20to2T5m100cm Images Van Graves February 13, 2014.

Slides:



Advertisements
Similar presentations
G2p Hall Infrastructure Alan Gavalya May Overall g2p Target on Pivot in Hall A.
Advertisements

Mercury Chamber Update V. Graves NF-IDS Meeting October 4, 2011.
Summary of the discussion for the commissioning session 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 6/ 1/ 2006 T.Okugi (KEK)
Managed by UT-Battelle for the Department of Energy Neutrino Factory Mercury Containment Concepts V.B. Graves 2 nd Oxford-Princeton High- Powered Target.
Neutrino Factory Target Cryostat Review Van Graves Cale Caldwell IDS-NF Phone Meeting August 10, 2010.
Neutrino Factory Mercury Flow Loop V. Graves C. Caldwell IDS-NF Videoconference March 9, 2010.
Particle Production of a Carbon/Mercury Target System for the Intensity Frontier X. Ding, UCLA H.G. Kirk, BNL K.T. McDonald, Princeton Univ MAP Spring.
1Managed by UT-Battelle for the U.S. Department of Energy MERIT Videoconference 11 Mar 2009 Neutrino Factory Cryostat 1 Concept V.B. Graves MERIT Videoconference.
1Managed by UT-Battelle for the U.S. Department of Energy NF/IDS Hg Vessel Layout 30 Jun 09 Cryostat 2 Front Drain Mercury Vessel Concept Matthew F. Glisson.
MERIT Primary Containment Inspection Van Graves MERIT Video Conference October 13, 2010.
MERIT Beam Collimator Design Nicholas Olesen 9 August 2006.
KT McDonald Muon Collider 2011 June 28, The Target System Baseline K. McDonald Princeton U. (June 28, 2011) Muon Collider 2011 Telluride, CO More.
1Managed by UT-Battelle for the U.S. Department of Energy NF-IDS Videoconference 2 Jun 2009 Neutrino Factory Magnet Layout Comparison V.B. Graves NF-IDS.
KT McDonald Target Studies Meeting June 14, Mechanical Issues for the Target System K. McDonald Princeton U. (June 14, 2011) Target Studies Meeting.
High Power Hg Target Conceptual Design Review Hg Target Interface with Solenoid V.B. Graves P.T. Spampinato T.A. Gabriel Oak Ridge National Laboratory.
1Managed by UT-Battelle for the U.S. Department of Energy NMFCC Friday Meeting 10 Apr 2009 Neutrino Factory Nozzle Layouts V.B. Graves NFMCC Friday Meeting.
IDS-NF Target Studies H. Kirk (BNL) July 8, 2009.
GlueX Simulations Status Report on CD3 geometry Richard Jones GlueX Collaboration Meeting, Newport News, January 10-12, 2008.
MERIT Primary Containment Inspection – HandySurf Review Van Graves MERIT Video Conference November 24, 2010.
1Managed by UT-Battelle for the U.S. Department of Energy NF Splash Mitigation 12 July 2011 Neutrino Factory Mercury Pool Splash Mitigation V.B. Graves.
Managed by UT-Battelle for the Department of Energy Review of NFMCC Studies 1 and 2: Target Support Facilities V.B. Graves Meeting on High Power Targets.
Mercury Chamber Considerations V. Graves IDS-NF Target Studies July 2011.
US ITER TBM Meeting Idaho Fall, Idaho, Aug M Dagher P Fogarty 1.TBM/ITER General Arrangement 2.Equatorial Test port Configuration 3.Test Port.
1Managed by UT-Battelle for the U.S. Department of Energy MERIT Videoconference 5 Aug 2009 Cryostat Front End Design Update Matthew Glisson Van Graves.
Review of the mechanical design of the final focusing region of the HIF Point Design T. Brown ARIES Project Meeting January 8, 2003.
IDS-NF Mercury System Overview Van Graves IDS-NF 5 th Plenary Meeting April 9, 2010.
HPS Test Run Setup Takashi Maruyama SLAC Heavy Photon Search Collaboration Meeting Thomas Jefferson National Accelerator Facility, May 26-27,
Neutrino Factory Mercury Vessel: Initial Cooling Calculations V. Graves Target Studies Nov 15, 2012.
