Cherry Point Cogeneration Project Overview Presented to NWPPC Cogeneration Round Table June 24, 2003.

Slides:



Advertisements
Similar presentations
Adapting to a Changing Energy Environment Russ Girling, President and CEO, TransCanada Corporation May 15, 2012 STRIKING A BALANCE IN THE MIDST OF CHANGE.
Advertisements

10 February 2009 The Case for Coal Generation Sandy Rae, Energy Management Director.
Procuring Our Way to Compliance IEP 27 th Annual Meeting September 23, 2008 Fong Wan, PG&E.
Alberta’s Future Electricity Needs: What’s the Real Story? Economic Developers of Alberta Annual Professional Conference April 10, 2014 John Esaiw, Director.
DISTRICT HEATING: AN OVERVIEW PRESENTED BY: NIELSEN SYSTEMS APRIL 8, 2011.
NARUC 2015 Winter Meeting February 16, 2015 Combined Heat and Power and the Clean Power Plan Bruce Hedman Institute for Industrial Productivity.
Cogeneration Facility The University of North Carolina at Chapel Hill Cogeneration Systems Energy Services Department Phil Barner- Cogeneration Systems.
Tom Theising, C.E.M., C.D.S.M. (979) An Organized Approach to Energy Management SSCET, Sep 19, 2014.
1 AEC October 31, To Chicago Western U.S. Gas Grid Northern Border Kern PGT Northwest El Paso CIG & WIC Trailblazer CIG KN Potential Connect to.
FIFTH ANNUAL FEDERAL ENERGY WORKSHOP & DEFENSE ENERGY PARTNERSHIP FORUM | PAGE 2 Daniel White, Berkeley Research Group September 16, 2014 Challenges,
Tenth Annual Midwest Energy Conference March 7, 2007 How Best Satisfy Midwest Electric Load Growth? Thomas R. Casten Chairman Recycled Energy Development.
Combined Heat and Power (CHP) The Draft New Jersey Energy Energy Master Plan calls for the development of 1,500 MW of CHP generation over the next ten.
COMBINED HEAT & POWER J.R. Simplot Mountain Home, Idaho.
Why We Made the Decisions We Made and Where We Are in Building New Generation February 17, 2005 Prepared by Nilaksh Kothari, P.E. General Manager Manitowoc.
CALPINE March 2, 2004 HARVARD ELECTRICITY POLICY GROUP Natural Gas and Electricity Ron Walter Executive Vice President.
Coral Energy / Shell Trading Producer Services Wyoming Pipeline Authority October 28, 2003.
North American Power Generation by Fuel Type MW (000’s) History Forecast Hydro + Other Nuclear Coal Gas.
COGENERATION Allison M. Selk 12/8/04 CBE 562.
Ownership Newark Container Terminal Jaxport Container Terminal American Ref-Fuel Plant Kern River Pipeline Boron LNG Plant Sunrise Power Plant $7 Billion.
POWER GENERATION TECHNOLOGIES
Engineering Technology Division
1 Opportunities for Investment in the current Canadian power climate Bob Livet, P.Eng. Vice President Energy Operations AMEC Americas Limited Presented.
“Specializing in Operational Excellence” Outsourcing Is it right for you? Texas Technology Showcase Houston, Texas March 18, 2003 Integrated Process Solutions.
Energy & Electricity. History of Electricity/Grid Electricity “system” created in US 1881  Purpose was electricity for lights  1881 cost: $0.24/kWh!
Genesis Solar Module Brochure ™
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
“ From Waste to Resource Management: A New Way of Thinking about Waste Services and Contracts” Materials Management Resource Recovery Process (Private.
Renewable Energy: Legal and Policy Issues Frank Prager Vice President, Environmental Policy Xcel Energy November 20, 2009 Frank Prager Vice President,
Regulatory Flexibility Committee Competitive Procurement September 18 th Joe Kerecman Director Government and Regulatory Affairs
Biomass “Struggling to make it work”- the Canadian Experience IEA Task 38 Meeting Doug Bradley- Domtar Edinburgh, Nov 12, 2001.
COPYRIGHT © 2010 BALLARD POWER SYSTEMS INC. ALL RIGHTS RESERVED B A L L A R D P O W E R S Y S T E M S PUTTING FUEL CELLS TO WORK NOVEMBER 2010 Utilizing.
COMBINED HEAT & POWER J.R. Simplot Mountain Home, Idaho.
