Laboratory Batavia, Illinois USA Asian Particle Accelerator.
F All Experimenters' Mtg - 24 Feb 03 Week in Review: 02/17/03 –02/23/03 Ron Moore – FNAL Store Summary Failed Tev dipole disassembly Schedule for Week.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
F HCP 2007 Performance and Future of the Tevatron Ron Moore Fermilab - Tevatron Dept. Tevatron overview and performance Antiproton source + Recycler overview.
Proton Plan PMG 4/18/05 E Prebys/J. Sims 1 Proton Plan Status March Report Eric Prebys Jeff Sims.
12/16/03Tev BPM requirements1 Tevatron BPM requirements Mike Martens.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
F All Experimenters' Mtg - 6 Jan 03 Week in Review: 12/30/02 –1/05/03 Ron Moore – FNAL Store Summary – Best week! > 7 pb -1 Machine Studies/Maintenance.
PAC Meeting, December 12, Prebys 1 The Problem.
Pbar Production Status & Plans to get to 25mA/hr Keith Gollwitzer Antiproton Source August 31, 2006.
Run II Status Keith Gollwitzer Temple Review July 1, 2003.
Haixin Huang AGS Cold Snake: Status and Plans.
July 29, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Trying to.
Proton Plan PMG 7/27/06 J. Sims 1 Proton Plan Cost and Schedule Report Jeff Sims.
Antiproton Acceptance Steve Werkema DOE Review February 24, 2004.
Antiproton Acceptance Steve Werkema February 8, 2005.
Weekly Pbar Report 10/26 → 11/2. Stacking This Week …
Cons Gattuso 2/23/10 Status/Changes to Pbar Transfer Program.
Pre-Meeting Meeting Brian Drendel Accelerator Shift Plot.
Presentation transcript:

Run II PMG 2/16/06 Martens/Sims 1 Run II Upgrades Status February 2006

Run II PMG 2/16/06 Martens/Sims 2 Outline Technical Progress –Mike Martens  AP2, DB Studies Dave’s talk (Congrats on the stacking record!)  Recycler Record Stash of 436E20 (2/14/06)  Run II Upgrade Status  Run II Upgrade Shutdown Work  Technical Progress  Project De-scoping Status for January ‘06 – Jeff Sims

Run II PMG 2/16/06 Martens/Sims 3 Run II Upgrade Project Status Shift in emphasis for Run II Upgrade Project  Started almost 3 years ago!  Project is 85% complete  Jeff Sims is now the Run II Project Manager  Most projects completed or nearing completion  Some remaining projects maybe not needed; will be de- scoped Stacktail Cooling Upgrades Debuncher Vertical Band 4 Aperture improvements Pbar Target Sweeping  Hope to close the project books by end of FY ’06  … but work on Run II continues Some of the work naturally continues within machine depts De-scoped projects can return if needed

Run II PMG 2/16/06 Martens/Sims 4 Run II Upgrade Shutdown Work  Tevatron Separators Replace 3 separators at A49  Allow for higher voltage Install two new separators  Allow for larger helix  Install TEL-2 at A0  Tevatron Alignment Re-shim the remaining dipoles Unroll quad (with ~10 mrad roll) at D17  Tev Chromatic Compensation Rewire Sextupole circuits Corrects the chromatic beta function error Necessary to run near ½ integer  Rapid Transfers Install Hall probes Repair some beamline BPMS with noisy channels  Install New Pbar Target  Main Injector BPMs  MI and Tev BLM installation

Run II PMG 2/16/06 Martens/Sims 5 Technical Progress Li Lens  One each of PT-1 and PT-2 lenses will be filled and the PT-2 will be tested on the test stand. PT-2 should be ready for beam in June. Rapid Transfers  Many elements of the upgrade are in place (ramping power supplies, BPMs) providing benefits to operations in various modes  Transfers without reverse proton tune-up tried many times last week with good results

Run II PMG 2/16/06 Martens/Sims 6 MI BPM upgrade  Most of the hardware designed, ordered or delivered  First house installed in MI40 – now commissioning  Full upgrade during and immediately after shutdown BLM upgrades  Prototype system running at MI60 for ~ 3 months, with PC instead of local control card. Control card + software under test  Production to be completed by 4/15, a month of testing followed by installation Technical Progress (Contd.)