Progress on the New High Intensity Cold Neutron Spectrometer, MACS C. Broholm 1,2, T. D. Pike 1,2, P. K. Hundertmark 1,2, P. C. Brand 2, J. W. Lynn 2,
Status Report on Mk.II Pepperpot Simon Jolly Imperial College 13 th June 2007.
05/30/08J. Dunne -- SANE Collaboration Meeting 1 Beamline Status Upstream beamline –Chicane –SEM –Rasters –Girder Downstream beamline –Helium bag –Extension.
Review of Recent IDS120 Target Concepts Van Graves October 31, 2013.
1 Status of Neutrino Beamline Construction K. Nishikawa IPNS, KEK 2006 . 12 . 4.
Hall D Design Status GlueX Collaboration Meeting JLab, December 11-13, 2003 Ravi Anumagalla.
Target Magnets & Shielding Bob Weggel Particle Beam Lasers, Inc. Magnet Optimization Research Engineering, LLC. March 5,
October 2005 Qweak Collaboration Meeting Detailed Design of Shield House and Collimators wrt Backgrounds Yongguang Liang Just getting started – will probably.
IDS120j WITHOUT RESISTIVE MAGNETS: NEW Hg MODULE mars1510 ( DESKTOP ) vs. mars1512 ( PRINCETON CLUSTER ) Nicholas Souchlas, PBL (3/28/2012) 1.
Shield Module Design Considerations Adam Carroll Van Graves July 3, 2014.
Kinetic Energy Spectra of pi +, pi -, mu +, mu - and sum of all from the 20to4T5m Configuration X. Ding Front End Meeting June 23,
IDS120j WITHOUT RESISTIVE MAGNETS ( 20 cm GAPS AND 15.8 g/cc W BEADS ) AZIMUTHAL DPD DISTRIBUTION STUDIES FOR: BP#1, SH#1, SHVS#1/LFL, SC#1+SC#2, BeWind.
Recent Electron-Cloud Mitigation Studies at KEK E-cloud mitigation mini-workshop on November at CERN Kyo Shibata (for KEKB Group)
SiD Collaboration Meeting Highlights Tom Markiewicz/SLAC ILC BDS Meeting 08 May 2007.
IDS120j WITHOUT RESISTIVE MAGNETS MODIFYING Hg MODULE Nicholas Souchlas, PBL (11/1/2012) 1.
Proton Driver – Target Station Interfaces Keith Gollwitzer Fermilab Wednesday May 28, 2014 MAP 2014 Spring Meeting.
IDS120j WITH AND WITHOUT RESISTIVE MAGNETS PION AND MUON STUDIES WITHIN TAPER REGION, III ( 20 cm GAPS BETWEEN CRYOSTATS ) Nicholas Souchlas, PBL (9/4/2012)
IDS120j WITHOUT RESISTIVE MAGNETS SEMGENTATION STUDIES FOR BEAM PIPE BEYOND FIRST CRYOSTAT ( 20 cm GAPS AND 15.8 g/cc W BEADS ) Nicholas Souchlas, PBL.
T2K Remote Handling T. Sekiguchi (KEK) on behalf of Tada (KEK) 2012/11/10.
Joint Belle SuperB Background Meeting Feb 9 – 10, 2012 SuperB SR bkgds 1 SR Backgrounds in SuperB M. Sullivan For M. Boscolo, K. Bertsche, E. Paoloni,
IDS120j WITHOUT RESISTIVE MAGNETS SEMGENTATION STUDIES FOR BP#2 WITHIN FIRST CRYOSTAT AND RIGHT FLANGE OF Hg POOL INNER VESSEL ( 20 cm GAPS AND 15.8 g/cc.
Neutrino Factory Target Vessel Concept Update V. Graves Target Studies EVO June 12, 2012.
Neutrino Factory Target Cryostat Review (Update Aug 12) Van Graves Cale Caldwell IDS-NF Phone Meeting August 10, 2010.
LBNE Remote Handling Layout Options Adam Carroll Van Graves Tom Burgess FNAL/ORNL Videoconference March 11, 2010.
Target On axis field [scale /20 T] Target Magnets Decay-Channel Triplets Taper magnets.
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
IDS120j WITHOUT RESISTIVE MAGNETS: NEW Hg MODULE
Design of the MANX experiment
Cooling Update (27 March 2014)
Cooling Update (25 February 2014)
LHC INJECTION SEPTUM MSI (1/3)
Additional Upstream Coil Shielding
Magnetic gap calculation
Interaction Region Design Options e+e- Factories Workshop
Additional Upstream Coil Shielding
SHMS Master Layout-Rays
OLYMPUS Collaboration Meeting Luminosity Monitor Calorimeter
MERIT Beam Collimator Design
SoLID SIDIS He3 target collimator optimization
Beam Halo Considerations for Back Angle Running
Cooling Update (27 March 2014)
IR Beam Transport Status
Presentation transcript:

20to2T5m100cm Images Van Graves February 13, 2014

2Managed by UT-Battelle for the U.S. Department of Energy 20to2T5m100cm Images 13 Feb 2014 Overall View with 5 Cryostats Beam extends to Z=1-0m Target chamber extends to Z=-5m Placeholder focusing magnet shown near Z=-5m

3Managed by UT-Battelle for the U.S. Department of Energy 20to2T5m100cm Images 13 Feb 2014

4Managed by UT-Battelle for the U.S. Department of Energy 20to2T5m100cm Images 13 Feb 2014 Target Region Chamber extension would require supports and helium channels

5Managed by UT-Battelle for the U.S. Department of Energy 20to2T5m100cm Images 13 Feb 2014

6Managed by UT-Battelle for the U.S. Department of Energy 20to2T5m100cm Images 13 Feb 2014 Target Extraction Beam path to focusing magnets is at slight angles to the magnetic axis Upstream end of main cryostat Z=-2.3m, target length 3.6m inside cryostat Target cannot be extracted without first removing focusing magnet(s)

7Managed by UT-Battelle for the U.S. Department of Energy 20to2T5m100cm Images 13 Feb 2014 Front Elevation Views

8Managed by UT-Battelle for the U.S. Department of Energy 20to2T5m100cm Images 13 Feb 2014

9Managed by UT-Battelle for the U.S. Department of Energy 20to2T5m100cm Images 13 Feb 2014

10Managed by UT-Battelle for the U.S. Department of Energy 20to2T5m100cm Images 13 Feb 2014 Target Chamber Views

11Managed by UT-Battelle for the U.S. Department of Energy 20to2T5m100cm Images 13 Feb 2014

12Managed by UT-Battelle for the U.S. Department of Energy 20to2T5m100cm Images 13 Feb 2014 Target Chamber Isometrics

13Managed by UT-Battelle for the U.S. Department of Energy 20to2T5m100cm Images 13 Feb 2014

14Managed by UT-Battelle for the U.S. Department of Energy 20to2T5m100cm Images 13 Feb 2014 Downstream Beam Windows Double Be windows at both ends of each cryo module 23cm IR, 1mm thick, 1cm gap All these are replaceable maintenance items

15Managed by UT-Battelle for the U.S. Department of Energy 20to2T5m100cm Images 13 Feb 2014 Window Close-up

16Managed by UT-Battelle for the U.S. Department of Energy 20to2T5m100cm Images 13 Feb 2014 Window Attachment Tungsten shield module Gasket requires precise surface on shielding Be windows Interstitial gap requires monitoring (line not shown) Space for fasteners (tapped hole in shielding not shown)