Driving Status of N*Grid Project in Korea August 27, 2003 Jongsuk Ruth Lee KISTI Supercomputing Center
Table of Contents Definition of Grid Status of Resources & Grid Necessity N*Grid Project Plans for Activating N*Grid Project Implementation of Grid Testbed Development of Grid System Research on Grid Applications Strategy for N*Grid Project Milestones Summary
Definition of Grid
Research Infrastructure for dynamically collecting & integrated sharing Research Resources connected by high-speed network Large Scale Data Scientific Research Instrument Experts Problem Solving GRID Supercomputer
Status of Resources & Grid Necessity
Status of Research Resources (1/2) Status of Supercomputer usage ( KSCA, ) Organization Utilization KISTI 80% KMA 80% SNU 70% DIU 30% CNU 40% POSTECH 60% PNU 70% K-JIST 60% NameOrganization High Voltage Transmission Electron MicroscopyKBSI NMR SpectroscopyKBSI Hanbit Plasma EquipmentKBSI Electron Linear AcceleratorPOSTECH Research Reactor HanaroKAERI Wind tunnelKARI Flight SimulatorKARI Status of the only Research Instruments Holding
Status of Research Resources (2/2) Status of Research Networks Domestic KOREN : 30Gbps/1GbPS KREONET2 : 10Gbps/1Gbps International APII Testbed (Korea – Japan) : 1Gbps etc TEIN : ~ 30Mbps STAR TAP LINK : ~155Mbps Campus/Industry Network : Gbps
Necessity of Introducing Grid (1/2) Demand of Domestic Computing Resources Rmax(TFlops) USAKOREADomestic Demand
Necessity of Introducing Grid (2/2) Necessity of Research Infrastructure Implementation Necessity of investing fund to implement Grid infrastructure for 6T researches to access any computing resources and data any time and any where * Status of 6T Research Fund ( IT News : ) AreasIT Research Fund billion BT billion ET billion ST billion NT 81.9 billion CT 32.3 billion Total billion
N*Grid Project
11 N*Grid includes National Computational Grid National Data Grid National Access Grid National Application Grid (Ex: Bio Grid, CFD Grid, Meteo Grid etc) including application testbed and portals N*Grid is planned at the government level by MIC(Ministry of Information and Communication) 5 year project ( ) Total budget : ~ 32M USD N*Grid Project (1/6)
History of N*Grid with KISTI : Preceding research Development of metacomputing technology on heterogeneous supercomputing resources(The result is published at PDPTA2000 conference) Development of a portable computational steering package: CSP 2000: Initiation of Globus-related research and activity Building of Globus-based metacomputing test-bed Satoshi Sekiguchi(TACC, Japan) proposed Korea to join APGrid(Jun., Dec.) 2001: N*Grid start KISTI Supercomputing Center suggest at MIC to carry out N*Grid(Feb.) MIC announced to start N*Grid as a 5 year( ) national project(May.) Korea Gird Forum will be launched in Oct., N*Grid Project (2/6)
Major Contents of N*Grid ( ) Building and operation of Grid Network (using KOREN, APII Testbed, KREONet2, HPCNet, etc.) Grid application project survey and support (Bio, CFD, Meteo, etc.) Grid related R&D and standardization (Grid middleware & Grid browser, etc.) Promotion for sharing of high performance computers and large-scaled research instruments (Supercomputer, Storage, etc.) Construction of Grid Forum Korea (Include gov., univ., research inst., etc.) N*Grid Project (3/6)
14 Grid Middleware Internet 1 & 2 High Speed Network/ATM Supercomputers Large capacity Storages Research Instruments Creative Experts GRID Project Survey & Support (NGI Killer Appl.) Increase Research Power for fundamental Science and Industry Application → Activation of NGI Business Application Leap for World Top 5 Country in Knowledge Infrastructure (Enhancement of National Competitiveness) Execution of Grid Application Project Emerging Industry: IT, BT, NT, ET, etc. Industry: Semiconductor, Car, Steel, Machinery, etc. N*Grid N*Grid Project (4/6)
N*Grid Project (5/6) KISTI is the leading edge institution Selected research partners from academia, industry, and government lab through a public competition 13 partners in constructing Grid infrastructure (e.g., Construction of national supercomputer Grid) 8 partners in Grid middleware researches (e.g., Grid technology for high-end Grid environment) 10 partners in Grid applications R&D (e.g., Virtual Wind Tunnel using Grid) 2 partners in Grid standardization of Grid middleware technology (e.g., GridIR WG, DAIS WG)
N*Grid Project (6/6) GFK (Grid Forum Korea) The Grid organization in Korea (878 members from 254 organizations & 25 WGs as of Aug. 2003) Its support is included in the N*Grid project GFK 2002 Summer Workshop (July 11-12, 2002, 280 participants) GFK 2002 Winter Workshop (Dec , 2002, 200 participants) GFK 2003 Summer Workshop (Aug , 2003, 220 participants) Working Groups Application Area : 10 WGs Middleware Area : 6 WGs Network Area : 2 WGs Etc.: 7 WGs Participating Individuals Government Institution :41 University : 95 Research Institute : 475 Industry : 267
Plans for Activating N*Grid
Plans – Implementation of Grid Testbed (1/2) Implementation of Computing Grid Testbed Public supercomputer: 8 HPC PC Cluster: 8 KMA KOREN, APII, TEIN, STARTAP KREONET2, HPCNET KAIST POSTECH KISTI CNU KJIST DIU SNU KIAS SAIT KIST KISTI UOS PNU Supercomputer Cluster
CNU SAIT Plans – Implementation of Grid Testbed (2/2) Implementation of Access Grid Testbed Large Scale Storage: 8 VR System: 3 Access Grid System: 3 KOREN, APII, TEIN, STARTAP KREONET2, HPCNET Grid Middleware SNU KMA KISTI EVL KISTI KJIST KNU PNU KMA KRIBB KIST NCSA KISTI Storage VR System Access Grid System
Plans – Development of Grid System (1/4) Development of N*Grid Portal System Providing Grid log-in, distributed file transfer, collection and integration of results, monitoring of Grid resources & jobs, etc
Plans – Development of Grid System (2/4) Development of Grid Advanced Information Service System Providing the integration function of multiple resources query interfaces, dynamic state information, dynamic virtual organization information, etc
Plans – Development of Grid System (3/4) Development of MoreDream Resource Management Supporting the functions of the Resource discovery, co-allocation, job submission, job monitoring, etc.
