André Augustinus 26 October 2004 ALICE Technical Board DCS for ‘services’ costs On behalf of Lennart Jirdén.

Slides:



Advertisements
Similar presentations
André Augustinus 22 June 2004 DCS Workshop Status on services controls.
Advertisements

1 DCS Cost DCS Workshop L.Jirden u Central DCS cost u Detector DCS cost.
André Augustinus 5 March 2007 Infrastructure status.
André Augustinus 15 March 2003 DCS Workshop Safety Interlocks.
1 DCS Installation & commissioning TB 18 May 06 L.Jirden Central DCS Detector DCS Status.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
André Augustinus 16 June 2003 DCS Workshop Safety.
André Augustinus ALICE Detector Control System  ALICE DCS is responsible for safe, stable and efficient operation of the experiment  Central monitoring.
1 ALICE Detector Control System (DCS) TDR 28 January 2004 L.Jirdén On behalf of ALICE Controls Coordination (ACC): A.Augustinus, P.Chochula, G. De Cataldo,
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
1 Responsibilities & Cost ALICE DCS Review 14 Nov 05 For the DCS Team L.Jirden.
DCS aspects of TDAQ racks in USA15 and SDX1 Y. Ermoline et al. ATLAS Week, CERN, 15 February 2005.
DCS LEB Workshop ‘98, Rome, Detector Control System, H.J.Burckhart,1 Detector Control System H.J Burckhart, CERN u Motivation and Scope u Detector and.
The Detector Safety System for LHC Experiments Stefan Lüders ― CERN EP/SFT & IT/CO CHEP03 ― UC San Diego ― March 27 th, 2003.
ALICE PC Rack Cooling System Sensor Marco Boccioli André Augustinus Giulia Fanti F.W. Olin College of Engineering.
DSS Advisory Board Christoph Schäfer Rack Safety System.
The Three Important Topologies By: Parimal Satashia.
JPV, TB of Nov.15 th, ‘Rack Status‘ Jean-Pierre Vanuxem, PH-AIS.
1 Status & Plans DCS WS L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM.
1 ALICE Control System ready for LHC operation ICALEPCS 16 Oct 2007 L.Jirdén On behalf of the ALICE Controls Team CERN Geneva.
NCSX NCSX Preliminary Design Review ‒ October 7-9, 2003 G. Oliaro 1 G. Oliaro - WBS 5 Central Instrumentation/Data Acquisition and Controls Princeton Plasma.
André Augustinus 16 September 2002 Safety issues.
DCS Workshop - L.Jirdén1 ALICE DCS PROJECT ORGANIZATION - a proposal - u Project Goals u Organizational Layout u Technical Layout u Deliverables.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
1 Status and Plans DCS workshop L.Jirdén u Budget u Status u Planning u Goals for end 2002.
1 Responsibilities & Planning DCS WS L.Jirdén.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
André Augustinus 10 October 2005 ALICE Detector Control Status Report A. Augustinus, P. Chochula, G. De Cataldo, L. Jirdén, S. Popescu the DCS team, ALICE.
1 Cost of controls TB L.Jirdén. 2 LAN WAN Storage Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Experimental equipment.
Overview of Tracker Interlocks Designed to protect tracker equipment, in particular the VLPC cassettes, from damage due to failure in part of the tracker.
Three types of network cabling Star Topology Tree Topology Linear Bus.
The Scheme of Slow Control System in BESIII Xie Xiaoxi Gao Cuishan
André Augustinus 6 October 2005 Cabling, Interlocks, Racks Some remarks.
Electronic Systems Support Demonstrator Racks Rack coordination meeting 12 October 2004.
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
André Augustinus 10 March 2003 DCS Workshop Detector Controls Layout Introduction.
JCOP Review, March 2003 D.R.Myers, IT-CO1 JCOP Review 2003 Architecture.
ST/MAforLHC April 2003Sixth ST workshop1 Summary of ST/MA deliverables for LHC Luigi Scibile for the ST/MA group.
André Augustinus 16 September 2002 PVSS & Framework How to get started.
DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.
3.3 Data Networks. Overview Identify the main differences between LAN and WAN. Identify the advantages of using a network over stand-alone computers.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
André Augustinus 16 June 2003 DCS Workshop General Purpose Monitor.
André Augustinus 9 October 2006 Interlocks update.
Review of Safety Systems for the LHC Experiments & Experimental Areas Emmanuel Tsesmelis / TS-LEA LEMIC 20 March 2007.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
Control, monitoring and safety aspects of electrical distribution in the Atlas experiment W.Iwanski PH/ESE-BE.
GIF++ Control System (GCS) Gilles MAIRE PH-DT-DI1.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
DCS overview - L.Jirdén1 ALICE ECS/DCS – project overview strategy and status L.Jirden u Organization u DCS system overview u Implementation.
André Augustinus 16 September 2002 Muon tracker URD summary or, what we understand from the URD.
DETECTOR CONTROL SYSTEM FOR THE ALICE EXPERIMENT AT CERN -LHC Anik Gupta ICTDHEP JAMMU 11 th September 2013 Special Thanks to the ALICE CONTROLS COORDINATION.
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
Clara Gaspar, April 2006 LHCb Experiment Control System Scope, Status & Worries.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
1 Infrastructure and DCS Presentation of the Infrastructure Controls aspect in the ALICE DCS Based on U ser R equirements D ocument …you should still know.
André Augustinus 18 March 2002 ALICE Detector Controls Requirements.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
André Augustinus 13 June 2005 User Requirements, interlocks, cabling, racks, etc. Some remarks.
1 COSTING DCS WS L.Jirdén. 2 LAN WAN Storage Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Experimental equipment.
Detector Safety System overview DSS is a PLC based system designed to protect ATLAS detector from damages. Front end (hardware) 2 redundant PLC ~700 input.
M.Tavlet, H.Taureg - ALICE
2016.
ESS Main Control Room & ICS Infrastructure
Akraino Lab IT Requirements for 2019 Budget
Presentation transcript:

André Augustinus 26 October 2004 ALICE Technical Board DCS for ‘services’ costs On behalf of Lennart Jirdén

André Augustinus 26 October 2004ALICE Technical Board LAN WAN Storage Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Experimental equipment Controller/ PLC VME Field Bus LAN Node cooling gas Magnets Rack control Electricity Safety: DSS Safety: CSAM Infrastructure Services Central DCS Detectors 250K (racks, computers, network, cabling) Total 1511K Detailed costing per detector being prepared by Lennart. (for a next TB) Note: gas and cooling controls included in the overall costs of gas and cooling Presented by Lennart in September TB

André Augustinus 26 October 2004ALICE Technical Board Magnets Rack control Power distribution control Safety: DSS Safety: CSAM (LHC safety) Experimental Environment Services Safety: Sniffer 200 Cost of services (detail) L3300 K Dipole364 K Hardware (PLC etc.)80 K Sensors2 K Cabling70 K Sensors only; rest covered by LHC 50% by LHC 50% ALICE B-field, temperature, alignment etc. (only connection to DCS, not the sensors) Next slide Area monitoring+smoke det. Smoke detection covered by LHC; rest (20K) by TS/LEA Total 1511K 20

André Augustinus 26 October 2004ALICE Technical Board “Hazemeyer” Racks PLC PC LAN T TT T T TT T S SS S S SS S CANbus Rack control Power distribution control “interlock” “PLC” Services Cost of services (detail) [Power distribution & racks] Hardware116 K Software22 K Cabling62 K Rack monitoring90 K cabling15 K Smoke detection80 K Rack Mon. Smoke detection

André Augustinus 26 October 2004ALICE Technical Board Overview SystemDetailCostBudget MagnetsL3300 K Common fund Dipole364 K Rack ControlRack monitoring90 K Common fund Cabling15 K Smoke detection80 K Power distribution controlHardware116 K Rack budget Software22 K Cabling62 K Safety: DSSHardware80 K Common fund Sensors2 K Cabling70 K Safety: CSAM (LHC safety)CSAM system- LHC budget Sensors70 KCommon fund Safety: Sniffer200 K100 K TS/LEA; rest (100 K) common fund Smoke detection- LHC budget Area monitoring20 KTS/LEA budget Experimental environment20 KTS/LEA budget Total: 1171 K from common fund; 200 K from rack budget; 140 K from TS/LEA budget