Controls & LLRF ILC Controls Telecon August 17, 2006 John Carwardine RDR Report Writing.

Slides:



Advertisements
Similar presentations
Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Advertisements

Nick Walker Marc Ross Akira Yamamoto GDE PAC Prague TDR Plans and Scope.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Controls Department LCLS Maintenance.
Introduction to Interactive Media 02. The Interactive Media Development Process.
The RDR Report Odyssey Nan Phinney SLAC for N^3 team of editors.
LIPAc status report EPICS Integration and Commissioning + RFQ LCS status at INFN/LNL Alvaro Marqueta LIPAc Project Team on behalf of the LIPAc Control.
September 2006 F. Richard LAL/Orsay 1 News from ELAN SC of CARE CERN September 2006.
J.C. Sheppard, SLAC Americas Region January 31, ILC Reference Design Report Status 2nd ILC Positron Source Collaboration Meeting IHEP, Beijing,
John Carwardine 1 TDR Editorial WG Summary Global Design Effort John Carwardine.
Global Design Effort Americas Region Efforts and Resources Mike Harrison GDE.
Controls & LLRF ILC Controls Telecon September 20, 2006 John Carwardine 1.Reports from ESRF Meetings 2.Misc. Items 3.Participant “Radar” Items.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
SC Project Review of NCSX, April 8-10, 2008 Central Controls and Computing WBS51 & 52 P. Sichta WBS5 Work Package Manager.
Proposed TDR baseline LLRF design J. Carwardine, 22 May 2012.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
Beam Physics Work D.S List of Workpackages Area packages Main beam electron source (Steffen Doebert) Main beam positron source (Steffen.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
John Carwardine 22 June 2012 TEB webex meeting. Agenda Management items (John) –General updates, status of submissions –Principle Editor assignments for.
Chapter 6 An Introduction to System Software and Virtual Machines.
1 Global Design Effort Beijing GDE Meeting, February 2007 Controls for Linac Parallel Session 2/6/07 John Carwardine ANL.
MDI DBD Editors Report Tom Markiewicz/SLAC SiD Collaboration Meeting, SLAC 22 August 2012.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
1 Status of SB2009 Rebaselining Proposal Document and Preview of Feedback from PMs + Editor Draft C N.Toge.
Nick Walker – SA meeting KEK Treaty Points and Costing Guidance Nick Walker 1 st System Area Managers Meeting KEK –
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
6-7 April 06 MAC Review Global Design Effort 1 RDR Management Accelerator Design Towards the RDR Nick Walker ILC-GDE.
1 Global Design Effort: Control System Vancouver GDE Meeting, July 2006 Controls Global System Review John Carwardine, ANL (For Controls Global Group Team)
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation.
GG3 Operations & Reliability (Availability) Eckhard Elsen Tom Himel
13 September 2006 Global Design Effort 1 ML (x.7) Goals and Scope of Work to end FY09 Nikolay Solyak Fermilab Peter Tenenbaum SLAC.
Controls Global Group Report John Carwardine ANL Presentation to GDE Bangalore Meeting, 10 March, 2006.
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Tor Raubenheimer KEK Mtg Goals KEK January 19 th, 2006.
Goals of the ILC-Asia Meeting at Pohang Fumihiko Takasaki PAL, Feb. 17, 2006.
April 2006 F. Richard LAL/Orsay 1 News from ELAN SC of CARE Paris April 2006.
Introduction D. Schulte for K. Kubo and P. Tenenbaum.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
ML (BC) Studies update Nikolay Solyak Arun Saini.
J.C. Sheppard, SLAC Americas Region February 7, ILC Source Systems Work Packages and EDR Discussions ILC GDE Meeting IHEP, Beijing, China J. C.
Project X RD&D Plan Controls Jim Patrick AAC Meeting February 3, 2009.
John Carwardine Editing updates, pdf build for top-level editing LCWS session on TDR 1 TEB Webex: 8 th October Global Design Effort John Carwardine.
January 9, 2006 Margaret Votava 1 ILC – NI/FNAL/ANL Brief overview of Global Design Effort (GDE) plans, dates, and organization: –Changes since Industrial.
TLCC Themes BAW-2, SLAC, 19 January 2011 Ross Walker Yamamoto 1.
Americas Regional Planning Exercises Tor Raubenheimer SLAC Beijing GDE Meeting February 4 th 2007.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
TDR Internal Review Chapter 5 Anders J Johansson.
ML-SCRF: Monthly WebEx Meeting April 4, Reports from PMs (20 min.) GDE activity and meeting plan Summary document of SCRF-Baseline Technical Review.
IIFC Instrumentation R&D for Project X at BARC C.K. Pithawa, T.S. Ananthkrishnan, Gopal Joshi – BARC Manfred Wendt – Fermilab.
TDR Technical Editorial Board Webex meeting, 16 th Dec 2011 Report from the Chair (John) Technical Editing reports (Benno, Maura) Review of TDR Outlines.
3/10/2006Marc Ross - SLAC1 RDR Instrumentation – Bangalore ILC-GDE meeting, 3/10/2006 Development and specification process Operations and Beam Dynamics.
Global design effort Americas 1 FY08-09 ILC-Americas planning G. Dugan ILC-Americas Planning meeting SLAC Sept. 13, 2006.
RDR Controls Design Walk- Through Controls and LLRF EDR Kick-Off Meeting August 20-22, 2007.
Management Items – (John) EC comments on TDR snapshot (Brian) Editing status reports (Editors) Other items, wrap-up 1 TEB webex meeting, 6 Aug 2012 Global.
Oct 22 Group Leaders Planning meeting
Computerized Systems in Clinical Research
The ILC Control Work Packages
EDR HLRF Work Packages Draft Summary
M.Jonker CTC MPO-WG status
Status and Plan of GDE Design Work (Including Road Map for RDR)
Yamamoto WG3: ML-SCRF Parallel Session,
Technical Design Report preparation
RF System (HLRF, LLRF, Controls) EDR Plan Overview
Presentation transcript:

Controls & LLRF ILC Controls Telecon August 17, 2006 John Carwardine RDR Report Writing

Controls & LLRF RDR Report Writing

Controls & LLRF 3 Deliverables Control & Timing Systems chapter (15 pages) LLRF Chapter (5 pages) Controls & Timing section for each area system chapter (1 page each)...? 1.Electron Source (Brachmann) 2.Positron Source (Sheppard) 3.Damping Rings (Gao) 4.RTML (Tenenbaum) 5.Main Linacs (Adolphsen) 6.Beam Delivery (Seryi) (Presumably) LLRF section for each area system chapter Updated BCD chapter Immediate deliverables (by end of August) –Chapter outlines + list of figures

Controls & LLRF 4 For reference: BCD outline for Instrumentation & Controls section 11.1 Controls Standard Architecture 11.2 Timing System 11.3 Diagnostic Interlock Layer 11.4 Global Network 11.5 Machine Protection 11.6 Low level RF 11.7 Feedback 11.8 Integration with Instrumentation 11.9 Machine Detector Interface Instrumentation – Beam position monitors Instrumentation – Beam profile monitors (transverse) Instrumentation – Longitudinal Instrumentation – other (intensity, loss, ring)

Controls & LLRF 5 For reference: RDR Controls costing outline (1) Control System Engineering –Management/Admin –Integration and Testing –Electronic Engineering –Technical Support –Control System Global Software (Applications, Framework, Infrastructure) –Controls Computing (Sys Admin, Networks, Databases, Computer Security) –Technical Systems Applications (fore each area) Global Control System Equipment –Computers –Network Infrastructure –Control Rooms RF Phase & Timing Distribution System –Central system –

Controls & LLRF 6 For reference: RDR Controls costing outline (2) Protection Systems –MPS –Beam Containment System –Personnel Protection System –(Diagnostic Interlock Layer) –(Machine interlock distribution network) Front-end Control System Equipment – Controls/LLRF Relay Rack Assembly & Test LLRF Engineering LLRF Equipment

Controls & LLRF 7 Rough draft of the RDR Controls chapter outline (1) Overview –Introduction, philosophy, top-level requirements, etc –Standards and Standardization, Quality Assurance –High Availability (requirements, impact on architecture, etc) –Requirements applied to the technical groups (eg DIL, standards, etc) Control system –Standard Architecture (software, framework, applications, etc) –Computing (servers, networks, databases, archiving, data management, etc) –Front-end electronics –Diagnostic Interlock Layer Timing and RF Phase Reference –Timing and sequence generator –RF phase reference generator –Timing and RF phase reference distribution

Controls & LLRF 8 Rough draft of the RDR Controls chapter outline (2) Protection Systems –Machine Protection System (MPS) –Beam Containment System –Personnel Protection System (PPS) Beam-based feedback –Pulse to pulse feedback infrastructure –Intra-train feedback systems.

Controls & LLRF 9 Schedule (per Nan Phinney) Rough 1 st DraftKEK MAC, Sept 20 –Detailed outline of section, incl. topics to be covered in description, subsystems, design –List of any graphics requiring pubs help Further draftsOctober –Text submitted to editors, graphics developed Complete DraftValencia, Nov 6 –Text should have been passed by editors, nearly final graphics and tables Also input to TDR R&D plans Chapter

Controls & LLRF 10 RDR and BCD documentation trail… Writing the RDR is an opportunity for us to consolidate our current thinking and to document it in one place. The RDR (and presumably the TDR) will be considered abbreviated snap-shots of the BCD, which will remain a dynamic document –At RDR release, we need to ensure the BCD and RDR are in sync. –The BCD does not have a page limit, so can go into more detail.

Controls & LLRF 11 Next steps (for Controls & Timing write-ups) Seek co-editors from each region to participate with final package integration, checking for consistency & completeness, edit, etc (in progress). Get input on the rough draft outline, finalize first draft outline by Aug 24. Identify authors / POCs for each section in the C&T chapter and for each AS, GS, and TS sub-section (by Aug 24). Section authors generate outline and preliminary lists of figures (by Aug 31).