Resource Planning Georgia Power’s Diverse Plan to Meet Georgia’s Energy Needs AWMA Fall 2010 Conference October 7, 2010 Jeff Burleson Director of Resource.
CONFIDENTIAL AND PROPRIETARY Invenergy’s Views on Cogeneration Opportunities Presented to: April 30, 2015.
Title Of Presentation CONNECTING THE NORTH Arctic Gas Symposium November 2001 Houston, TX.
Squamish Neighbourhood Energy Utility: Final Feasibility Presentation Prepared for: District of Squamish and Project Sponsors Prepared by: Compass Resource.
Southern Energy, Inc. “Natural Gas and Electricity: Looks Like a Good Marriage” Pamela S. Pierce IPAA Luncheon November 8, 2000 Houston, Texas.
CLEANER ENERGY for a Greener future CLEANER ENERGY for a Greener future Laidlaw Energy Group, Inc. 90 John St 4 th Fl New York, NY
No energy wasted Example of an energy strategy in urban areas Brussels, 22nd June 2006.
Regulatory Flexibility Committee Strategies for Procuring New Generation September 18, 2013 INDIANA POWER OF WIND COALITION.
WORLD ENERGY OUTLOOK OIL & GAS SUPPLY MOEB/D Existing New Actual
1 Distributed Energy Resources: Bringing Energy Closer to Home Presentation by the Industry Task Force on Distributed Generation July 28, 2005.
Biomass CHP Project at Pilgrim Hospital Boston United Lincolnshire Hospitals NHS Trust.
Kalina Scherbel December 4, 2003 North American Tar Baby: Draining the Alberta Oil Sands.
A View to The North Canadian International Petroleum Conference June 12, 2001 A View to The North Canadian International Petroleum Conference June 12,
Managing the Environmental Considerations of Power Generation Canada Europe Round Table for Business Brussels September 20, 2004 Frederick W. Firlotte.
Klondike Wind Power Project, Oregon Donald Furman Senior Vice President - Business Policy and Development December 3, 2009 Energy Bar Association Mid-Year.
Wyoming Pipeline Authority July 22, Nicor, Inc. $2 billion NYSE market cap Debt is rated “AA” by S&P Corp has several gas-related unregulated ventures.
Combined Heat and Power Workshop Report and Next Steps Power Committee Briefing 7/15/03.
Cogeneration (CHP – Combined Heat & Power) October 2013 © Siemens AG All rights reserved.
1 Energy Efficiency Programs For Local Governments & Community Partners Christina Prestella Program Manager, Government & Community Partnerships PG&E September.
2015 Mace Advocacy alliance policy conference
1 Is there LNG in California’s Future? “LNG: When East Meets West” Zeus Development Conference Long Beach, CA by David Maul Manager, Natural Gas Office.
CALIFORNIA ENERGY COMMISSION Compressed Natural Gas Workshop August 3, 2005 Natural Gas Quality: Power Turbine Performance During Heat Content Surge William.
1 19 th World Energy Congress – 2004 Round Table 1 – Non Fossil Fuels: Will They Deliver? Jerson Kelman President, Brazilian Water Agency - ANA.
BP Holdings. Kinder Morgan and BP North America Enter into Long-Term Agreements Kinder Morgan Energy Partners, L.P. (NYSE: KMP) and BP North America (NYSE:
Compressed Air Energy Storage (CAES) Wind Integration Study Team September 10, 2009.
Enron North America. AC_01_ENA-1 Market-Making + Technology + Scale + Select Assets = Sustainable Competitive Advantage Enron North America North America.
Brownsville Overview Management Presentation November 2000
The Renewable Power Desk
Privileged and Confidential
Enron Corp. Board of Directors Presentation
Squamish Neighbourhood Energy Utility: Final Feasibility Presentation
Energy day July 3th, 2012.
Dominican Republic LNG and Power Plan Facility
Brownsville Overview Management Presentation December 2000
Presentation to the Enron Corp. Finance Committee
Mike Hachey Director, Power Marketing TransCanada Power Marketing Ltd
Energy Conservation CERD /12/2017
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Presentation transcript:

