LIGO-G070130-00-W eLigo PSL laser diode room strawman design Rick Savage, Anamaria Effler, Peter King.

Slides:



Advertisements
Similar presentations
Air and Water Chiller Basic Class
Advertisements

Heating, Ventilating, and Air-Conditioning
LIGO-G V8 1 aLIGO DC Power Distribution Contents.
1 Optimizing the Efficiency of the NCAR-Wyoming Supercomputing Center Ademola Olarinde Team Member: Theophile Nsengimana Mentor: Aaron Andersen August.
RANGE GUARD / GAYLORD HOOD.
André Augustinus 16 June 2003 DCS Workshop Safety.
Variable Frequency Drives VFD Basics
Using Benchmarking to Identify Energy Efficiency Opportunity in Cleanrooms; The Labs 21 Approach William Tschudi and Peter Rumsey June 29, 2004
Enhanced LIGO Laser System S. Wagner, B. Schulz, R. Wachter, C. Veltkamp, M. Janssen, P. Weßels, M. Frede, D. Kracht.
3U ATCA Shelf October Proprietary and Confidential-
TECHNICAL TRAINING 2008.
according EU Standard EN
LIGO-G W LIGO II Pre-stabilized Laser System Design Requirements and Conceptual Design David Ottaway, Todd Rutherford, Rick Savage, Peter Veitch,
Project Update 5/9/06 E. Colby, E163 E163: Laser Acceleration at the NLCTA Goal: Demonstrate the technical feasibility of laser-driven particle acceleration.
Dillard’s Energy Management
Charles University in Prague Institute of Particle and Nuclear Physics Brief presentation Zdenek Dolezal.
 Install new air cooled high efficiency screw chiller (variable speed)  Install new fan coils with ECM motors and low temperature heating coils and proper.
Power Stabilization of the 35W Reference System Frank Seifert, Patrick Kwee, Benno Willke, Karsten Danzmann Max-Planck-Institute for Gravitational Physics.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
Alarmline Linear Heat Sensor Typical Applications.
Central Region Discussion Power and Cooling GDE Beijing-CFS.
High Density Cooling Air conditioning for high density applications
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
LIGO-G v5 1 Pre-stabilized Laser System (PSL) Technical Status NSF Review of Advanced LIGO Project Benno Willke, AEI Hannover and the AdvLIGO PSL.
High Sensitivity Smoke Detection
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
Virgo Commissioning update Gabriele Vajente for the Virgo Collaboration LSC/VIRGO Meeting – MIT 2007, July LIGO-G Z.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
N O R T H A M E R I C A C O M M E R C I A L TDP
Advanced LIGO laser development P. Weßels, L. Winkelmann, O. Puncken, B. Schulz, S. Wagner, M. Hildebrandt, C. Veltkamp, M. Janssen, R. Kluzik, M. Frede,
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
CPPM Pixel Evaporative Cooling Plant Description & Operation with C 3 F 8 or C 4 F 10 G. Hallewell, CPPM, Feb 07, 2005.
-Proprietary and Confidential-
DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.
Status of the Advanced LIGO PSL development LSC meeting, Baton Rouge March 2007 G Z Benno Willke for the PSL team.
Pending mechanics issues for electronics/services (updated 18/08/05 by Ana) Fixation/shielding for 2 LV PS (no fingers):  - Clermont worked out a proposal.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
DETECTOR PIXEL CHIP MCM PIXEL BUS COOLING TUBE PIXEL BUS AND PILOT MCM CONNECTIONS (1) SDM comp LASER DIODE Space reserved (15mm) for connections.
YETS activities in n_TOF O. Aberle, S. Montesano (EN/STI)
18240 Element two - Components INPUTS OUTPUTS PURPOSE TYPICAL USE.
FPD SOFTWARE TEST MOTIONS / CONNECTIONS / CONFIGURATION / SOFTWARE / TESTS / CONCLUSION Lionel Peyrichoux 14 March 2001.
Cooling Test Results on fuzzy carbon substrate Setup in Lotima Room Used water/glycol mix (70/30 by wt) Neslab chiller to set temp Small pump to get the.
LIGO-G W Interferometer and modecleaner transients during the E2 run Rauha Rahkola and Ray Frey University of Oregon Rick Savage LIGO Hanford.
Claudio Bortolin. pump: replaced outlet filter: replaced demineralized cartridge: replaced mechanic filter on air control: replaced SSD chilled water.
Pixel Action Matrix C. Newsom July 15, Overview Critical Parameters Initial Discussion – Top 6 critical failures Discussion - Detailed Documentation.
LIGO-G W Status of the LHO PSLs Rick Savage LIGO Hanford Observatory LIGO Scientific Collaboration Meeting August 13-16, 2001.
Take 5 for Safety E. Lessard March 17, Equipment Identification Issue at NREL  On March 10, 2015, an NREL employee was performing preventative.
David BAILLEUX On behalf of the Caltech group Issues for the Laser Monitoring System M&O - US CMS ECAL IB meeting 19 March Chilled water supply.
S A Griffiths CM42 June 2015 Electrical & Control.
Power consumption (Watts) LBB27 ROS18 TSC50 TIM8 1 SC crate416 Alignment20 TOTAL per rack906~1 kW X2J22X2J02 With a water flow of 10 l/min, it should.
Test1 Here some text. Text 2 More text.
NEW RMC Rack Multi Control.
Building Automation System
Introduction to Mechanical Engineering
INSIDE in-beam PET system assembly and test at INFN Torino
AIR CONDITIONING.
2011/ 07/06 Jacqueline Yan IPBSM
LNG Production - Point Fortin, Trinidad
Facility upgrade Housekeeping, rad waste segregation, chemicals, safety issues, new configurations. Please see me or Keith.
Hazardous Gas Alarm System
EVLA LO/IF Racks/Bin/Modules
First Assembled Rod in US
[type text here] [type text here] [type text here] [type text here]
Your text here Your text here Your text here Your text here Your text here Pooky.Pandas.
Your text here Your text here Your text here Your text here
[type text here] [type text here] [type text here] [type text here]
PSL optical layout changes for eLigo
‘‘ BUILDING AUTOMATION’’
Presentation transcript:

LIGO-G W eLigo PSL laser diode room strawman design Rick Savage, Anamaria Effler, Peter King

LIGO-G W LSC-Virgo Meeting, March 2007 Baton Rouge2 Laser diode room in Mechanical Building Text here 87 m fiber run Isolation of vibrations and acoustics from chiller, EMI from switching power supplies

LIGO-G W LSC-Virgo Meeting, March 2007 Baton Rouge3 Diode room detail (LHO) Fibers and cables in overhead tray Video/phone/network connections Room temperature monitor Dust monitor Smoke detector –control room alarm HEPA filtered room – variable flow Two racks per AdvLigo PSL Portable HEPA panel for pump diode box maintenance Ante room for gowning/laser safety

LIGO-G W LSC-Virgo Meeting, March 2007 Baton Rouge4 Location of chillers for pump diodes and laser head Concrete block air handler room Locate chillers on top of air handler structure? One or two chillers? PSL head cooling strategy? investigations underway in Hanover