ISTEP Phase II Final Report Summary LTTIWG Meeting – January 27, 2009 Douglas Bowman, PE Lead Engineer, ICT Planning 501-688-1640

Slides:



Advertisements
Similar presentations
Cleco Transmission Planning Summit 2013
Advertisements

RPG: September 24, Approach for ERCOT Independent Review of the 2013 Houston Import Project Jeff Billo, Manager, Transmission Planning September.
March 6, 2008 Technical Advisory Committee Luminant Energy & Oncor Tyler Grande Autotransformer Addition and 138 kV Line Upgrade Project Jay Teixeira Manager,
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Company LOGO Cleco Planning Process. Models Cleco uses SPP’s annual series of models to determine the NERC reliability violations. Cleco uses SPP or VST.
Cleco Transmission Planning Summit 2012
2004 Congestion Costs. 2 Transmission Congestion Occurs when analysis shows a given outage of a transmission element (contingency) will result in the.
1 Entergy Louisiana, Inc. (North) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
NTTG Economic Study and Biennial Study Update NTTG Economic Study and Biennial Study Update NTTG Study Cycle.
Houston Import Evaluation Cross Texas Transmission & Garland Power & Light ERCOT RPG Meeting August 27th, 2013.
Cleco Transmission Planning Summit 2011 Coughlin Transmission Operations Center April 15, :00 – 11:00am.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
Navarro to Houston Presentation to ERCOT RPG August 27, 2013.
January 5, 2012 TAC Cross Valley 345 kV Project Jeff Billo Manager, Mid-Term Planning.
ICT 2009 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2009 Astor Crown Plaza New Orleans, Louisiana.
Entergy Transmission Planning Summit New Orleans, LA July 31, 2007
ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.
1 Entergy Louisiana, LLC (South) & Entergy New Orleans, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans,
George Bartlett Director, Transmission Operations Economic Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Houston Area Dynamic Reactive Project March 11,
ICT Strategic Transmission Plan (ISTEP) Review and Status Update Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans, Louisiana Douglas.
Report on the NCTPC 2006 Collaborative Transmission Plan Mark Byrd, Manager – Transmission Planning Progress Energy Carolinas, Inc January 25, 2007.
JACKSBORO TO WEST DENTON 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
1 Update on the 2006 Transmission Study LPSC B&E Meeting Baton Rouge, LA November 29, 2006.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Transmission Planning Summit.
Peak RCCo Performance Metrics Draft –November 2013.
1 Entergy Texas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 29, 2008.
OSC Meeting April 27, Transmission Cost Allocation Overview.
Base Plan Development Overview 2007 Transmission Summit July 31, 2007 New Orleans, Louisiana.
June 19, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
October 16, 2009 RPG Meeting ERCOT 2009 Five-Year Transmission Plan Update Jeff Billo.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 1 Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans,
Proposed North – South Congestion Mitigation Plan Luminant Energy July 2008.
1 Stability Issues in Entergy System Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
1 Entergy Gulf States Louisiana, L.L.C. Proposed Transmission Reliability Projects.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
1 Entergy Louisiana, Inc. (South) & Entergy New Orleans, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans,
1 Entergy Louisiana, Inc. (South) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
WEST LEVEE TO NORWOOD 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
© ABB Group August 23,2010 | Slide 1 MBPC Study – 1 st Load Pocket Preliminary Results for Discussion only Entergy Regional State Committee (ERSC) Southwest.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 31, 2007.
1 1 1 Central Maine Power Local System Plan Presentation Planning Advisory Committee Meeting November 19, 2008.
Project Tracking Update July 12, 2011 MOPC. 2 STEP List (Excel Spreadsheet) –Engineers enter technical data and analysis on upgrades –Used as a repository.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
SPP.org 1. Final Report: Reliability and Economic Assessments Stakeholder Meeting December 1, 2008 Austin, TX.
SPP.org 1. ICT Working Groups Current Activities Jody Holland Dowell Hudson Antoine Lucas Tim Phillips.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
October 16, 2009 RPG Meeting ERCOT Independent Review of the Corpus Christi Improvements Project Jeff Billo.
ESI Alternate Economic Study Process E-RSC Meeting October 21, 2010.
Coordinated Planning Concept (For Discussion Only) revised 11/30/04 07/01/04.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
Transmission Services Report: North and West RPG Projects Bill Bojorquez TAC July 7, 2005.
ISTEP Update Transmission Planning Summit August 11, 2009 Crown Plaza Hotel New Orleans, LA.
1 Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 29, 2008.
SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 2 Entergy ICT Transmission Planning Summit July 29, 2008 Astor Crown Plaza.
Douglas Bowman, PE, PMP Project Manager Entergy Corporation New Projects and Processes Ensure Power Transfer for Northeast Arkansas Customers.
Presentation For PSAST May 14, Outline Most Limiting N-1-X Events Voltage Limitations For Loss of Three Terminal Monroe- Echo Lake 500kV and Chief.
1 Entergy Gulf States, Inc. (Texas) Approved & Proposed Transmission Reliability Projects Entergy/ETEC Subcommittee Meeting The Woodlands, TX November.
Presentation to Board of Education 1 August 2014 Facilities Capital Plan Board of Education Update August 28,
Freeport Area Master Plan Project -
Agenda Provide a recap of primary northern route alternatives for the MPRP Describe basis for selected route N5 Overview of analyses performed Description.
Acadiana Load Pocket Project
Strategic Plan and Economic Upgrade Process
Presentation transcript:

ISTEP Phase II Final Report Summary LTTIWG Meeting – January 27, 2009 Douglas Bowman, PE Lead Engineer, ICT Planning

Executive Summary ICT Strategic Transmission Expansion Plan Attachment K –Paragraph “The ICT will identify potential economic upgrades on the Transmission System, including upgrades to existing facilities as well as construction of new facilities.” –Paragraph 14.3 – “The ICT will identify such upgrades based on screening criteria, which may include considerations such as frequent transmission loading relief events, frequently constrained flowgates in the Available Flowgate Capability process or Weekly Procurement Process (WPP), flowgates with high congestion costs as identified in the WPP process, and commonly invoked must-run operating guides.”

Background Phase I Report 12/4/ Projects proposed Stakeholder Priority Ranking of Projects – 5 projects Acadiana Upgrades South LA Bulk Central AR 230kV Central MS Bulk McAdams Series Reactor Phase II – Study these 5 projects

ISTEP Phase II Projects Central Arkansas McAdams Central Mississippi Bulk Acadiana Load Pocket South Louisiana Bulk

Analysis –Engineering PSSE, PTI Must Contingency Analysis Transfer Capability Analysis –Economic GridView Congestion Analysis

Richard – Sellers 230 kV Sellers – Meaux 230 kV Sellers– Moril 230 kV Sellers – Labbe 230 kV Wells – Labbe 230 kV Labbe – Bonin 230 kV Sellers Richard – Sellers 230 kV Sellers – Meaux 230 kV Sellers– Moril 230 kV Sellers – Labbe 230 kV Wells – Labbe 230 kV Labbe – Bonin 230 kV Sellers Richard – Sellers 230 kV Sellers – Meaux 230 kV Sellers– Moril 230 kV Sellers – Labbe 230 kV Wells – Labbe 230 kV Labbe – Bonin 230 kV Sellers Richard – Sellers 230 kV Sellers – Meaux 230 kV Sellers– Moril 230 kV Sellers – Labbe 230 kV Wells –Labbe 230 kV Labbe – Bonin 230 kV Sellers Acadiana Upgrades Study Report 10/20/08 MOU agreement –Cleco Power –Entergy Gulf States –Lafayette Utilities System Press Release $200MM Cost Estimate $107MM savings per year 1.9 year simple payback

South LA Bulk AKA Webre-Wells Project Wilbert_Champ_Wells 230kV + Acadiana Upgrades Recommended Eliminates WW N-1 overloads Eliminates 91 base case N-1 contingency overloads Multiple flowgates relieved $325MM Cost Estimate $117MM savings per year 2.8 year simple payback

Central AR 230kV Little Rock 230kV Upgrades Recommended Relieves overloads of various elements in LR Area Increases voltages in LR Conway flowgates relieved $111MM Cost Estimate $29MM savings per year 3.8 year simple payback

Central MS Bulk 1Upgrade: Grand Gulf – Ray Braswell 500kV Small improvement in transfer capability Project not economically feasible The upgrade Ray Braswell – Baxter Wilson 500kV terminal breakers and switches ($7.16MM) may provide potential benefits. Future study?

McAdams Series Reactor February ICT Report –Increased transfer capability between TVA/Entergy Summer McAdams 500/230kV transformer re- rated and fans added – Rating 560MVA >>>> 615MVA Affected System Study – impediments to transfer –Pelahatchie – Morton 115kV Upgrade –South Jackson – Florence 115kV Upgrade –Should be included in Entergy’s 2009 Construction Plan

Next Steps Phase II Results –Parties interested in pursuing these projects should perform detailed studies to determine stakeholder-specific benefits –Parties interest in constructing upgrades should approach the ICT to engage in joint process with Entergy to determine estimates, timelines, agreements, etc. Phase III – 2009 –SPP/Entergy Seams projects –Projects to improve system economic dispatch –Other beneficial projects