Cherry Point Cogeneration Project Overview Presented to NWPPC Cogeneration Round Table June 24, 2003

TransCanada Corporation Competitively positioned in natural gas transmission & power generation services $20 billion in Assets ($C at Dec 31, 2001) A- Credit Rating (S&P) TRP trades on the TSE and NYSE Headquartered in Calgary, Alberta, Canada A leading North American energy company

TransCanada Corporation In North America, TransCanada ships the largest volumes the longest distance in the coldest weather TransCanada Williams Kinder Morgan PG&E El Paso Duke Energy Enron MidAmerican

TransCanada’s Power Portfolio 19 Plants, 3 PPAs 4,150 MW operational 1,770 MW in development * Long Term PPA’s Bear Creek 80MW MacKay River 165MW Williams Lake 66MW Sundance A&B* 913MW Redwater 40MW Carselan d 80MW Cancarb 27MW Nipigon 40MW Calstock 35MW Kapuskasing 40MW Tunis 43MW Sheerness* 100MW North Bay 40MW Curtis Palmer 60MW Castleton 64MW Ocean State 560MW Bruce Power LP 1500MW ManChief 300MW Cherry Point 720MW Becancour 550MW Portlands 500MW - Active Plant - In Development - Market Area

TransCanada’s Business Drivers Advantaged Assets relative to CC Similar Economy of Scale Similar Dispatch Flexibility Lower Variable Costs Responsive to Market Right Timing Right Size Right Location Stable, Low Risk Growth Long Term contracts with credit- worthy counter parties No surprises

Cherry Point Project Overview Seattle Cherry Point Vancouver BP Cherry Point Refinery Proposed Cogeneration Plant 720 MW Combined Cycle Cogeneration Plant 3 F-Class gas turbines 1 Steam Turbine Fully Dispatchable (Back-up Boilers) Host Site: BP Cherry Point Refinery 225,000 bbl/d state-of-art refinery; Solomon top quartile performer BP North America: AA credit Project Structure Long term steam and power to BP Refinery 450 MW of power to 3-P contracts Balance of output to TC trading operations

Cherry Point Project Overview (cont.) Exclusivity: Q4, 2002 EPC Contractor Selected: Q4, 2002 Site Release: Q4, 2003 Third party power purchase agreements (PPA’s) EFSEC Permit Firm Transmission Agreements Commercial In-Service: Q2, 2006 Project Schedule:

Cherry Point Advantages Existing Infrastructure

Cherry Point Advantages Minimize Environmental Impact Reduce air emissions from Cherry Point complex Reduce water withdrawal from Nooksack River No new pipelines or transmission lines required Build on existing industrial site Cherry Point Project Rendering looking SE from Grandview Road

Cherry Point Advantages Competitive Price Heat rate advantage ~ 0.7 MMBtu/MWh better than CC Savings of $2.80/MWh 1 Ferndale pipeline tolls ~ 50% lower than Northwest Pipe Savings of $1.40/MWh Project can be dispatched off-line to take advantage of low hydro prices Building in “down market”; equipment and EPC costs at lowest point in years. 1 Based on $4.00 /MMBtu gas price

PURPA - Qualifying Facility Status Cherry Point Cogeneration Project Fuel Input 5440 MMBtu/hr Useful Thermal Output 700 MMBtu/hr Useful Power Output 720 MWh or 2450 MMBtu/hr Useful Thermal Energy Purpa Efficiency Cherry Point 13% 51% Purpa Threshold >5% = >45% Meets Threshold

Cherry Point is an Advantaged Generation Asset Cherry Point Layout, looking NE Heat rate advantages vs. stand-alone CC Dispatchable plant Economy of scale Gas supply infrastructure advantages Strong, committed project proponents Cogen emissions offset by refinery reductions Water cooled/water reuse plan “The economy of scale and flexibility of a large combined cycle plant with a cogeneration heat rate”

The Home Stretch - Ensuring Success! Remaining basic success factors reside with BPA: Transmission Market Clarity BPA’s role as resource provider post-2006 Price of BPA hydro power post Innovative solutions also reside with BPA: Return of Canadian Entitlement Integration and dispatch of Cherry Point for BPA preference customers

Cherry Point Cogeneration Project Overview For more information contact: Craig Martin Manager, Power Marketing & Development tel: