P13631 Functional Review James Brinkerhoff, Christopher Kulbago, Patrick O’Connell, Lauren Pahls, Ted Rakiewicz, Sarah Salmon.

Slides:



Advertisements
Similar presentations
Engineering Design Standards Activity Step 1 Choose a strip of paper out of the bowl. Describe Engineering Design Standards with connections to the rest.
Advertisements

Product Line Overview Company Overview  Incorporated in 1983  Developed and patented first Electronic Cylinder Scale – Model.
Spaghetti Earthquake Structure  Working as a team, your goal is to design and construct a structure made of spaghetti, marshmallows, and tape.  This.
Wind Turbine Simulation (Phase IV) SDMAY Advisor: Dr. Venkataramana Ajjarapu.
Development of Laser Fuser Test Bed Project Number: P07501 Justin McMillan.
Nonlinear Dynamics Laboratory Equipment Andrew DickJoe Houtz Jeremy RedleckiAshley Rice James Streeter Client: Mechanical Engineering Dept. at RITFaculty.
Would like to present to you:. Demo Overview Developed an online calendar Meant for small organizations –Efficiency –Communication As well as personal.
P08211 – 5-minute Commercial DPM Student - Shadle Stewart Final Period - 11/12/07.
ESE Lab Computer based Temperature Control Sid Deliwala, ESE Labs.
Microprocessor System Design Using Coldfire Embedded Processor Mid-Term Presentation Marshall Belew Delilah Dabbs Terry Dahlke Brian Sladecek  2000 CPSC.
Team 10 Air Conditioning Experiment Members –Sean Gallagher –Pamela McDowell –Brian Davison –Prathana Vanarath Sponsors –Dr. Wexler –Dr. Advani Advisor.
Phase II Bearing Rig Enhancement Team Members Jared Shulman Christopher Skelding Daniel Hershey Asli Ozata Andy Zach.
Power Control System for a Concrete Durability Test Cabinet – Phase 2 Jacob Jameson Madhav Kothapalli Thomas Persinger Andrew Versluys.
EG1003: Introduction to Engineering and Design Sensors.
Project Lifecycle Section 6 - Closeout. Project Manager’s Role During Project Close-Out  Ensure that all project deliverables have been completed and.
Michael Bova- Project Lead Kevin Alderfer- Lead Engineer Ryan Selig- Hardware Engineer P Navigation Aid for Visually-Impaired.
System Design Review April 5th, 2013 P13623: Conductive Heat Transfer Lab Equipment.
Team: James Mazza, Andre Berwin, Peter Dunning, Nathan Fulcher, Andrew Watson, Travis Bardsley, Anthony Parker April 5, 2013.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Michał Bochenek Work Package 3: On-Detector Power.
Gravity Fed System Team Members: James Brinkerhoff, Christopher Kulbago, Patrick O’Connell, Lauren Pahls, Ted Rakiewicz, Sarah Salmon Group Number: P13631.
Power Control System for a Concrete Durability Test Cabinet – Phase 2 Jacob Jameson Madhav Kothapalli Thomas Persinger Andrew Versluys.
Basic of Project and Project Management Presentation.
Christopher Compton James Cooke Jonathan Gautney Joan Sureshkumar Software Engineering Radford University.
Gravity Fed System Team Members: Chris Kulbago, Lauren Pahls, Ted Rakiewicz, Patrick O’Connell, Sarah Salmon, James Brinkerhoff Group Number: P
Design Objectives The design should fulfill the functional requirements listed below Functional Requirements Hardware design – able to calculate transforms.
P16415: Human Powered Centrifuge Amanda Johnson Nathan Corr Pieter Werner Joanna Jayawickrema Laura Pratt.
School of Engineering. Y.U. School of Engineering Founded in Departments Computer Engineering (2001) Industrial Engineering (2001) Electronics.
ECE445: The Design Review Sept 2, Documentation Roadmap Request for Approval Proposal Design Review Final Paper &Presentation Sept 10Sept 16Sept.
Gravity Fed System Team Members: Chris Kulbago, Lauren Pahls, Ted Rakiewicz, Patrick O’Connell, Sarah Salmon, James Brinkerhoff Group Number:
P16453 Problem Definition Review Kris Kidder | John Dolan | Shay Stanistreet | Anthony Miuccio.
 Derek Blash  Team Leader  Faculty Liason  Sarah Hoefker  Secretary  Kyle Latz  Finance Officer  Client Liason.
P15080: Flow Culture System Multi-Disciplinary Senior Design Problem Definition Review September 11, 2014 Collin Burkhart – Lead Mechanical Engineer Katelyn.
VEX Robotics Team “Kickoff” Sept. 17 th, Topics Welcome and Introductions Contact form for ACTC Robotics Website Robotics Handbook Team Website.
Week 5 Status Updates 6/23/08 – 6/27/08. Attitude Control System Update Day 39.
Mixed-Signal Option for the Teradyne Integra J750 Test System
P08311: FPGA Based multi-purpose driver / data acquisition system Sponsor: Dr. Marcin Lukowiak Team MemberDisciplineRole Andrew FitzgeraldCEProject Manager/FPGA.
PC Based Spectrum Analyzer April 29, 2003 May03-10 Faculty Advisor: Dr. DJ Chen Michael Cain Paul Heil Eric Rasmussen Aung Thuya Client: Teradyne Inc.
Electrophotographic Cascade Development Apparatus Zachary FoggettiBridget Kearney Dalton MeadRuishi Shen Michael WarrenThomas Wossner.
P13631: Gravity Fed Flow Process Control Teaching Aid An RIT education couples theory in lecture with practical application in lab. In the past, carts.
EG1003: Introduction to Engineering and Design Laboratory 4: Sensors.
Abstract The purpose of this project is to design a high-performance FPGA-controlled amplifier for Teradyne Corporation. This will constitute Phase IV.
ELVIS Educational Laboratory Virtual Instrumentation Suite: Phase II Abstract Problem Statement The goal of this project is to convert the EE 201 labs.
EG1003: Introduction to Engineering and Design Laboratory 4: Sensors.
T Project Review Sotanorsu I2 Iteration
CIW Lesson 10 Part A NAME:____________________________.
Toll Free Gmail Customer Service Phone Number Gmail Customer Service Phone Number
NTC 362 Week 2 Summary To purchase this material click below link 362/NTC-362-Week-2-Learning-Team- Analog-and-Digital-Comparison-Paper.
#2.7: SDR Band Output Validation Device
TEAM 3-WEEK PLAN ASHLYNN COLE KENNETH YUAN RAVEN
AUTOMATIC SHIFT CONTROLS FOR ATV SPONSOR: POLARIS INDUSTRIES
Malwarebytes Help Support Number More info :
Welcome To Yahoo Customer Support Call Toll-Free :
Job Oriented Courses after Electrical Engineering Job Oriented Courses after Electrical Engineering.
Welcome To Yahoo Customer Service Call Toll-Free :
Dell Customer Support. Our Support team Call dell customer support by dialing (toll free) for quick help we have highly qualified technical.
P15311: PCB Router Phase 5 System Pass Off with Customer
P17082 Biomechanical Elbow Model Final Presentation
Laboratory 4: Sensors Matthew R. Gaglio, Feb 2007.
University of Idaho – Interdisciplinary Engineering Capstone Design
P16462: Wind Energy Base Station MSD II Phase 5 Review 5/6/2016
Solar Design and Drafting Training Hyderabad Solar Design and Drafting Training Hyderabad.
2.009 Final Presentation Team Yellow December 10, 2007
Investigating Electricity
Heart Pump and the Circulatory System P17080

FPGA Controlled Amplifier Module May 06-14
HP PRINTER CUSTOMER SUPPORT The printer has grown into an important peripheral device that helps users to convert a digital document into print versions.
University of Idaho – Interdisciplinary Engineering Capstone Design
Presentation transcript:

P13631 Functional Review James Brinkerhoff, Christopher Kulbago, Patrick O’Connell, Lauren Pahls, Ted Rakiewicz, Sarah Salmon

Schedule & Planning

Budget & Costs

Customer Needs Did we meet them? Customer need:Does project fulfill need? SafetyYes ErgonomicsYes MobilityYes Teaching ManuallyYes Teaching Auto-ControlsAlmost Ease of AssemblyYes Low CostYes Use of LabVIEWYes Drained Tank DynamicsYes

Engineering Specifications In order to complete the project, the group had to translate customer needs into technical specifications. How well the group did in staying within the 19 specifications is summarized below:

Specifications Met: Part 1

Specifications Met: Part 2

Specifications Met: Part 3

Specification Assumed Met

Contingency Plan for Assumed Specification Contact 4 th year chemical engineering students to test cart after apparatus is fully assembled and connected with LabVIEW. Conduct time and operation trials on all contacted persons with cart and lab manual.

Electrical Issues Remaining Issues o Digital to analog converter code o I/P circuit Result: Unmet Specification o Manual P/PI control can be achieved, but complete control through LabVIEW is not yet possible.

Action Plan for Electrical Issues PID Automatic Control o Fix issues with digital to analog converter code. o Continue testing PID control. o Continue testing and finalize circuit.

Deliverables Technical Paper o Whole team will review paper and sign copyright forms before 11/22. Lab Manual o Team will turn in Lab Manual by 11/22. Assembly/Maintenance Manual o Team will turn in assembly manual by 12/12. Technical Poster o Team will turn in poster by 12/2. Edge Website o Team will complete Edge by 12/12. Final Presentation o Whole team will rehearse for presentation before 12/5.

Questions?