Run II PMG 2/16/06 Martens/Sims 7 OTR detectors  Installed in December  See first images Technical Progress (Contd.) Transverse beam profile measurement from the OTR One pass of beam at injection Is tilt from optics? OTR alignment? Some noise introduced by poor termination in tunnel

Run II PMG 2/16/06 Martens/Sims 8 IPM detectors  Some problem with vacuum at full B and E-field  See (very preliminary) first images Technical Progress (Contd.) Transverse beam profile from the IPM Turn-by-Turn profiles

Run II PMG 2/16/06 Martens/Sims 9 Project De-scoping Stacktail Cooling  Design work has been completed  Not needed unless significant gain in stack rate  Will “Mothball” project  Will decide in Summer ’06 if needed. Debuncher Vertical Band 4 Aperture  Design is completed  Not a significant gain in aperture  Eliminates lots of cryo, vacuum, and mechanical work during an already packed shutdown Pbar Target Sweeping  Design and Hardware completed  Will focus on target improvements  If needed, the remaining work is mostly commissioning

Run II PMG 2/16/06 Martens/Sims 10 Status

Run II PMG 2/16/06 Martens/Sims 11 Initial PM Efforts Working with Mike and Subproject Managers to understand the remaining Run II scope.  Deactivating 220 +/- cost accounts  60+/- cost account remain active. We have obtained estimates on all remaining work.  Descoping Stacktail and Band 4 Cooling Tank Upgrade Planning for Run II Closeout  All but three subprojects will be 100% complete by the end of FY06. The remainder are studies and commissioning related tasks and do not benefit from formal project management approach.  Any remaining Run II FY07 effort (M&S or SWF) will be included in the appropriate AD department budgets for FY07 Compiling Responses to 2005 DOE review Recommendations.

Run II PMG 2/16/06 Martens/Sims 12 Remaining Run II Work (1 of 3) PBar and Target Sweeping  Upgrades to Pbar Target – MI Upgrades –  MI BPM System –  MI-8 BPM Upgrades Rapid Response Team – Lithium Lens 1 and 2 – AP2 and Debuncher Acceptance –  AP2 Debuncher Survey and Alignment  Develop New Instrumentation – (goes into FY07)  Redesign/modify/rebuild/relocate elements (may extend into FY07 if there are aperture restrictions)  Orbit Control –  Develop model of AP2 & Debuncher lattice  AP2 & Debuncher Acceptance Beam Studies

Run II PMG 2/16/06 Martens/Sims 13 Run II Remaining Work (2 of 3) Rapid transfers –  RT Software –  Rapid Transfer Oscillation Feedback & Control  Diagnostics – Additional Recycler Upgrades  Upgrade Transverse Dampers for Broadband Additional E-Cool Upgrades TEV Beam Studies & Simulation  TEV Studies and Simulation Work (extends into FY07) TEV Active Beam-Beam Compensation  Tevatron Electron Lens (Tel2 extends into FY07) Increased Helix Separation  New Helical Orbits –  Separator Conditioning & Testing  Install Spare Separators To Smooth Helix

Run II PMG 2/16/06 Martens/Sims 14 Remaining Run II Work (3 of 3) Chromatic Compensation – New Scope Tevatron Alignment–  Tevatron On-line Level System –  Smart Bolts – – TD Only Orbump Magnets – – TD Only Infrastructure Vulnerability – – Recent $220k req for spare 345kv Switchgear BLM System Upgrade– 2.2.4

Run II PMG 2/16/06 Martens/Sims 15 Remaining Milestones Baseline Finish Date Actual Finish Date Forecast Date Scheduled for 2/21/06 Actually 2/27/06 Will have to bump out to early June

Run II PMG 2/16/06 Martens/Sims 16 M&S Spending through Jan. ‘06

Run II PMG 2/16/06 Martens/Sims 17 Effort for Jan. 2006

Run II PMG 2/16/06 Martens/Sims 18 What’s Next? Schedule Review  Compare recent estimates to RLS  Prepare necessary CR’s for descoping (Stacktail, Band 4 Cooling Tank Upgrade and FY07 transition to AD Departments)

Run II PMG 2/16/06 Martens/Sims 19 Contingency Contingency Needs –  We understand there is $1.5 Mill remaining in the Directorate held contingency fund for Run II.  We do not plan to add new scope at this time.  Contingency may be needed for any subproject overruns in the next 6 months or so.  One Remaining Vulnerability is the 40 MW 345kv to 13.8kv transformers at KRS/MSS. RLS has $0. Rough estimate is $1.1 million.