Plans – Development of Grid System(4/4) Development of N*Grid CA System Supporting the functions of the Web-interface, PKI, key automatic generation/management/search, etc.
Plans – Research on Grid Applications Application Researches on IT+IT, IT+BT, IT+NT, … based on Grid Applications for the large-volume and repeated computation Applications for massively parallel environment which are can divided and analyzed Bio, new drug, ST, NT, ET, Computer Graphic (Rendering), etc. Construction of bio-informatics portal grid Computational chemistry and Nano materials Molecule simulation of Bio/Nano materials Electronic structure computational Grid Nano materials computational Grid Comprehensive environmental flow model Large-scale finite element analysis technique on GRID environment Design shape optimization technology using virtual wind tunnel based on Grid Realization of virtual design & development Grid system Heat exchanger design under the Grid environment Examples
Plans – Implementation of Grid NOC Construction of Logical Grid Network and Technical Support using National & International Network A : Requirement of common use of national/international R&D network / Support of scientific technology application resources B : Requirement of scientific technology application resources / support & sharing of R&D network resources C: Control of user connection (providing connection channel between domestic R&D network) MIC Supercomputer/Cluster, Visualization System (SeeMore) Science Technology Information DB User Group Resources Establish Policies Implementation & Operation GRID Forum - Korea-Japan, Korea- Singapore Link - Korea-USA Link(via Japan) - National Size (Backbone over 15 areas) - Joining Institute: about 300 R&D Institutes - R&D Exclusive Korea-Japan and Korea-USA Links - Backbone over 5 areas - Joining Institute: 32 R&D Institutes KREONet/HPCNet/KREONet2 KORENAPII-Testbed - Bandwidth Allocation - User Connecting Control/Management - Network Facility Management/Operation - Network Security/Engineering GRID-NOC Interconnection BA A B User Group Domestic R&D Research Network CC
Plans – Strategy for N*Grid Project (1/2) Phased implementation of N*Grid infrastructure Exhibitory implementation from computing Grid Phased plans Year Implementation of Computing Grid Implementation of Grid mobile access environment Research on exhibitory applications Year Implementation of Data Grid Implementation of Virtual Realization Grid Research on specific applications Year Implementation of scientific research equipment Grid Implementation of open Grid
Virtual wind tunnel equipment Integration of Data Grid Integration of Access Grid Supporting mobile Grid III ( ) Electron liner accelerator DB centric Virtual realization system centric Including medium and small size computer II ( ) Electron microscopyStorage centric Access Grid system centric Medium and large size computing centric I ( ) Scientific Research Equipment Grid Data GridAccess GridComputing GridPhase Phase III ( ) Phase II ( ) Phase I ( ) Computing Grid Access Grid Data Grid Access Grid Computing Grid Scientific Research Equipment Grid Computing Grid Access Grid Data Grid Plans – Strategy for N*Grid Project (2/2)
Plans – Milestones Main Contents Phase Phase Phase Computing Grid Testbed. Medium and large size computer centric. Medium and small size computer inclusion. Supporting mobile Grid - Latest Access Grid Testbed. VR Grid. Access Grid. Data Grid - Scientific Research Equipment Grid Testbed. Electron microscopy. Liner accelerator. Virtual wind tunnel equipment Testbed - Research on Grid Applications. Research on exhibitory applications. Research on specific applications - Development of Grid System. Grid Portal. GNOC system. Collaborative VR System. Mobile Grid Access System Applications and System Development
Summary The goal of the N*Grid project is to build a national Grid infra as a high performance research cyber infra. The N*Grid project is to enhance research productivity in the fields of science and technology. The future direction of N*Grid project will be emphasized on the activation of Grid technology research - by participating in GGF WG/RGs for the international Grid technology standardization, - by implementing international standard Grid testbeds, and - by developing of Grid Middleware and applications.
Thank you for your kind attention. For more information,